Indian Oil Corporation Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Indian Oil Corporation Limited - IOCL Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date24 Dec 2024
Closing Soon30 Jan 2025
Tender Amount₹ 1,06,46,15,263.67 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
12.75" OD

8780

-

35996484.57

... More
"Laying cased crossings, by auger boring & jacking method, using casing pipes and 3LPE coated carrier pipes, according to drawings, specification(s) and providing all works, labour, inputs and materials/ consumables necessary to perform and complete the works in a ll respect in accordance with the contract, including collecting the pipes and other Owner-supplied materials from Owner#s issue poi nt and loading, transporting them to site, setting out the works, aligning and welding the casing and carrier pipes, 100% radiograp hy of weld joints of carrier pipes, field joint coating, holiday detection & repair of coating, applying atleast 2(two) coats of bit umastic paint over coat of suitable primer over casing pipe and two component epoxy coating for internal surface of casing pipe, exc avating/ trenching and/or boring in all kinds of soil, including rocky strata if any, inserting the casing pipe into the bore, pre-h ydrostatic testing of the carrier pipe and replacement / rectification of defects / pipes, installation of approved type of insulato rs throughout the cased section on the carrier pipe, carefully inserting the carrier pipe inside casing pipe by jacking/ pushing met hod, taking care not to damage the insulators, sealing the ends of the casing pipe with approved heat shrinkable wraparound type end seal, fixing of vent pipes at the ends of the casing pipe, priming and applying two coats of coal-tar based epoxy paint on under ground portion of vent pipes, measuring final resistance between carrier pipe and casing, and doing preparation work necessary to pr oduce correct resistance, applying one coat of primer and two coats of epoxy paint to all exposed and overground fittings & piping, proper compaction of backfill below carrier pipe at either ends, independently supporting the carrier pipe outside each end of the c asing pipe by suitable RCC supports with neoprene rubber sheet below the carrier pipe, and strengthening with sand bags and proper c ompaction of earth below pipe, to prevent differential settlement of carrier pipe and damage to insulators, final clean-up and resto ration of the site and disposal of wastes and surplus in accordance with the contract and supply of all materials (other than those specifically undertaken to be supplied by the Owner under contract) necessary for or in the performance of the work or for temporar y or permanent incorporation in the works, and all other acts, matters and things necessary to make the pipeline ready for commissio ning in all respect, as per directions of Site Engineer/ Engineer-in-Charge. NOTE: 1. The work of cased crossing will include the provision of temporary supports for existing installations in the road and/or railroa ds, the provision of diversions, the restoration of the railroad/embankment to its original state, maintenance for subsidence and a ll other precaution(s), work(s) and/or maintenance expressed or implied in the contract. 2. The work will also include providing necessary independent support to carrier pipe outside each end of casing pipe by suitable RC C supports, proper compaction of backfill below carrier pipe at either ends and strengthening with sand bags and/ or other suitable means so as to prevent differential settlement of the casing pipe and damage to insulators, including all labour, materials etc. as per direction of Site Engineer/ Engineer-in-Charge. 3. All materials (other than the Owner-supplied materials) required for performance of the work shall be sup"

-

-

-

... More
12.75" OD

5

-

125362.67

... More
"Laying cased crossings, by auger boring & jacking method / Horizontal Directional Drilling (HDD) method using casing pipes and 3LPE coated carrier pipes according to drawings/ specification(s) and providing all works, labour, inputs and materials/ consumables nec essary to perform and complete the works in all respect in accordance with the contract, taking delivery and transportation of Owner -supplied 3LPE coated pipes and bare casing pipes to the work site from designated stockpile location, inspection of the coated pipe s visually and/or with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pip es are installed in permanent position, setting out the works, aligning and welding the casing and carrier pipes, 100% radiography of weld joints of carrier pipes, field joint coating, holiday detection & repair of coating, applying a layer of Poly-Urethane Coati ng of min. thickness 1000 microns over a coat of suitable primer to external surface of casing pipe,and two component epoxy coating of min. thickness 600 microns for internal surface of casing pipe, excavating/ trenching and / or drilling/ boring in all kinds of s oil including rocky strata, inserting the casing pipe into the bore, pre-hydrostatic testing of the carrier pipe and replacement / r ectification of defects / pipes, installation of HDPE insulators on the carrier pipe, carefully inserting the carrier pipe inside ca sing pipe by jacking/ pushing method taking care not to damage the insulator and coated carrier pipe, sealing the ends of the casing pipe, as per procedure given in specifications, with heat shrinkable wraparound type end seal of approved make, fixing of vent pipe s at the ends of the casing pipe, priming and applying two coats of coal tar based epoxy paint on underground portion of vent pipe s, measuring final resistance between carrier pipe and casing, and doing preparation work necessary to produce correct resistance, a pplying one coat of primer and two coats of epoxy paint to all exposed and overground fittings & piping, proper compaction of backfi ll below carrier pipe at either ends, independently supporting the carrier pipe outside each end of the casing pipe by suitable RCC supports on firm base with neoprene rubber sheet below carrier pipe and strengthening with sand bags and proper compaction of earth below pipe, to prevent settlement of carrier pipe and damage to insulators, final clean-up and restoration of the site and disposal of wastes and surplus in accordance with the contract and supply of all materials (other than those specifically undertaken to be s upplied by the Owner under contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works, and all other acts, matters and things necessary to make the pipeline ready for commissioning in all respects. NOTE: 1. The work of cased crossing will include the provision of temporary supports for existing installations in the road and/or railroa ds, the provision of diversions, the restoration of the railroad/ embankment to its original state, maintenance for subsidence and all other precaution(s), work(s) and/or maintenance expressed or implied in the contract. ... continuation in the next line"

-

-

-

... More
12.75" OD

5

-

108726.56

... More
"Laying submerged crossings using pipes with or without concrete sheathing across major water course crossings and providing all wor ks,labour, inputs and materials/consumable necessary to perform and complete the work in all respects in accordance with the contrac t, including taking delivery and transportation of Owner-supplied coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area req uired thereof till the pipes are installed in permanent position, arranging the required additional land for construction purpose, p reparation of site, aligning, bending, lining up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair of coating, hydrotesting (both pre- & post-installation) and replacement of pipes/ defect s, excavation of the trench to required depth, as per specifications, in all kinds of soil and conditions including rock trenching a nd maintenance of trench in all kinds of soil including rocky strata, if any, making bunds for stoppage of water flow, de-watering i ncluding installation of well-point system, and laying of the pipeline in approved trench, including de-watering, providing in-situ concreting at coated weld joints to effectively secure the HDPE conduit with mainline pipe, providing ""Band IT"" make stainless ste el (SS) strips / clamps of 3/4"" width for tying HDPE conduit with mainline pipe (two strips per pipe length), backfilling and final clean-up, stabilisation of the excavated banks by additional means, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for or i n the performance of the work or for temporary or permanent incorporation in the works and all other acts, matters and things nec essary to complete the pipeline/ crossings in all respects according to the contract and as per directions of Site Engineer/ Enginee r-in-Charge. NOTE : I)Depending upon the site condition & location of each submerged crossing, the Engineer-in-Charge, in consultation with the Contract or, shall decide upon the precise operations necessary for the performance of the work to lay the pipeline across the canal/ drain/ rivers and the cost of all such operations necessary shall be deemed to have been included in the rate for this item. II)Profile of drain / canal bed, ground & top of laid pipe shall be established jointly in presence of Owner both before and after l aying the crossing, by taking levels with reference to nearby permanent structure. III)The banks of the crossing shall be stabilised and suitable brick/ stone masonry bank protection works shall be carried out for t he entire ROW width to prevent bank erosion leading to exposure of the pipeline. The procedure for such measures shall be submitted for Owner's approval prior to execution. IV)Concrete sheathing work for submerged crossings shall be paid for separately under relevant item of Schedule of Rates."

-

-

-

... More
12.75" OD

5

-

95579.71

... More
"Laying pre-coated pipes in Marshy areas with concrete sheathing including providing all equipment, works,labour, inputs and materia ls/consumable necessary to perform and complete the work in all respects, submission of construction procedure for Owner's approval, arranging the required additional land for construction purpose, preparation of site including dewatering, aligning, bending, linin g up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair o f coating, hydrotesting testing and replacement of pipes/ defects, excavation of the trench to required depth in all kinds of soil a nd conditions including rock trenching and maintenance of trench in all kinds of soil including rocky strata, if any, and laying of the pipeline in approved trench, backfilling and final clean-up, stabilisation of the excavated banks, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner unde r the contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works and all o ther acts, matters and things necessary to complete the work in all respects according to the contract. NOTE: 1. Depending upon the site condition, the Engineer-in-Charge, in consultation with the Contractor, shall decide upon the precise op erations necessary for the performance of the work to lay the pipeline across the canal/drain/rivers and the cost of all such operat ions necessary shall be deemed to have been included in the rate for this item. 2. Concrete sheathing work for marshy area laying shall be paid for separately under relevant item of Schedule of Rates. 3. Measurement for this item shall be as per pipe book covering laying in Marshy portion covering laying in Marshy portion covering entire concrete sheathing work only."

-

-

-

... More
12.75" OD

5

-

69161.28

... More
"Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique including mobilization & de-mobilizatio n at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and ar ranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the spe cifications, drawings and as per all provisions of the contract document complete in all respect as per the instructions of the Engi neer – in – charge /Site engineer. Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspecti on of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage are a required thereof till the pipes are installed in permanent position. Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includi ng defects/ damages occurring during transportation and handling. String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radio graphy (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiograp hs, repair of defects in the welds and re-testing etc. Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of de fects and retesting etc. Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut s ections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut s ections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the car rier pipeline). Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with th e carrier pipeline). ... continuation in next line"

-

-

-

... More
"... in continuation to the previous line Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operatio n to the correct profile as per the approved drawings in a pre-reamed hole of appropriate. Carrying out post-installation coating survey as per approved procedure. Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, c alculations and construction method statement, leading to successful completion of the works. Note :- The item to be operated under the specific instruction of Engineer in Charge"

-

-

-

... More
12.75"

350

-

5460628.18

... More
"Providing & Laying Concrete sheathing on the carrier pipe i.e., continuous concrete coating (mix 1:1.5:3) using specified (approved ) wire mesh reinforcement as per approved drawing and technical specifications, including supply of cement, steel wire mesh, aggrega te, sand, shuttering and all other materials, consumables, inputs, equipment for concrete sheathing required to complete the job, te sting of concrete coated pipes etc. and as per direction of Engineer-in-Charge. NOTE: I) Payment shall be made for the actual length of pipe coated with concrete. Ends of pipe left uncoated/ shall not be considered in the concrete coating length II) The rates shall include compensation for additional hardship caused in handling and/ or lowering the pipe with concrete coating. The above item shall be executed at the discretion and directions of Engineer-in-Charge. III) The rates shall include the concrete sheathing / coating over weld joints in order to arrive at continuously concrete coated pi peline. This weld joint concrete sheathing / coating shall be applied after the hydrostatic pre-test."

-

-

-

... More
12.75"

2.5

-

11651.5

... More
"Extra for rock trenching for Mainline laying (covered under relevant item of this SOR) as classified by the Engineer-in-Charge and performed by pneumatic tools or by drilling and blasting or by chiselling out including cost of all equipment, materials, labour, co nsumables & inputs to complete the work (excluding sand padding around mainline pipe which shall be paid separately) as per specific ations, approved procedure and instructions of Engineer-in-Charge. Note: 1.Payment shall be made for rock actually excavated at site or calculated based on the trench dimensions stipulated in the specifica tions / drawings, whichever is less. 2.Item shall be operated under specific instructions from Engineer-in-Charge. 3.Controlled Blasting operation shall be carried out only by authorized and trained / skilled manpower, as per approved procedure, a nd taking due care & precaution to adjoining property, people, livestock etc., with due approval from Engineer-in-Charge 4.Sand padding around mainline pipe shall be paid separately as per relevant item in SOR 5. Additional 150 mm depth of excavation to be carried out in rocky area (for pipe trench) to accommodate sand padding"

200

-

229290.52

... More
"Supplying, providing and filling fine sand in trenches in hard rocky stretches (Excluding additional 150mm deep trenching for rock trenching) around mainline pipe for providing a minimum padding thickness of 150 mm on top as well as at bottom of the mainline pip e. NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be paid separetly under item for ""Extra for Rock trenching"""

-

-

-

... More
12.75"

100

-

94706.8

... More
"Supplying, providing and filling Soft Soil in trenches in hard rocky stretches (excluding additional 150mm deep rock trenching) aro und mainline pipe for providing a minimum padding thickness of 150mm on top as well as at bottom of the mainline pipe. In all cases where rock or gravel or moorum or hard soil is encountered in the bottom of the trench, trench padding, Rock Shield Mat erials and sand/soft soil bags as approved by OWNER/Engineer-in-Charge, shall be provided to safeguard the pipe coating. Padding mat erials shall be graded soil/other suitable material containing no gravel, rock, or lumps of hard soil. The graded soil for padding s hall pass through sieve size ASTM-10 or ISO-2.00. Acceptable padding shall be placed under the pipeline before its installation and around it after installation, to establish at both sides and on top of the pipe a permanent layer of padding. The thickness of compa cted padding shall be at least 150mm. The trench shall be deeper by at least 150mm. The trench shall be evenly and sufficiently padded to keep the pipe, when in place, at least 150mm above the bottom of excavated trench. NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be paid separetly under item for ""Extra for Rock trenching"""

-

-

-

... More
12.75"

10

-

6355.36

... More
"Supplying, providing and filling fine sand in trenches at Seismic Fault location crossing or running parallel to pipeline (includin g additional 500 mm deep & 200/300 mm wide trenching) around mainline pipe for providing a minimum padding thickness of 500 mm on to p as well as at bottom of the mainline pipe(for the complete trench width). Note: (i) Item to be operated under specific instructions from Engineer-in-Charge. (ii) Cost of additional depth of 500mm & width of 200/300 mm trenching for this item shall be included in this item itself."

-

-

-

... More
12.75"

10

-

27913.73

... More
"Supplying, providing and filling soft soil in trenches at Seismic Fault location crossing or running parallel to pipeline (includin g additional 500 mm deep & 200/300 mm wide trenching) around mainline pipe for providing a minimum padding thickness of 500 mm on to p as well as at bottom of the mainline pipe(for the complete trench width). Padding materials shall be sand/graded soil/other suitable material containing no gravel, rock, or lumps of hard soil. The graded so il for padding shall pass through sieve size ASTM-10 or ISO-2.00. Acceptable padding shall be placed under the pipeline before its i nstallation and around it after installation, to establish at both sides and on top of the pipe a permanent layer of padding. The th ickness of compacted padding shall be at least 150mm. The trench shall be deeper by at least 150mm. The trench shall be evenly and sufficiently padded to keep the pipe, when in place, at least 150mm above the bottom of excavated trench. At seismic fault locations, in addition to the above requirements of padding material, in case the dugout soil is clayey in nature ( undrained sheer strength 0.5 T/m2), the local soil shall be replaced by engineered (cohesion less) backfill having angle of fricti on not more than 27 degrees and the same shall be loosely compacted (unit weight 1.8 T/m3). In case of undrained sheer strength of the dugout soil = 0.5 T/m2 the dugout soil itself can be used as backfill. The trench shall be deeper by at least 500 mm. The tren ch shall be evenly and sufficiently padded to keep the pipe, when in place, at least 500 mm above the bottom of excavated trench. Ac ceptable padding shall be placed under the pipeline before its installation and around it after installation, to establish at both s ides and on top of the pipe a permanent layer of padding. The thickness of compacted padding shall be at least 500 mm. Supports shall be provided for the pipeline by use of sand/soft soil bags or intermittent transverse berms in the ditch bottom compr ising gravel/rock-free material, with a width of 15-20 cm and at an interval of approximately 7 meters. Note: (i) Item to be operated under specific instructions from Engineer-in-Charge. (ii) Cost of additional depth of 500mm & width of 200/300 mm trenching for this item shall be included in this item itself."

-

-

-

... More
12.75"

10

-

17446.06

... More
"Supplying, providing and filling fine sand in trenches in stretches other than normal soil and hard rock / boulder stretch (includi ng additional 150mm deep trenching) around mainline pipe for providing a minimum padding thickness of 150 mm on top as well as at bo ttom of the mainline pipe for the complete specified trench width NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be included in this item itself"

-

-

-

... More
12.75"

10

-

8847.64

... More
"Supplying, providing and filling soft soil in trenches in stretches other than normal soil and hard rock (including additional 150m m deep trenching) around mainline pipe for providing a minimum padding thickness of 150mm on top as well as at bottom of the mainlin e pipe. Padding materials shall be sand/graded soil/other suitable material containing no gravel, rock, or lumps of hard soil. The graded so il for padding shall pass through sieve size ASTM-10 or ISO-2.00. Acceptable padding shall be placed under the pipeline before its i nstallation and around it after installation, to establish at both sides and on top of the pipe a permanent layer of padding. The th ickness of compacted padding shall be at least 150mm. The trench shall be deeper by at least 150mm. The trench shall be evenly and sufficiently padded to keep the pipe, when in place, at least 150mm above the bottom of excavated trench. NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be included in this item itself."

-

-

-

... More
12.75"

10

-

5358.38

... More
"Supplying & providing approved type of extruded polyethylene mesh (rock shield) on mainline pipe to protect the coating against roc ky soil including supply of all inputs such as labour, materials, consumables etc. necessary to perform and complete the work in all respects in accordance with the specifications, manufacturer's recommendation and instructions of Site Engineer / Engineer-in-Charg e. NOTE: 1. Proper lateral as well as transvers overlap shall be provided as per specifications/ manufacturers recommendation"

-

-

-

... More
12.75"

100

-

52337.72

... More
Supply of all materials necessary for fabrication and installation of kilometre posts, direction markers and warning signs at the lo cations as per specifications, excavating & grouting in cement concrete 1:3:6, and all other works necessary for fabrication & insta llation of the markers including cleaning, priming & applying two coats of coal tar based epoxy paint on underground portions, suppl y and application of one coat of primer and two coats of epoxy paint of approved colour and quality on overground portion, stencil l etter cutting for number, direction, chainage etc. and restoration of site to original condition and all other acts, deeds, matters and things and work, labour, inputs and materials/ consumables necessary to perform and complete the work in all respects as per app roved drawing & specifications and as per direction of Site Engineer / Engineer-in-Charge.

-

-

-

... More
KILOMETER POST

10

-

95953.47

... More
DIRECTION MARKER

40

-

372847.9

... More
WARNING SIGN

40

-

442133.73

... More
Providing and installing RCC (1:1.5:3) boundary pillars as per drawings on both edges of the ROW at 250 metres interval and at every turning point and/or as directed, including supply of all materials necessary for the fabrication of the pillars, casting and inscr ibing the pillars, excavation of earth, fixing the pillars & backfilling, applying two coats of oil paint over one coat of cement ba sed primer on exposed surface and work, labour, inputs & materials/ consumables necessary to perform and complete the work in all re spect under the contract and as per directions of Site Engineer.

180

-

374590.76

... More
Carrying out air drying of the pipeline system as per specification and direction of Engineer-in-Charge including supply of all labo ur, materials, equipments, instruments, pigs, barrels etc. complete in all respects.

-

-

-

... More
12.75"

10

-

417958.71

... More
Carrying out Nitrogen Purging of the pipeline system as per specification and direction of Engineer-in-Charge including supply of al l labour, materials, equipments, instruments, pigs, barrels etc. complete in all respects.

-

-

-

... More
12.75"

10

-

329855.9

... More
Mobilisation/ demobilisation of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, electronic geometry pig, pig tracking device, preparation and cleaning of the complete mainline / Mainline sections in cluding HDD sections under this tender (but excluding HDD crossings not included under the scope of this tender and to be executed b y separate agency) by running series of pigs for cleaning the line from debris, water & making it dry for launching calliper pigs, r unning of magnetic pig for cleaning of ferrous residue, launching and receiving the electronic & standard calliper pigs, including p ig tracking at 5 to 10 km interval, data retrieval, interpretation of data and submission of reports in the form acceptable to the O wner, including rectification of defects observed from calliper survey, including supply of all labour, materials, equipment & instr uments, calliper pigs, fabrication of launching & receiving barrels, all complete for ascertaining the geometry of the pipeline.

-

-

-

... More
12.75"

10

-

366741.88

... More
Preservation of entire pipeline / pipeline sections (including HDD sections) by using inhibited water with uniform inhibitor concent ration adequate for 6 (six) months preservation period as per manufacturer's recommendation including arranging water, testing of wa ter, supply of inhibitor, all equipment, manpower, consumables etc. complete as per specifications and direction of Site Engineer / Engineer-in-Charge.

-

-

-

... More
12.75"

0.1

-

1415.63

... More
Taking delivery and transportation of bare pipes from owner's stockpile, transportation, unloading the pipes at manufacturer's work s and fabrication of Long Radius (R=6D) Hot pulled induction bends having tangent length of approximately 1000m at both ends as per specification and delivery of hot pulled bends to site including visual examination, manual U.T. on the entire weld seam, bevelling of ends as per API 5L, supply of all materials, consumables, labour etc. as per specifications and direction of Site Engineer / Engi neer-in-Charge.

-

-

-

... More
12.75"

10

-

1972530.83

... More
"Supply of all materials, consumables, providing all equipment & resources for the complete activity of commissioning of Liquid Petr oleum Gas Pipeline (LPG) including Mainline and Stations with proper pressurization of mainline and station piping with Nitrogen, ba tch pigging followed by vaporized LPG and effective line fill by pressurization of line fill LPG as per approved procedure and Speci fication requirement including providing expert services for vetting of commissioning procedure and presence of expert to guide & m onitor the complete commissioning activities, providing all supervisory/expert services, other manpower and all resources for the ex ecution of the complete service meeting with international practices and standards, observing all statutory and other governing rule s & standards in all respect and as per the approved scheme and guidance/direction of Engineer - in - Charge. i) The offer shall be inclusive of supply of nitrogen, pig train, all consumables, taxes, duties as applicable and excluding GST. ii) IOCL's responsibility shall be limited to arrangement of a) Fire tender b) Ambulance c) Water supply d) Providing LPG in tanker truck and subsequently lining up of the pipeline system for LPG line fill."

-

-

-

... More
12.75"

10

-

147917.96

... More
Providing & making bank protection works using Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Ga bion Boxes as per IS-16014:2012, MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of +/- 2%), Zinc+10% Al alloy+PVC coated, Mesh wire diameter 2.7/3.7mm (ID/OD), mechanically edged/selvedged with partitions at every 1m interval and sha ll have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD ), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, including providing wooden/ steel pegs as required for supporting the protection, specifications and directions of the Site engineer/ Engineer-in-Charg e.

260

-

1487154.71

... More
#Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other re sources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordanc e with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretatio n of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, S H, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required f or collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparatio n of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detail ed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, inc luding arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Compl ete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repai ring damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive te sting of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's repres entative(s) for examining radiographs, repair of defects in the.........Continued

-

-

-

... More
"....in Continuation of previous.......welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approv ed make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sle eves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M /s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wher ever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-in stallation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-ins tallation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating surve y as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Tran sportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD inst allation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases."

-

-

-

... More
101 - 300 METERS (with OFC conduit)- Non ITC Portion Note: Payment for OFC conduit to be paid separately under ITC head

-

-

-

... More
12.75" in Normal Soil

1

-

14491.12

... More
12.75" in Rocky Soil

1

-

33609.98

... More
Mainline Laying-Tamil Nadu-Non ITC

-

-

-

... More
Laying of Owner-supplied pre-coated mild steel line pipes, including arranging all additional land/construction corridor, beyond Owner's ROU/ROW, required for Contractor's storage, fabrication, access for construction site, movement of construction equipment etc., receiving and taking over Owner-supplied materials, handling, transportation etc. from Owner's issue point to work site, stringing along Right of Way (ROW)/ pipeline corridor, providing labour, equipment and supply of other inputs & materials/ consumables necessary to perform and complete the work in all respects in accordance with the contract including, but not limited to, the following works:- - Taking delivery of pre-coated/ bare pipes from the designated stockpile location (loading of pipes onto pipe trailors placed inside stockpile by mainline contractor shall be done by Owner's authorized agency), including placing of pipe trailors for taking delivery of pipes from designated stockpile, carrying out holiday detection and verification of pipes at the time of taking delivery), transportation of pipes to ROW/ work site/ Contractor's storage location etc., - Clearing and grading of ROW/ pipeline corridor, cutting of trees, vegetation etc. including keeping record of trees cut, including de-watering etc., - Stringing of pipes along ROW including providing straw bags/ soft padding below pipe (in Rocky areas requiring blasting for preparation of trench, pipes shall be strung after the blasting operation and clearing of trench as per instructions of Site Engineer/ Engineer-in-Charge), - Trenching to all depths to maintain clear earth cover as per specification and to fit minimum bend radius, by excavation in all kinds of terrain & soil, including stripping top soil to a depth of 30cm to the full anticipated width of the ditch and storing this material separately along the ROW to allow re-depositing of the same on top of the backfilled ditch (in cultivable and other areas specially designated by Owner), - Carrying out repair of pipe & coating defects for defects occurring after "taking over" of pipes from Owner, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation & handling, - Aligning, bending, lining up, cutting and beveling (as required) of pipes for field adjustments, welding (manual / semi-automatic / automatic), physical inspection of all weld joints by qualified welding engineer/ inspector & carrying out repair of weld-joints found defective, -Carrying out 100% radiographic inspection (by X-Ray) of all field weld joints, destructive testing of one weld joint in each Spread as per specification and direction of Site Engineer, including providing Crawler type Automatic X-Ray machine and external X-Ray machine and all other requisite equipment, labour, supervision, materials, approved films, approved consumables, all facilities and personnel to process, develop, examine and interpret radiographs (by qualified and experienced Radiography Inspector), providing all facilities to Owner's representative(s) for examining radiographs and other tests as required, carrying out repair of weld-joints found defective, carrying out re-radiography and other tests as required on repaired joints, etc., -Carrying out coating of all field weld joints, by qualified coating insulators, including supply of approved joint coating materials, providing all equipment, materials and consumables necessary to carry out the job as per manufacturer's recommendation, -Installation of hot-pulled bends at required locations in mainline (bends to be fabricated from Owner-supplied bare pipes) including cutting, beveling, fitment, coating the bare bend pipe with approved heat shrink sleeve coating, -Carrying out holiday detection, at specified voltage level corresponding to coating type and as per specifications, and repair of coating, if any, -Laying pipeline by open-cut method at crossings viz., cart-track, metalled/ un-metalled roads, minor water courses (MWC) etc.,(except crossings identified as "Cased", "Submerged", "Shallow HDD" & "HDD" crossings and “Marshy areas”) and restoration of the site to original condition including performance of additional works for strengthening of banks of water courses etc., -Lowering the pipeline in trench, tieing-in, backfilling with excavated earth and/or other suitable soil (top soil stored separately during trenching shall be backfilled on top of the ditch) as directed by Site-Engineer, -Carrying out air cleaning, gauge pigging and hydrostatic testing (to specified pressure) of the complete pipeline (excluding those HDD crossing sections not under the scope of this tender) including providing 'pre-testing' of designated sections as approved by Engineer-in-Charge, providing all equipment, pumps, fittings, instruments, dead weight tester etc. and services, supervision, labour, consumables, testing of water, supply & injection of corrosion inhibitor, locating leaks, if any, and rectification of defects attributable to Contractor, re-testing after rectification etc. and cleaning the pipeline section after successful hydrotesting, -All tie-ins, including tieing-in with HDD sections under this tender and also with HDD sections not covered under this tender (tie-ins with HDD sections not under this tender shall be paid separately as per relevant item of SOR), -Obtaining work permits/ NOC from various authorities having jurisdiction before execution of work and complying with all stipulations/ conditions/ recommendation of the said authorities -Supply and installation of 1.0 mm thickness & width (D+300) warning mat over entire pipeline as per relevant specification -Final clean-up and restoration of ROW/ construction corridor, field bunds etc., obtaining NOC from statutory authorities (as required) and obtaining NOC from respective land owners in respect of final restoration of their land etc, disposal of debris and returning surplus material to designated disposal areas/ storage location, as directed by Engineer-in-Charge, restoration of land, facilities and boundary wall etc. for facilities dismantled/ damaged by Contractor during construction, '- Preparation of as-built drawings, pipe book and other records as per specifications etc., - Supply of all materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for performance of work or for temporary or permanent incorporation in the works, and - All other acts, deeds, matters and things necessary to make the pipeline ready for commissioning and completing the works in all respects as per drawings, specifications and instructions of Site Engineer/ Engineer-in-Charge. NOTE: I) The rate quoted against this item shall include cost of excavation and backfilling of trench of standard width (as per approved drawings) in all kinds of soil for laying Mainline pipe. II)The Mainline work includes and covers the work in all types of crossings viz., roads, drains, minor water courses (MWC), low lying areas, ponds, plant area, underground utilities, pedestrian crossings, etc. except those crossings identified as "Cased", "Submerged" & "HDD" crossings for which relevant item of SOR shall be applicable. III) Concrete coating, if necessary, for laying pipelines across ponds, low lying areas etc. shall be paid separately as per relevant item of SOR. IV) Cost of all materials required in repair and/ or rectification of defective work caused due to reasons not attributable to any act or omission of the Owner shall be chargeable to Contractor account. The Owner will supply the additional materials from its designated store/ godown (insofar as constitutes Owner-supplied materials) required for the repair/ rectification work on chargeable basis. The cost of such material shall be as determined by the Engineer-in-Charge plus an additional charge of 15% of the cost of material shall also be levied. The decision of the Engineer-in-Charge, as to the cost of the material, shall be final and binding on the Contractor. V) In the course of hydrostatic testing of the mainline section, if any defective portion/ pipe/ work is found to be due to a defect in the pipe attributable to the Owner, the Owner shall supply the additional necessary pipes at Owner issue point required for the work free of cost to the Contractor, but the Contractor shall supply all other materials and inputs at his own cost for replacement of pipe section. The Contractor shall be paid a lump sum amount for each such failure (refer relevant clause of Special Conditions of Contract of the tender documents) for the work involved in locating & identifying the defects in the mainline and in their repair/rectification as per the specification. Failure in one or more pipes in a section during a single pressurization cycle shall be considered as a single failure for the purpose of compensation for hydrostatic test failure on account of manufacturing defect. VI) Installation of the hot-pulled bends in Mainline, including cutting beveling of pipes, fitment etc., shall be inclusive in the Mainline rate. Payment for fabrication of hot-pulled induction bends, as per specifications, shall be done separately as per relevant item of SOR. The hot-pulled bends shall be coated at site with heat shrink sleeve coating. The cost of the same shall be deemed to be included in this item for Mainline laying.

