Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 19,600Document Cost
₹ 1,888Tender Fee
Refer Documents
Summary
Inserting D30 Tower In 1stkm Feeder For Statutory Clearance
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSEB_708969_1Bid Award Id
ViewTender No
06/24-25/AEE-TSD-KDA/Dated 25.11.2024Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. In ordinary rocks.
21.14
422
8934.61
... More
Extra for every additional lift of 1.5 m or part there of in excavation / banking excavated or stacked materials,All kinds of soil
38.44
108
4165.74
... More
Extra for every additional lift of 1.5 m or part there of in excavation / banking excavated or stacked materials,In ordinary rocks
21.14
194
4108.77
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3coarse sand : 6 graded stone aggregate 40 mm nominal size)
3.14
7346
23068.86
... More
Centering and shuttering including strutting, etc. and removal of form for:
Foundations, footings, bases of columns, etc for mass concrete
19
341
6490.78
... More
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
43.56
879
38327.57
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
1700
100
170255
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.
All work upto plinth level
10
9590
95905.8
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.
All work above plinth level upto floor V level
7.02
11273
79141.65
... More
Add for using extra cement in the items of design mix over and above the specified cement content therein
37.6
807
30359.37
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
94.6
263
24920.48
... More
Stub setting (using template/probe) for 110kV towers. Erection of stub, stub template, fixing of jack for supporting templatte, alignment and levelling for exact location of stubs of stub setting templates,dismantling of template after completion of initial curing of cement concrete, movement of template from one locatin to another etc.complete a directed by Board staff-For 110kV DC Tower
2
8422
16845.62
... More
12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
18
408
7357.68
... More
Transport of materials issued departmentally for the works form deparmental stores (Angamally) and distribution to locations for erection including storage if necessary, loading and unloading charges etc. (Average one side distance=155km) (inclusive of loading and unloading charges with a lead of 50m by head load and initial lift of 1.5 m at each end)
7
2833
19832.75
... More
Erection of tower super structure above ground level including erection of normal and special hill side extension members whenever necessary providing tower acessories like phase, danger and number plates, bird gaurds, anticlimbing devices etc. complete
6
12168
73012.5
... More
Drilling of holes (Labour for drilling 16 holes)
20
128
2577.2
... More
Cutting of Steel angles (Labour for cutting 8 nos of steel angles)
20
257
5154.4
... More
Pipe earthing Excavation of earth pit of size 0.3x0.3x3.6m including over excavation on account of slopping the banks and necessary hire for planks for filling of charcoal, earthing of tower by means of a 50mm dia, 3.0m long pipe and a double run 7/9 S.W.G galvanized steel wire or GI tape including cost of charcoal but excluding cost of pipes,steel wire or GI tape with connecting lugs,nuts etc. which will be supplied at departmental stores.
2
9206
18413.18
... More
Paving out, stringing and tensioning as per standard of 3 line ACSR WOLF conductors including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor to the insulator strings using suspension clamps with armour loads and tension clamps, jumpering the conductors at tension points, joining the conductors and pilot wire wherever necessary, installation of vibration dampers, hire charges of tractor and stringing tools, all hire and labour for protective trestle work, providing suitable back stays at the time of stringing, etc. complete.
0.1
227066
22706.64
... More
Paving out, stringing and tensioning as per standard of one7/9 OR 7/3.66 stranded steel earth wire including fixing the conductors on to the tower top using tension clamps and suspension clamps, jumpering the conductors attension points, jointing the conductor wherever necessaryerection ofearthbonds,hirecharges of tractor and stringingtools,etc. Complete.
0.5
39100
19550.27
... More
Dismantling of existing ACSR WOLF conductor
0.1
113533
11353.32
... More
Dismantling of existing earth conductor
0.45
31187
14034.49
... More
Arranging scaffoldings on either sides of the Main road
as per the directions of dept. officers excluding hire charges of
materials.
2
5461
10923.28
... More
Dismantling one set tension string with conductor from D-shackle of the 66/110kV tension tower after tensioning the conductor by using special appliances after giving jumper connections, then lowering the conductor with tension string, dismantling existing tension clamp with fittings from the conductor, marking the position of the tension hardware fittings after changing the damaged portion of line conductor if any with new conductor and providing single tension hardware fittings/double tension hardware fittings(double tension hardware fittings for road crossings etc.) on the conductor using compressor, replacing damaged disc insulators ,re-assembling the insulator string to the tension hardware fittings with conductor, lifting the same, re-assembling to the existing D-shackle at the cross arm and giving necessary jumper connections etc. as per the direction of departmental staff. Special tools if available will be supplied at free of cost
6
6484
38908.26
... More
Providing derrick support and temporary stay
arrangement for a tower
2
4821
9642.86
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements