INKEL Limited Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

INKEL Limited - INKEL Tender

Works
Eprocure
Opening Date17 Jan 2020
Closing Date31 Jan 2020
Tender Amount₹ 82,42,460 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Alappuzha Heritage Project - Civil Works For The Construction Of Loom Shed In New Model Coir Society, Alappuzha

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

232

-

-

... More
2.27 : Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.

157

-

-

... More
SH: - 2.00 - CONCRETE WORK

-

-

-

... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

150

-

-

... More
SH: - 3.00 - R.C.C. WORK

-

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

140

-

-

... More
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

8

-

-

... More
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15sup0/sup landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).

10

-

-

... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

374

-

-

... More
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

121

-

-

... More
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts

107

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Extra for shuttering in circular work (20% of respective centering and shuttering items)

107

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

14000

-

-

... More
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more

2000

-

-

... More
SH: - 4.00- MASONRY WORK

-

-

-

... More
50.6.2.1 : Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete

14

-

-

... More
SH: - 5.00 - STEEL WORK

-

-

-

... More
10.16.1 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes

15400

-

-

... More
SH: - 6.00 - FLOORING WORK

-

-

-

... More
Providing and laying at all levels average 50mm thick VDF monolithic flooring laid to slope as per requirements, comprising of 1 portion of cement and 2 parts of coarse sand and 4 parts of 12.5 mm down size stone aggregate by volume . The floor shall be laid in panels formed with the PVC strips of 35 mm x 6 mm of size not more than 10 sq.m. (one side not exceeding 3 m) including sprinkling non-metallic (chemical) floor hardener Nitoflor hard top of Fosroc at the rate of 3 Kg/sqm. before final machine trowelling and finishing as per manufacturer's specification and as per approved layout and curing etc. including all labour, material, plant & equipment etc.,at basement area and other locations complete as directed by the Engineer in charge

392

-

-

... More
8.12 : Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvillinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-charge.a. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent.

5.4

-

-

... More
SH: - 7.00- ROOFING WORK

-

-

-

... More
12.48 : Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)

700

-

-

... More
Providing and laying MP hip and ridge tiles with class AA Mangalore pattern tiles of approved brand including fixing with as surki mortar 1:1/2:8 as directed by Engineer-in-Charge at all levels.

70

-

-

... More
Providing valley by using 20 gauge plain Aluminium sheet or equivalent quality with necessary overlaps at ends,with necessary steel nails ,eve plate etc including necessary scaffolding complete as per the instruction of engineer in charge

14

-

-

... More
Providing fixing on ceiling factory pressed clay decorative floral tile (under mangalore tile roof) of 320mm x 200 mm x 12mm and as per approved pattern on frame work complete including extra lowering charge and scaffolding charges as directed by Engineer-in-Charge.(frame work to be paid separately).

700

-

-

... More
SH: 8- FINISHING WORK

-

-

-

... More
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)

221

-

-

... More
13.3.1 : 20 mm cement plaster of mix:1:4 (1 cement : 4 fine sand)

120

-

-

... More
13.28.3 : 12 mm thick plain cement mortar bands in cement mortar 1:4 ( 1 cement : 4 fine sand) :Raised Band

23

-

-

... More
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work

910

-

-

... More
13.46.1 : Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)

99

-

-

... More
Applying sealer compound one or more coat ( MRF, sheenlac etc.) after filling cracks and undulations in wood work with suitable wooden fillets then cleaning and smoothing the surface with special chisel/tools then sandering with suitable sandering paper so as to get a uniform smooth surface for applying sealer compound in roof members like rafter,wallplates,reeper etc upto 10m height including cost of scaffolding etc complete job as per the direction of Engineer in charge.

37

-

-

... More
Removing rust using Rustolin or Equivalent at all locations prepared and applied as per manufacturer's specifications including cleaning the surface, etc. complete.On steel work

25

-

-

... More
SH:9.00- MISCELLANEOUS BUILDING WORK

-

-

-

... More
Providing and applying Antitermite treatment by injecting. BiFlex TC chemical emulsion for pre-constructional treatment and creating a chemical barrier as per IS 6313 (Part II) 1981 for wall trenches, foundation, top surface of plinth filling, foundation of wall and floor, along the external perimeter of the building, etc. complete conforming to manufacturers specification and as directed by the Engineer-in-Charge. (Plinth area only to be measured for the payment)

400

-

-

... More
Providing and fixing well seasoned second class teak wood roof members in places of damaged one and already removed from position such as rafters, ridge, wall plate,collar, collar pin, flooring joists etc including all labour for ornamental cutting, steps, moulding etc. wherever necessary as per the existing size and shape including all scaffolding charges.Wooden members has to undergo seasoning and season certificate may be produced.

0.34

-

-

... More
4.17 : Making plinth protection 50 mm thick of cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth.

65

-

-

... More
ELECTRICAL WORKS

-

-

-

... More
1.20.2 : Supplying and fixing of following sizes of steel conduit along with accessories in surface/recess including painting in case of surface conduit, or cutting the wall and making good the same in case of recessed conduit as required.25 mm

160

-

-

... More
1.20.3 : Supplying and fixing of following sizes of steel conduit along with accessories in surface/recess including painting in case of surface conduit, or cutting the wall and making good the same in case of recessed conduit as required.32 mm

80

-

-

... More
1.20.5 : Supplying and fixing of following sizes of steel conduit along with accessories in surface/recess including painting in case of surface conduit, or cutting the wall and making good the same in case of recessed conduit as required.50 mm

80

-

-

... More
1.21.1 : Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.20 mm

225

-

-

... More
1.21.2 : Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.25 mm

150

-

-

... More
1.21.3 : Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.32 mm

70

-

-

... More
1.22.4 : Supplying and fixing metal box of following sizes (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including painting etc as required.150 mm X 150 mm X 60 mm deep

6

-

-

... More
1.22.13 : Supplying and fixing metal box of following sizes (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including painting etc as required.200 mm X 300 mm X 60 mm deep

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.