-

-

-

... More
8.625" OD

60370

-

167762905.37

... More
12.75" OD

43900

-

179982422.86

... More
"Laying cased crossings, by auger boring & jacking method, using casing pipes and 3LPE coated carrier pipes, according to drawings, specification(s) and providing all works, labour, inputs and materials/ consumables necessary to perform and complete the works in a ll respect in accordance with the contract, including collecting the pipes and other Owner-supplied materials from Owner#s issue poi nt and loading, transporting them to site, setting out the works, aligning and welding the casing and carrier pipes, 100% radiograp hy of weld joints of carrier pipes, field joint coating, holiday detection & repair of coating, applying atleast 2(two) coats of bit umastic paint over coat of suitable primer over casing pipe and two component epoxy coating for internal surface of casing pipe, exc avating/ trenching and/or boring in all kinds of soil, including rocky strata if any, inserting the casing pipe into the bore, pre-h ydrostatic testing of the carrier pipe and replacement / rectification of defects / pipes, installation of approved type of insulato rs throughout the cased section on the carrier pipe, carefully inserting the carrier pipe inside casing pipe by jacking/ pushing met hod, taking care not to damage the insulators, sealing the ends of the casing pipe with approved heat shrinkable wraparound type end seal, fixing of vent pipes at the ends of the casing pipe, priming and applying two coats of coal-tar based epoxy paint on under ground portion of vent pipes, measuring final resistance between carrier pipe and casing, and doing preparation work necessary to pr oduce correct resistance, applying one coat of primer and two coats of epoxy paint to all exposed and overground fittings & piping, proper compaction of backfill below carrier pipe at either ends, independently supporting the carrier pipe outside each end of the c asing pipe by suitable RCC supports with neoprene rubber sheet below the carrier pipe, and strengthening with sand bags and proper c ompaction of earth below pipe, to prevent differential settlement of carrier pipe and damage to insulators, final clean-up and resto ration of the site and disposal of wastes and surplus in accordance with the contract and supply of all materials (other than those specifically undertaken to be supplied by the Owner under contract) necessary for or in the performance of the work or for temporar y or permanent incorporation in the works, and all other acts, matters and things necessary to make the pipeline ready for commissio ning in all respect, as per directions of Site Engineer/ Engineer-in-Charge. NOTE: 1. The work of cased crossing will include the provision of temporary supports for existing installations in the road and/or railroa ds, the provision of diversions, the restoration of the railroad/embankment to its original state, maintenance for subsidence and a ll other precaution(s), work(s) and/or maintenance expressed or implied in the contract. 2. The work will also include providing necessary independent support to carrier pipe outside each end of casing pipe by suitable RC C supports, proper compaction of backfill below carrier pipe at either ends and strengthening with sand bags and/ or other suitable means so as to prevent differential settlement of the casing pipe and damage to insulators, including all labour, materials etc. as per direction of Site Engineer/ Engineer-in-Charge. 3. All materials (other than the Owner-supplied materials) required for performance of the work shall be sup"

-

-

-

... More
8.625" OD

5

-

84800.46

... More
12.75" OD

5

-

125362.67

... More
"Laying cased crossings, by auger boring & jacking method / Horizontal Directional Drilling (HDD) method using casing pipes and 3LPE coated carrier pipes according to drawings/ specification(s) and providing all works, labour, inputs and materials/ consumables nec essary to perform and complete the works in all respect in accordance with the contract, taking delivery and transportation of Owner -supplied 3LPE coated pipes and bare casing pipes to the work site from designated stockpile location, inspection of the coated pipe s visually and/or with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pip es are installed in permanent position, setting out the works, aligning and welding the casing and carrier pipes, 100% radiography of weld joints of carrier pipes, field joint coating, holiday detection & repair of coating, applying a layer of Poly-Urethane Coati ng of min. thickness 1000 microns over a coat of suitable primer to external surface of casing pipe,and two component epoxy coating of min. thickness 600 microns for internal surface of casing pipe, excavating/ trenching and / or drilling/ boring in all kinds of s oil including rocky strata, inserting the casing pipe into the bore, pre-hydrostatic testing of the carrier pipe and replacement / r ectification of defects / pipes, installation of HDPE insulators on the carrier pipe, carefully inserting the carrier pipe inside ca sing pipe by jacking/ pushing method taking care not to damage the insulator and coated carrier pipe, sealing the ends of the casing pipe, as per procedure given in specifications, with heat shrinkable wraparound type end seal of approved make, fixing of vent pipe s at the ends of the casing pipe, priming and applying two coats of coal tar based epoxy paint on underground portion of vent pipe s, measuring final resistance between carrier pipe and casing, and doing preparation work necessary to produce correct resistance, a pplying one coat of primer and two coats of epoxy paint to all exposed and overground fittings & piping, proper compaction of backfi ll below carrier pipe at either ends, independently supporting the carrier pipe outside each end of the casing pipe by suitable RCC supports on firm base with neoprene rubber sheet below carrier pipe and strengthening with sand bags and proper compaction of earth below pipe, to prevent settlement of carrier pipe and damage to insulators, final clean-up and restoration of the site and disposal of wastes and surplus in accordance with the contract and supply of all materials (other than those specifically undertaken to be s upplied by the Owner under contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works, and all other acts, matters and things necessary to make the pipeline ready for commissioning in all respects. NOTE: 1. The work of cased crossing will include the provision of temporary supports for existing installations in the road and/or railroa ds, the provision of diversions, the restoration of the railroad/ embankment to its original state, maintenance for subsidence and all other precaution(s), work(s) and/or maintenance expressed or implied in the contract. ... continuation in the next line"

-

-

-

... More
8.625" OD

5

-

73585.15

... More
12.75" OD

5

-

108726.56

... More
"Laying submerged crossings using pipes with or without concrete sheathing across major water course crossings and providing all wor ks,labour, inputs and materials/consumable necessary to perform and complete the work in all respects in accordance with the contrac t, including taking delivery and transportation of Owner-supplied coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area req uired thereof till the pipes are installed in permanent position, arranging the required additional land for construction purpose, p reparation of site, aligning, bending, lining up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair of coating, hydrotesting (both pre- & post-installation) and replacement of pipes/ defect s, excavation of the trench to required depth, as per specifications, in all kinds of soil and conditions including rock trenching a nd maintenance of trench in all kinds of soil including rocky strata, if any, making bunds for stoppage of water flow, de-watering i ncluding installation of well-point system, and laying of the pipeline in approved trench, including de-watering, providing in-situ concreting at coated weld joints to effectively secure the HDPE conduit with mainline pipe, providing ""Band IT"" make stainless ste el (SS) strips / clamps of 3/4"" width for tying HDPE conduit with mainline pipe (two strips per pipe length), backfilling and final clean-up, stabilisation of the excavated banks by additional means, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for or i n the performance of the work or for temporary or permanent incorporation in the works and all other acts, matters and things nec essary to complete the pipeline/ crossings in all respects according to the contract and as per directions of Site Engineer/ Enginee r-in-Charge. NOTE : I)Depending upon the site condition & location of each submerged crossing, the Engineer-in-Charge, in consultation with the Contract or, shall decide upon the precise operations necessary for the performance of the work to lay the pipeline across the canal/ drain/ rivers and the cost of all such operations necessary shall be deemed to have been included in the rate for this item. II)Profile of drain / canal bed, ground & top of laid pipe shall be established jointly in presence of Owner both before and after l aying the crossing, by taking levels with reference to nearby permanent structure. III)The banks of the crossing shall be stabilised and suitable brick/ stone masonry bank protection works shall be carried out for t he entire ROW width to prevent bank erosion leading to exposure of the pipeline. The procedure for such measures shall be submitted for Owner's approval prior to execution. IV)Concrete sheathing work for submerged crossings shall be paid for separately under relevant item of Schedule of Rates."

-

-

-

... More
8.625" OD

5

-

64675.15

... More
12.75" OD

10

-

191159.41

... More
"Laying pre-coated pipes in Marshy areas with concrete sheathing including providing all equipment, works,labour, inputs and materia ls/consumable necessary to perform and complete the work in all respects, submission of construction procedure for Owner's approval, arranging the required additional land for construction purpose, preparation of site including dewatering, aligning, bending, linin g up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair o f coating, hydrotesting testing and replacement of pipes/ defects, excavation of the trench to required depth in all kinds of soil a nd conditions including rock trenching and maintenance of trench in all kinds of soil including rocky strata, if any, and laying of the pipeline in approved trench, backfilling and final clean-up, stabilisation of the excavated banks, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner unde r the contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works and all o ther acts, matters and things necessary to complete the work in all respects according to the contract. NOTE: 1. Depending upon the site condition, the Engineer-in-Charge, in consultation with the Contractor, shall decide upon the precise op erations necessary for the performance of the work to lay the pipeline across the canal/drain/rivers and the cost of all such operat ions necessary shall be deemed to have been included in the rate for this item. 2. Concrete sheathing work for marshy area laying shall be paid for separately under relevant item of Schedule of Rates. 3. Measurement for this item shall be as per pipe book covering laying in Marshy portion covering laying in Marshy portion covering entire concrete sheathing work only."

