Kerala Industrial Infrastructure Development Corporation Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Industrial Infrastructure Development Corporation - KINFRA Tender
Eprocure
Opening Date25 Nov 2019
Closing Date9 Dec 2019
Tender Amount₹ 43,62,525 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 50,000Document Cost
₹ 2,975Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_KINFR_324550_1Bid Award Id
ViewTender No
KINFRA/KIAP/38/2019-20Tender Authority
Kerala Industrial Infrastructure Development Corporation ViewPurchaser Address
-Website
http://http://kinfra.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level -1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size).
28
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level - 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
240
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights-Lintels, beams, plinth beams, girders, bressumers, cantilevers and stud.
565
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights-Suspended floors, roofs, landings, balconies and access platform.
1235
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level-thermomechanically treated bars.
14850
-
-
... More
Plastering with cement mortar 1:4(1 cement & 4 sand) 12mm thick floated hard and trowelled smooth.
245
-
-
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : - Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
245
-
-
... More
Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of cable trench in position including all labour charges and miscellaneous expenses etc complete.
160
-
-
... More
Transporting the newly casted R.C.C covering slabs from casting yard to the required location by mechanical means up to a distance of 1km including loading, unloading and hire charges of all tools and plant etc complete as per the direction of engineer in charge
160
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements