Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Irrigation Department

Ernakulam, Kerala

  • Opening Date

    03 Sep 2019

  • Closing Date

    19 Sep 2019

  • Tender Amount

    ₹ 13,38,855

  • EMD

    ₹ 37,500

Reminder

Follow

Download
Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Sdrf Main Canal Flood Damages 2018 Repairs Of Damaged Canal Structures Leak Proof Application For The Aqueduct From Ch 10090 M To 10230 M

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items
... more
Scheme-1 Ch. 10090-10105

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

24

-

-

... more
app-1

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-2 ch.10105 to 10120

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

24

-

-

... more
app-2

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-3 ch. 10120 to10135

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

24

-

-

... more
app-3

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-4 ch. 10135 to 10150

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

24

-

-

... more
app-4

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme 5 ch. 10150 to 10165

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

65

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

25

-

-

... more
app-5

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-6 ch. 10165 to 10180

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

25

-

-

... more
app-6

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-7 ch. 10180 to 10195

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

24

-

-

... more
app-7

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-8 ch. 10195 to 10210

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

60

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

24

-

-

... more
app-8

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-9 ch. 10210 to 10220

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

50

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

23

-

-

... more
app-9

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

... more
Scheme-10 ch. 10220 to 1010230

-

-

-

... more
16.4 : Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy

50

-

-

... more
od17207/2019_2020/P2 : Sealing of cracks/ porous concrete by injection process through nipples with sealing compound. polyurethane (BASF Master Roc MP 355) and its accelerator complete as per Technical specification and cleaning grouting pump and the surface area where the leak proofing are done as per the direction of departmental officers at site

23

-

-

... more
app-10

-

-

-

... more
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.

39

-

-

GOVERNMENT OF KERALA WATER RESOURCES (IRRIGATION ) DEPARTMENT Idamalayar Irrigation Sub Division No:1, Angamaly- 683572 e-Government Procurement (e-GP) NOTICE INVITING TENDER No:DB/2019/1403/P2 Date-03/09/2019 E-TENDER NO. 1/ET/AEE 1/IIP/2019‐20/S The Assistant Executive Engineer , Idamalayar Irrigation Sub Division No:1,Angamaly- 683572, for and on behalf of the Governor of Kerala invites online bids on item rate basis, from the registered bidders of Irrigation Department / PWD of Government of Kerala for the following work. 1 Name of work SDRF Main canal –Flood damages 2018 repairs of damaged canal structures leak proof application for the aqueduct from ch. 10090 m to Ch. 10230 m. 2 Name of Division IIP Sub Division No:1,Angamaly 3 Estimate Amount Rs. 15,00,000/- 4 Earnest Money Deposit (EMD) Rs.37,500/- (e-payment only) 5 Tender Submission Fee Rs.2800/- (e-Payment only) 6 Period of Completion 9 months 7 Classification of Bidder D Class and above 8 Tender documents Can be downloaded from e-GP Website www.etenders.kerala.gov.in 9 Document download starting date 03.09.2019 , 4 .00 PM 10 Document clarification period if required 03.09.2019,4 .00PM to 18.09.2019, 4.00 PM 11 Online bid submission starting date 03.09.2019,4.00PM 12 Online bid submission closing date 19.09.2019,4.00PM 13 Last date and time of receipt of relevant document as mentioned (NIT) by speed post 25.09.2019 11.AM 14 Date and time of opening of online tender bid 25.09.2019 11.30 AM 15 Address of tender inviting Authority Assistant Executive Engineer, Idamalayar Irrigation Project Sub Division No:1 Angamaly-683572 Tender documents and tender schedule may be downloaded free of cost from the e-GP Website www.etenders.kerala.gov.in The bid submission fee and EMD shall be remitted online as per e-tendering process. All bid / tender documents are to be submitted online on the e-GP website. Tenders / bids shall be accepted only through online mode on the e-GP website and no manual submission of the same shall be entertained. Late tenders will not be accepted. Additional Documents to be submitted through online/Speed Post SL. No. Scanned Copy (Through online cover) Through Speed Post (Super scribing Name of work and Tender No.) Copy of Regn. Certificate attested by Gazetted Officer of Govt. Department with validity and class of registration. Copy of Regn. Certificate attested by Gazetted Officer of Govt. Department with validity and class of registration. Copy of EMD exemption certificate / concession certificate attested by Gazetted officer of Govt. Department, if any. Copy of EMD exemption certificate / concession certificate attested by Gazetted officer of Govt. Department, if any. Preliminary agt. in Stamp paper worth Rs.210/- duly filled and signed by bidder. Original of Preliminary agt. in Stamp paper worth Rs.210/- duly filled and signed by bidder. Copy of Govt. Orders and proof of eligibility in participation in tendering etc. in case of Labour Contract Co- operative Society. Copy of Government orders and original of proof of eligibility in participation in tendering etc. in case of Labour Contract Co- operative Society. Duly filled E-payment requisition. Duly filled E-payment requisition. Any other certificate required for tender acceptance. Attested copy of any other certificate required for tender acceptance. The bids shall be opened online at the office of the Assistant Executive Engineer,IdamalayarIrrigation Project Sub Division No:1 Angamaly-683572 , at the above mentioned date and time by the Assistant Executive Engineer, Idamalayar Irrigation Project Sub Division No:1 Angamaly in the presence of the Bidders or their authorized representatives who are present a

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.