-

-

-

... More
8.625" OD

5

-

46792.9

... More
12.75" OD

5

-

69161.28

... More
"Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique including mobilization & de-mobilizatio n at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and ar ranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the spe cifications, drawings and as per all provisions of the contract document complete in all respect as per the instructions of the Engi neer – in – charge /Site engineer. Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspecti on of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage are a required thereof till the pipes are installed in permanent position. Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating includi ng defects/ damages occurring during transportation and handling. String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radio graphy (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiograp hs, repair of defects in the welds and re-testing etc. Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of de fects and retesting etc. Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut s ections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut s ections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the car rier pipeline). Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with th e carrier pipeline). ... continuation in next line"

-

-

-

... More
"... in continuation to the previous line Installation of the pipeline and OFC conduit as a bundle crossing below the Road/ other utility horizontally by shallow HDD operatio n to the correct profile as per the approved drawings in a pre-reamed hole of appropriate. Carrying out post-installation coating survey as per approved procedure. Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, c alculations and construction method statement, leading to successful completion of the works. Note :- The item to be operated under the specific instruction of Engineer in Charge"

-

-

-

... More
8.625"

890

-

9393849.96

... More
12.75"

650

-

10141166.62

... More
"Providing & Laying Concrete sheathing on the carrier pipe i.e., continuous concrete coating (mix 1:1.5:3) using specified (approved ) wire mesh reinforcement as per approved drawing and technical specifications, including supply of cement, steel wire mesh, aggrega te, sand, shuttering and all other materials, consumables, inputs, equipment for concrete sheathing required to complete the job, te sting of concrete coated pipes etc. and as per direction of Engineer-in-Charge. NOTE: I) Payment shall be made for the actual length of pipe coated with concrete. Ends of pipe left uncoated/ shall not be considered in the concrete coating length II) The rates shall include compensation for additional hardship caused in handling and/ or lowering the pipe with concrete coating. The above item shall be executed at the discretion and directions of Engineer-in-Charge. III) The rates shall include the concrete sheathing / coating over weld joints in order to arrive at continuously concrete coated pi peline. This weld joint concrete sheathing / coating shall be applied after the hydrostatic pre-test."

-

-

-

... More
8.625"

2

-

6305.52

... More
12.75"

2

-

9321.2

... More
"Extra for rock trenching for Mainline laying (covered under relevant item of this SOR) as classified by the Engineer-in-Charge and performed by pneumatic tools or by drilling and blasting or by chiselling out including cost of all equipment, materials, labour, co nsumables & inputs to complete the work (excluding sand padding around mainline pipe which shall be paid separately) as per specific ations, approved procedure and instructions of Engineer-in-Charge. Note: 1.Payment shall be made for rock actually excavated at site or calculated based on the trench dimensions stipulated in the specifica tions / drawings, whichever is less. 2.Item shall be operated under specific instructions from Engineer-in-Charge. 3.Controlled Blasting operation shall be carried out only by authorized and trained / skilled manpower, as per approved procedure, a nd taking due care & precaution to adjoining property, people, livestock etc., with due approval from Engineer-in-Charge 4.Sand padding around mainline pipe shall be paid separately as per relevant item in SOR 5. Additional 150 mm depth of excavation to be carried out in rocky area (for pipe trench) to accommodate sand padding"

6097

-

6989921.5

... More
"Supplying, providing and filling fine sand in trenches in hard rocky stretches (Excluding additional 150mm deep trenching for rock trenching) around mainline pipe for providing a minimum padding thickness of 150 mm on top as well as at bottom of the mainline pip e. NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be paid separetly under item for ""Extra for Rock trenching"""

-

-

-

... More
8.625"

5761

-

3733110.72

... More
12.75"

12430

-

11772055.24

... More
"Supplying, providing and filling Soft Soil in trenches in hard rocky stretches (excluding additional 150mm deep rock trenching) aro und mainline pipe for providing a minimum padding thickness of 150mm on top as well as at bottom of the mainline pipe. In all cases where rock or gravel or moorum or hard soil is encountered in the bottom of the trench, trench padding, Rock Shield Mat erials and sand/soft soil bags as approved by OWNER/Engineer-in-Charge, shall be provided to safeguard the pipe coating. Padding mat erials shall be graded soil/other suitable material containing no gravel, rock, or lumps of hard soil. The graded soil for padding s hall pass through sieve size ASTM-10 or ISO-2.00. Acceptable padding shall be placed under the pipeline before its installation and around it after installation, to establish at both sides and on top of the pipe a permanent layer of padding. The thickness of compa cted padding shall be at least 150mm. The trench shall be deeper by at least 150mm. The trench shall be evenly and sufficiently padded to keep the pipe, when in place, at least 150mm above the bottom of excavated trench. NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be paid separetly under item for ""Extra for Rock trenching"""

-

-

-

... More
8.625"

5

-

2180.76

... More
12.75"

5

-

3177.68

... More
"Supplying, providing and filling fine sand in trenches at Seismic Fault location crossing or running parallel to pipeline (includin g additional 500 mm deep & 200/300 mm wide trenching) around mainline pipe for providing a minimum padding thickness of 500 mm on to p as well as at bottom of the mainline pipe(for the complete trench width). Note: (i) Item to be operated under specific instructions from Engineer-in-Charge. (ii) Cost of additional depth of 500mm & width of 200/300 mm trenching for this item shall be included in this item itself."

-

-

-

... More
12.75"

1000

-

2791372.6

... More
"Supplying, providing and filling soft soil in trenches at Seismic Fault location crossing or running parallel to pipeline (includin g additional 500 mm deep & 200/300 mm wide trenching) around mainline pipe for providing a minimum padding thickness of 500 mm on to p as well as at bottom of the mainline pipe(for the complete trench width). Padding materials shall be sand/graded soil/other suitable material containing no gravel, rock, or lumps of hard soil. The graded so il for padding shall pass through sieve size ASTM-10 or ISO-2.00. Acceptable padding shall be placed under the pipeline before its i nstallation and around it after installation, to establish at both sides and on top of the pipe a permanent layer of padding. The th ickness of compacted padding shall be at least 150mm. The trench shall be deeper by at least 150mm. The trench shall be evenly and sufficiently padded to keep the pipe, when in place, at least 150mm above the bottom of excavated trench. At seismic fault locations, in addition to the above requirements of padding material, in case the dugout soil is clayey in nature ( undrained sheer strength 0.5 T/m2), the local soil shall be replaced by engineered (cohesion less) backfill having angle of fricti on not more than 27 degrees and the same shall be loosely compacted (unit weight 1.8 T/m3). In case of undrained sheer strength of the dugout soil = 0.5 T/m2 the dugout soil itself can be used as backfill. The trench shall be deeper by at least 500 mm. The tren ch shall be evenly and sufficiently padded to keep the pipe, when in place, at least 500 mm above the bottom of excavated trench. Ac ceptable padding shall be placed under the pipeline before its installation and around it after installation, to establish at both s ides and on top of the pipe a permanent layer of padding. The thickness of compacted padding shall be at least 500 mm. Supports shall be provided for the pipeline by use of sand/soft soil bags or intermittent transverse berms in the ditch bottom compr ising gravel/rock-free material, with a width of 15-20 cm and at an interval of approximately 7 meters. Note: (i) Item to be operated under specific instructions from Engineer-in-Charge. (ii) Cost of additional depth of 500mm & width of 200/300 mm trenching for this item shall be included in this item itself."

-

-

-

... More
12.75"

5

-

8723.03

... More
"Supplying, providing and filling fine sand in trenches in stretches other than normal soil and hard rock / boulder stretch (includi ng additional 150mm deep trenching) around mainline pipe for providing a minimum padding thickness of 150 mm on top as well as at bo ttom of the mainline pipe for the complete specified trench width NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be included in this item itself"

-

-

-

... More
8.625"

5

-

2990.71

... More
12.75"

5

-

4423.82

... More
"Supplying, providing and filling soft soil in trenches in stretches other than normal soil and hard rock (including additional 150m m deep trenching) around mainline pipe for providing a minimum padding thickness of 150mm on top as well as at bottom of the mainlin e pipe. Padding materials shall be sand/graded soil/other suitable material containing no gravel, rock, or lumps of hard soil. The graded so il for padding shall pass through sieve size ASTM-10 or ISO-2.00. Acceptable padding shall be placed under the pipeline before its i nstallation and around it after installation, to establish at both sides and on top of the pipe a permanent layer of padding. The th ickness of compacted padding shall be at least 150mm. The trench shall be deeper by at least 150mm. The trench shall be evenly and sufficiently padded to keep the pipe, when in place, at least 150mm above the bottom of excavated trench. NOTE: (i) Item to be operated under specific instructions from Engineer-in-Charge (ii) Cost of additional depth of 150mm trenching for this item shall be included in this item itself."

-

-

-

... More
8.625"

5

-

1806.88

... More
12.75"

5

-

2679.19

... More
"Supplying & providing approved type of extruded polyethylene mesh (rock shield) on mainline pipe to protect the coating against roc ky soil including supply of all inputs such as labour, materials, consumables etc. necessary to perform and complete the work in all respects in accordance with the specifications, manufacturer's recommendation and instructions of Site Engineer / Engineer-in-Charg e. NOTE: 1. Proper lateral as well as transvers overlap shall be provided as per specifications/ manufacturers recommendation"

-

-

-

... More
8.625"

5761

-

2010094.71

... More
12.75"

12430

-

6505578.6

... More
Supply of all materials necessary for fabrication and installation of kilometre posts, direction markers and warning signs at the lo cations as per specifications, excavating & grouting in cement concrete 1:3:6, and all other works necessary for fabrication & insta llation of the markers including cleaning, priming & applying two coats of coal tar based epoxy paint on underground portions, suppl y and application of one coat of primer and two coats of epoxy paint of approved colour and quality on overground portion, stencil l etter cutting for number, direction, chainage etc. and restoration of site to original condition and all other acts, deeds, matters and things and work, labour, inputs and materials/ consumables necessary to perform and complete the work in all respects as per app roved drawing & specifications and as per direction of Site Engineer / Engineer-in-Charge.

-

-

-

... More
KILOMETER POST

113

-

1084274.21

... More
DIRECTION MARKER

452

-

4213181.32

... More
WARNING SIGN

452

-

4996111.13

... More
Providing and installing RCC (1:1.5:3) boundary pillars as per drawings on both edges of the ROW at 250 metres interval and at every turning point and/or as directed, including supply of all materials necessary for the fabrication of the pillars, casting and inscr ibing the pillars, excavation of earth, fixing the pillars & backfilling, applying two coats of oil paint over one coat of cement ba sed primer on exposed surface and work, labour, inputs & materials/ consumables necessary to perform and complete the work in all re spect under the contract and as per directions of Site Engineer.

1054

-

2193437.03

... More
Carrying out air drying of the pipeline system as per specification and direction of Engineer-in-Charge including supply of all labo ur, materials, equipments, instruments, pigs, barrels etc. complete in all respects.

-

-

-

... More
8.625"

66

-

1262474.52

... More
12.75"

47

-

1964405.96

... More
Carrying out Nitrogen Purging of the pipeline system as per specification and direction of Engineer-in-Charge including supply of al l labour, materials, equipments, instruments, pigs, barrels etc. complete in all respects.

-

-

-

... More
8.625"

66

-

995997.2

... More
12.75"

47

-

1550322.74

... More
Mobilisation/ demobilisation of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, electronic geometry pig, pig tracking device, preparation and cleaning of the complete mainline / Mainline sections in cluding HDD sections under this tender (but excluding HDD crossings not included under the scope of this tender and to be executed b y separate agency) by running series of pigs for cleaning the line from debris, water & making it dry for launching calliper pigs, r unning of magnetic pig for cleaning of ferrous residue, launching and receiving the electronic & standard calliper pigs, including p ig tracking at 5 to 10 km interval, data retrieval, interpretation of data and submission of reports in the form acceptable to the O wner, including rectification of defects observed from calliper survey, including supply of all labour, materials, equipment & instr uments, calliper pigs, fabrication of launching & receiving barrels, all complete for ascertaining the geometry of the pipeline.

-

-

-

... More
8.625"

66

-

1637515.78

... More
12.75"

47

-

1723686.82

... More
Preservation of entire pipeline / pipeline sections (including HDD sections) by using inhibited water with uniform inhibitor concent ration adequate for 6 (six) months preservation period as per manufacturer's recommendation including arranging water, testing of wa ter, supply of inhibitor, all equipment, manpower, consumables etc. complete as per specifications and direction of Site Engineer / Engineer-in-Charge.

-

-

-

... More
8.625"

0.66

-

6316.48

... More
12.75"

0.5

-

7078.13

... More
Taking delivery of MOVs for mainline from Owner's stockpile/ godown, preparation of pup pieces of specified length from owner suppli ed pipes of higher wall thickness, welding of pup pieces to both sides of valves, providing instrument tappings in MOVs, hydrostatic ally testing the valves & installing at designated locations on the mainline in accordance with the specifications and drawings, wel ding & 100% radiography of weld joints, repair of weld joints etc., complete in all respect including all works and material in foun dation, RCC underground valve supports etc., including PU Coating of underground portions and painting of overground portions / valv e enclosure etc. with aluminium paint over a coat of primer, and including supply of all materials (other than those specifically un dertaken to be supplied by the Owner), consumables & inputs complete as per specifications, drawings & instructions of Site Engineer / Engineer-in-Charge.

-

-

-

... More
8.625"

4

-

372349.61

... More
12.75"

3

-

412837.03

... More
Taking delivery and transportation of bare pipes from owner's stockpile, transportation, unloading the pipes at manufacturer's work s and fabrication of Long Radius (R=6D) Hot pulled induction bends having tangent length of approximately 1000m at both ends as per specification and delivery of hot pulled bends to site including visual examination, manual U.T. on the entire weld seam, bevelling of ends as per API 5L, supply of all materials, consumables, labour etc. as per specifications and direction of Site Engineer / Engi neer-in-Charge.

-

-

-

... More
8.625"

66

-

8806890.8

... More
12.75"

47

-

9270894.92

... More
"Supply of all materials, consumables, providing all equipment & resources for the complete activity of commissioning of Liquid Petr oleum Gas Pipeline (LPG) including Mainline and Stations with proper pressurization of mainline and station piping with Nitrogen, ba tch pigging followed by vaporized LPG and effective line fill by pressurization of line fill LPG as per approved procedure and Speci fication requirement including providing expert services for vetting of commissioning procedure and presence of expert to guide & m onitor the complete commissioning activities, providing all supervisory/expert services, other manpower and all resources for the ex ecution of the complete service meeting with international practices and standards, observing all statutory and other governing rule s & standards in all respect and as per the approved scheme and guidance/direction of Engineer - in - Charge. i) The offer shall be inclusive of supply of nitrogen, pig train, all consumables, taxes, duties as applicable and excluding GST. ii) IOCL's responsibility shall be limited to arrangement of a) Fire tender b) Ambulance c) Water supply d) Providing LPG in tanker truck and subsequently lining up of the pipeline system for LPG line fill."

-

-

-

... More
8.625"

66

-

660434.08

... More
12.75"

47

-

695214.39

... More
Providing & making bank protection works using Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Ga bion Boxes as per IS-16014:2012, MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of +/- 2%), Zinc+10% Al alloy+PVC coated, Mesh wire diameter 2.7/3.7mm (ID/OD), mechanically edged/selvedged with partitions at every 1m interval and sha ll have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD ), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, including providing wooden/ steel pegs as required for supporting the protection, specifications and directions of the Site engineer/ Engineer-in-Charg e.

170

-

972370.39

... More
#Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other re sources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordanc e with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretatio n of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, S H, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required f or collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparatio n of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detail ed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, inc luding arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Compl ete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repai ring damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive te sting of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's repres entative(s) for examining radiographs, repair of defects in the.........Continued

-

-

-

... More
"....in Continuation of previous.......welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approv ed make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sle eves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M /s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wher ever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-in stallation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-ins tallation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating surve y as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Tran sportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD inst allation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases."

-

-

-

... More
UPTO 100 METERS (with OFC conduit)- Non ITC Portion Note: Payment for OFC conduit to be paid separately under ITC head

-

-

-

... More
8.625" in Normal Soil

1

-

5621.17

... More
8.625" in Rocky Soil

1

-

14495.85

... More
12.75" in Normal Soil

1

-

11367.9

... More
12.75" in Rocky Soil

1

-

26863.81

... More
101 - 300 METERS (with OFC conduit)- Non ITC Portion Note: Payment for OFC conduit to be paid separately under ITC head

-

-

-

... More
8.625" in Normal Soil

780

-

6041073.01

... More
8.625" in Rocky Soil

2320

-

44354266.69

... More
12.75" in Normal Soil

480

-

6955737.5

... More
12.75" in Rocky Soil

1440

-

48398364.58

... More
301 - 500 METERS (with OFC conduit)- Non ITC Portion Note: Payment for OFC conduit to be paid separately under ITC head

-

-

-

... More
8.625" in Normal Soil

1

-

9244.11

... More
8.625" in Rocky Soil

1

-

22366.37

... More
12.75" in Normal Soil

130

-

2176179.95

... More
12.75" in Rocky Soil

370

-

14238412.3

... More
#Laying of Owner-supplied pre-coated mild steel line pipes, including arranging all additional land/construction corridor, beyond Ow ner's ROW, required for Contractor's storage, fabrication, access for construction site, movement of construction equipment etc., re ceiving and taking over Owner-supplied materials, handling, transportation etc. from Owner's issue point to work site, stringing alo ng Right of Way (ROW)/ pipeline corridor, providing labour, equipment and supply of other inputs & materials/ consumables necessary to perform and complete the work in all respects in accordance with the contract including, but not limited to, the following works: #Taking delivery and transportation of Owner-supplied coated pipes to the work site from designated Stockpile location, inspection o f the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereo f till the pipes are installed in permanent position;#Clearing and grading of ROW/ pipeline corridor, cutting of trees, vegetation e tc. including keeping record of trees cut, including de-watering etc.;#Stringing of pipes along ROW including providing straw bags/ soft padding below pipe;#Trenching to all depths to maintain clear earth cover as per specification and to fit minimum bend radius, by excavation in all kinds of terrain & soil, including stripping top soil to a depth of 30cm to the full anticipated width of the d itch and storing this material separately along the ROW to allow re-depositing of the same on top of the backfilled ditch (in cultiv able and other areas specially designated by Owner);#Carrying out repair of pipe & coating defects for defects occurring after "taki ng over" of pipes from Owner, replacement in the case of non-repairable defects and repairing damages to pipe coating including defe cts/ damages occurring during transportation & handling;#Carrying out 100% radiographic inspection (by X-Ray) of all field weld join ts as per Specifications and Special Conditions of Contract (SCC) and destructive testing of one weld joint as per specification and direction of Site Engineer, including providing Crawler type Automatic X-Ray machine and/ or external X-Ray machine and all other r equisite equipment, labour, supervision, materials, approved films, approved consumables, all facilities and personnel to process, d evelop, examine and interpret radiographs (by qualified and experienced Radiography Inspector), providing all facilities to Owner's representative(s) for examining radiographs and other tests as required, carrying out repair of weld-joints found defective, carryin g out re-radiography and other tests as required on repaired joints, etc.;#Carrying out coating of all field weld joints, by specifi ed coating insulators, including supply of approved joint coating materials, providing all equipment, materials and consumables nece ssary to carry out the job as per manufacturer's recommendation;#Carrying out holiday detection at specified voltage level correspon ding .......Continued

-

-

-

... More
".....in Continuation of previous.... to coating type as per specifications, and repair of coating, if any;#Laying pipeline by open- cut method at crossings viz., cart-track, village road, metalled/ un-metalled roads, minor water courses (MWC) and restoration of th e site to original condition;#Lowering the pipeline in trench, tieing-in, backfilling with excavated earth and/or other suitable soi l (top soil stored separately during trenching shall be backfilled on top of the ditch) as directed by Site-Engineer;#Carrying out a ir cleaning, gauge pigging and hydrostatic testing (to specified pressure) of the complete pipeline including providing pre-testing of designated sections as approved by Engineer-in-Charge, providing all equipment, pumps, fittings, instruments, dead weight tester etc. and services, supervision, labour, consumables, testing of water, supply & injection of corrosion inhibitor, locating leaks, if any, and rectification of defects attributable to Contractor, re-testing after rectification etc. and cleaning the pipeline section after successful hydrotesting;#All tie-ins, including tieing-in with HDD section;#Obtaining work permits/ NOC from various authorit ies, having jurisdiction, before execution of work and complying with all stipulations/ conditions/ recommendation of the authoritie s;#Final clean-up and restoration of ROW/ construction corridor, field bunds etc. and obtaining NOC from statutory authorities (as r equired), and obtaining NOC from respective landowners in respect of final restoration of their land etc., disposal of debris and re turning surplus material to designated disposal areas/ storage location, as directed by Engineer-in-Charge, restoration of land, fac ilities and boundary wall etc. for facilities dismantled/ damaged by Contractor during construction;#Preparation of As-Built drawing s, Pipe book and other records as per specifications etc.;#Supply of all materials (other than those specifically undertaken to be s upplied by the Owner under the contract);#All other acts, deeds, matters and things necessary to make the pipeline ready for commiss ioning and completing the works in all respects as per drawings, specifications and instructions of Site Engineer/ Engineer-in-Charg e. Note: Liability of Owner to provide ROW to contractor shall be limited to the extent between the hook-up points with existing pipeli ne including for laying transition pipeline section. Additional space required by contractor beyond the above limits, including for access to site, shall be arranged by contractor at his own cost & initiative. Payment under this item shall be made only for the tra nsition pipe laid more than 12 m length on both sides. Transition Pipe laying upto 12 m length on both sides is included in the SOR item for Tie-In and Hook up."

-

-

-

... More
DIAMETER

-

-

-

... More
8.625"

456

-

1993860.82

... More
12.75"

240

-

1559112.29

... More
CSW Electrical-Supply

-

-

-

... More
SAFETY EQUIPMENT - Supplying the following Safety Equipment as per directions of Site Engineer / Engineer-in-Charge complete in all respects including transportation charges:

-

-

-

... More
RUBBER HAND GLOVES: Rubber hand gloves suitable for 11/6.6 KV operation with ISI mark.

11

-

40199.32

... More
Supply and installation of 11/6.6 KV Discharge Rod

3

-

31616.63

... More
Supply of fully charged CO2 fire extinguishers as per specifications (4.5 kg capacity as per IS: 2878 latest)

28

-

207982.84

... More
Supply of fully charged CO2 fire extinguishers as per specifications (2 kg capacity as per IS: 2878 latest)

14

-

71552.25

... More
INSULATING MATS - Supply & installation of 2000 mm X 1000 mm and of thickness as mentioned below, approved quality insulating Elasto mer mats as per specifications:

-

-

-

... More
Insulating Elastomer mats conforming to IS 15652:2006 of thickness 2 mm (Class A)

48

-

154585.85

... More
Insulating Elastomer mats conforming to IS 15652:2006 of thickness 2.5 mm (Class B)

47

-

150571.13

... More
Supply of ACDB Panel (IP-4X Degree of Protection) with base frame, 200 A Bus Bar having incomers and feeders, suitable for 03 phase DG supply, of approved make, as indicated in technical specifications and cable entries from Top, complete in all respects.

7

-

2639574.93

... More
Supply of the flameproof (Ex'd) and weatherproof (Minimum IP-65) Distribution Boards (with Spares) made up of Cast Alluminium Alloy LM-6 with 125 A, TPN busbar, 01 no. 100 Ampere, 4 Pole MCCB suitable for termination of cable of size up to 3.5Cx50 sqmm, Aluminium Armoured cable. 01 additional spare entry suitable for 3.5CX50sqmm cable size shall be provided, which shall be plugged with flamep roof and weatherproof entry plug. 09 Nos. 32A, 3 Pole/TPN MCBs suitable for termination of 3C x 10 sq.mm., Armoured cable, Breaking capacity of MCB shall be 10 kA for 1 Sec and shall be C-curve application suitable for motor duty. It shall be certified for applica tion in Zone-I, Gas Group IIA & IIB, Temp class T3 and shall be of approved make as mentioned in the technical specifications. The item includes supply of flame proof double compression cable glands of nickel plated brass material for each cable entry 01 no. for cable entry of size up to 3.5C x 50 sq.mm., 02 no for 3.5 C x 25 Sq mm cable, 09 no. for 3Cx10 sqmm, Aluminium armoured cable. Cable dimensions shall be provided at drawings approval stage. Supply shall be as per technical specifications of flameproof DB attached with supply specifications.

15

-

1886378.56

... More
CSW Electrical-Services

-

-

-

... More
Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.5 metres including shoring, strutting etc. (if necessary), backfilling the trench, job complete in all respects, including all labour and materials comple te as per drawings, specification and directions of Site Engineer / Engineer-in-Charge

6425

-

5241849.1

... More
WBM Road/concrete breaking for cable trenches including required shoring strutting etc., and repairing of the road/dyke to origina l condition and disposing off excess materials (within the work site) job complete in all respects including the cost of labou r, tools, materials, load, lift hire charges of equipments, if any, complete as per drawings, specification and directions of Site Engineer / Engineer-in-Charge.

290

-

1550285.77

... More
Cable Laying - Laying of all type of cables LT (PVC / XLPE / Armoured/Unarmoured/Power/ Control/ Signalling) in trenches, in cabl e racks, in trays, in protective pipes, poles, columns, in conduits, in panels and on structures etc.; including the supply and inst allation of all required materials such as fixing clamps, screws, cable straps, tags, etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and panels) complete in all respect, including cost of all la bour, tools, consumable materials, etc. and cutting the cables in required lengths as per drawings, specification and directions o f Site Engineer / Engineer-in-Charge:

-

-

-

... More
Power cables LT : OD upto 20 mm

11760

-

499287.26

... More
Power cables LT : OD above 20 mm and upto 40 mm

9790

-

596786.65

... More
Power cables LT : OD above 40 mm and upto 60 mm

1300

-

126616.36

... More
Power Control cables LT : OD upto 20 mm

2500

-

172014.5

... More
Control cables (T&I) : OD upto 20 mm

28800

-

2699349.12

... More
Control cables (T&I) : OD above 20 mm and upto 30 mm

18500

-

1989149.6

... More
Control cables (T&I) : OD above 30 mm and upto 40 mm

12500

-

1678845

... More
Installation, laying of 2 Pair PVC insulated copper conductor un-armoured telephone cables in 16 mm/ 25 mm/ 32 mm PVC conduits from IDF through ceiling/ wall/trench and post-laying end to end testing of telephone cables. The job includes supply, installation, fix ing of wall mounted telephone socket outlet with 2 port telephone jack face plate (white/ cream colour) including RJ11 I/O with modu lar plate & switch box/ gang box for fixing the face plate & accessories, supply and installation of PVC Conduits, all required mate rials such as fixing clamps, screws, cable straps, tags etc. as required complete in all respects as per specifications & scope of work, drawings and directions of Site Engineer/ Engineer-in-charge including cost of all labour, tools & tackles, materials etc.

1120

-

220191.78

... More
2/3/4/5/6C upto 95 sqmm

11

-

4507.69

... More
LT DG set with PLC based AMF panel, fuel tank etc : Silent LT DG set - Erection, Installation including transportation from owner de sginated location, connecting, testing and commissioning of owner supplied Emergency LT DG set including execution of terminal conne ction of power/control cable. The work shall include grounding of alternator neutral, earthing, providing water pipe connection for Radiator water make-up complete with valve, solenoid valve etc. piping for fuel line, fabrication, welding, erection and painting of owner supplied support structure (including supply of shortfall support structure, if any) for exhaust piping, mounting on channels /AVM pads, installation of PLC based AMF panel, NIG panel, exhaust piping including insulation and cladding, fuel piping etc., mater ials, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-C harge:

8

-

456082.37

... More
415 V AC 3 phase / 230 V AC single phase motors - Connection and testing of 415 V AC 3 phase / 230 V AC single phase motors (includi ng space heaters/thermistors wherever provided) / AC/DC Actuators including execution of terminal connection of control and power ca bles, earthing of the motor/actuator/ connecting the thermistor, installing the controller in LT panel, earthing the motor frame, ar mour etc. as per the drawings, erection manuals, and as per directions of Site Engineer. Job complete in all respects including the cost of supplying and installation of all the required FLP/WP cable glands, reducers, adapeters, end lugs, GI earthing wire / strips , labour, tools, materials, etc., as required in all respects for all types of motors/heaters/thermistors/actuators etc.:

-

-

-

... More
Capacity upto and including 1 KW

50

-

175550.37

... More
Capacity above 1 KW and upto 2.5 KW

10

-

41862.15

... More
LT Panel - Erection, installation including transportation from owner desginated location, testing and commissioning of 415 V, owne r supplied power-control- centres, motor control centres, soft starters, APFC panel etc. assembling as required, installation on the already made foundation channels, aligning, levelling, grouting, assembling, making all the inter connections /outgoing/incoming po wer & control cable/ bus duct connection including making holes for cable entries as required as per drawing, specifications and dir ections of the Site Engineer/Engineer-in-Charge including cost of all materials, tools labour etc. complete in all respect including termination of all power, control cables, installation of thermistor controller, internal wiring, earthing of LT panels, supply of cable glands etc.complete as per cable schedule, drawings etc.:

-

-

-

... More
"Weight of unit above 100 kg but upto and including 500 kg "

300

-

25155.24

... More
"Weight of unit above 500 kg but upto and including 1000 kg "

6750

-

612349.2

... More
"Weight of unit above 1000 kg but upto and including 3000 kg "

2000

-

275671.6

... More
"Weight of unit above 3000 kg but upto and including 6000 kg "

6400

-

955403.52

... More
Installation of corrosion monitoring probes including 2" Flareweld on station piping at desired location and 12 O'Clock position for mounting of ER Probe under the supervision of site engineer. Flareweld assembly shall be supplied by owner. The job complete in all respect with material, tools & tackles, consumables etc.

2

-

39221.45

... More
Erection, installation including within site transportation, testing and commissioning of 415 V , Flameproof distribution boards (F LP-DB) under scope of supply of bidder, assembling as required, installation on the already made foundation channels, aligning, leve lling, grouting, assembling, making all the inter connections /outgoing/incoming power & control cable/ bus duct connection includin g making holes for cable entries as required as per drawing, specifications and directions of the Site Engineer/Engineer-in-Charge i ncluding cost of all materials, tools labour etc. complete in all respect including termination of all power , control cables, insta llation of thermistor controller, internal wiring, earthing of FLP-DB panels, supply of cable glands etc. complete as per cable sche dule, drawings etc.

3900

-

378606.54

... More
CSW Electrical-Composite

-

-

-

... More
Supply, installation & fixing of prefabricated perforated GI cable trays with tray cover of width 150 mm, 300 mm, 450 mm & 600 mm as per site requirement for laying of cables with standard rung spacings. Load for support span of 2.5 meter as 30, 60, 75 & 90 (in Kg /Mtr) respectively with concentric static load as 70 Kg at the centre, with materials, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge.

18150

-

4138406.91

... More
Supplying and spreading of approved quality fine dry river sand in cable trenches including the cost of all material, transport, loa d and lift charges, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge

1230

-

1233312.64

... More
Supply and laying of approved quality 75 mm thick second class brick flat soling with sand filling in the interstices, in cable tren ches for protectionincluding the cost of all brick and sand, labour, load and lift charges , tools and tackles etc , as per drawing s, specification and directions of Site Engineer / Engineer-in-Charge.

3910

-

4041135.14

... More
Supply, erection & installation of MS cable markers, including excavation, installation of the markers, cement concrete grouting, ba ckfilling, materials, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge.

380

-

1096777.43

... More
LT Cable joint (1.1 KV) - Making straight through joints on Al/Cu conductor XLPE/PVC insulated armoured cable including the supply o f required materials such as cable jointing kit (of heat shrinkable sleeve type of Raychem/Mseal/3M) , materials, labour, tools and tackles, consumables etc , as per drawings, specification and directions of Site Engineer / Engineer-in-Charge:

-

-

-

... More
Power cables LT : OD upto 20 mm

34

-

192635.38

... More
Power cables LT : OD above 20 mm and upto 40 mm

21

-

145012.06

... More
Power cables LT : OD above 40 mm and upto 60 mm

4

-

39043.13

... More
Control cables LT : OD upto 20 mm

16

-

116236.42

... More
Supplying, installation, testing of GI earthing electrode, including the supply and installation of the CI cover, charcoal /special backfill etc. and construction of chamber; complete as per drawings,specifications and directions of the Site Engineer, Including the cost of all labour, tools, materials etc. complete in all respects.

112

-

2133425.84

... More
Supply, installation, testing of earthing system consisting of 6 earth pits of perforated GI pipes earthing electrodes and copper pl ate terminal block including construction of chamber using cement concrete with earthing pit cover and frame, supply of charcoal, sa lt etc including supply of interconnecting cables / strips including necessary welding etc complete as per drawings, specifications and directions of the site engineer, including cost of tools, materials etc complete in all respects as per drawing The job shall al so include testing of each earth pit and the entire earthing system on whole. (Note: Earthing for field instruments shall be provide d from Station earth grid covered in Electrical SOR.)

1

-

111357.66

... More
Supply, installation, testing of earthing system consisting of 3 earth pits of perforated GI pipes earthing electrodes and copper pl ate terminal block including construction of chamber using cement concrete with earthing pit cover and frame, supply of charcoal, sa lt etc including supply of interconnecting cables / strips including necessary welding etc complete as per drawings, specifications and directions of the site engineer, including cost of tools, materials etc complete in all respects as per drawing The job shall al so include testing of each earth pit and the entire earthing system on whole. (Note: Earthing for field instruments shall be provide d from Station earth grid covered in Electrical SOR.)

16

-

1238559.15

... More
Supply & Installation of G.I. earthing plate as per standard drawing outside the buildings. The item also includes grouting of the p late as shown in the drawing. The item should be complete in all respect including all materials, tools, tackels etc. and as per dir ection of EIC / Site engineer.

49

-

92062.74

... More
EARTH STRIP / WIRE / ROPE / CABLE - Supply, installing and testing of earthing strip/wire/rope/cable for completely making the eart hing grid system by supplying, laying the GI / Cu strip and making all the necessary welding joints, connecting to the earthing electrodes and existing earthing grid etc., complete as per drawings, specifications and directions of the Site engineer/Engineer -in-charge, including the cost of all labour, tools, materials, etc. complete in all respect:

-

-

-

... More
50 mm X 6 mm G.I. earthing strip

3300

-

1134945.24

... More
40 mm X 5 mm G.I. earthing strip

2600

-

625657.24

... More
25mm x 4 mm copper flat

920

-

859078.7

... More
25mm x 3 mm copper flat

228

-

194397.54

... More
GI wire (8 SWG)

3280

-

253008.05

... More
Copper cable as per specifications - 100 Sq.mm

660

-

1628369.56

... More
Copper cable as per specifications - 10 Sq.mm

830

-

191335.58

... More
Supply, erection & installation of cable conduits made up of GI pipes of medium class 'B' subject to owner's approval in trenches (a lready made), on walls, concrete structure etc., including supply and installation of all the necessary pipe fittings such as bends, sockets, elbows, tees etc., bending, threading, binding, clamping, providings, spacers, plugs, packings, bushings etc., as required Job complete in all respects including the cost of all labour, tools, material etc. and as per specifications and directions of s ite engineer / Engineer-in-Charge:

-

-

-

330

-

182262.56

340

-

244370.92

530

-

612097.74

... More
100 mm

420

-

898354.3

... More
150 mm

40

-

199048.54

... More
FLAME PROOF FITTINGS - All equipment under this category shall be suitable (minimum requirments) for location in zone-I gas group II A & IIB (Temp. class T3) area with a separate terminal box for incoming cable and a separate terminal box for out going cable (where applicable), apart from separate enclosure for each equipment including control gear etc. in IP 65 cast aluminium LM-6 certified en closure:

-

-

-

... More
FLAMEPROOF TUBELIGHT, 2x22Watt, LED, SUITABLE FOR Exd Gas Group II C, as per IS/IEC 60079-2007

18

-

220634.96

... More
FLAMEPROOF LED FLOOD LIGHT FITTING 90 W, Supply, installation, testing & commissioning of Ex'd' (Flameproof) Flood Light Fixture wit h provision of Cable Entries: 2 Nos. x 3/4" ET, Cable Glands: 2 Nos. x 3/4" ET (Max. OD 20mm) - Ex'd'(IIA/IIB), Double Compression type, Brass Nickel Plated with PVC Hood. Blanking Plug: 1 No. x 3/4" ET - Ex'd', Brass Nickel Plated. Gasket: Neoprene, Hardware: SS 304, Earthing: External 2 Nos. (M6), Internal 1 No. (M5), and as per attached detailed technical specification.

45

-

861376.52

... More
FLP & WP JUNCTION BOX - Supply, erection, installation, testing and commissioning of flameproof & weather proof junction box for pr oviding cable termination of motor, including connection and termination of earthing wire and conduits etc., including supply & inst allation of double compression cable glands & flame proof plugs for sealing all spare entries complete as per drawings, specificatio ns and direction of the Site Engineer, including the cost of all labour, tools, consumable materials etc., complete in all respect:

-

-

-

... More
8 way junction box with 8 cable entries (1 x 1" & 7 x 3/4") at bottom & 20 nos. terminals.

2

-

28486.76

... More
6 way junction box with 6 cable entries (6 x 3/4") at bottom & 20 nos. terminals.

3

-

43257.14

... More
4 way junction box with 4 cable entries (4 x 3/4") at bottom & 20 nos. terminals.

10

-

96910.92

... More
Flame proof, weather proof, single phase, 12" exhaust fan, IP65, LM6 type EF1001 of FCG or equivalent alongwith supporting frame, bo lts, louvers, flame proof motor, including supply & installation of double compression cable glands & flame proof plugs for sealing all spare entries, complete in all respects

11

-

186878.12

... More
Supply, installation, testing & commissioning of Flame proof weather proof ON/OFF Rotary Switch , IP65, LM6, including including sup ply & installation of double compression cable glands & flame proof plugs for sealing all spare entries etc., complete in all respec ts.

11

-

78487.2

... More
FLP/WP DISTRIBUTION BOARDS - Supply, erection, installation, testing and commissioning of flameproof /weather proof (IP-65) distrib ution board as per technical specification of types mentioned for lighting purpose in MLPU / booster shed etc., including connection and termination of power cables, earthing wire and conduits etc. including including supply & installation of double compression ca ble glands & flame proof plugs for sealing all spare entriescomplete as per drawings, specifications and direction of the Site Engin eer, including the cost of all labour, tools, consumable materials etc. complete in all respect:

-

-

-

... More
Outdoor Type, floor mounted, flameproof, weatherproof (IP 65) Lighting Distribution board Type-I DB with Bus bar - 100 A TPN, Incom er - 1 no. 63 A TPN MCB & Outgoing - 9 no. 10 A SPN, MCB

3

-

318201.43

... More
Outdoor Type, floor mounted, flameproof, weatherproof (IP 65) Lighting Distribution board Type-II DB having Bus bar - 100 A TPN, Inc omer - 1 no. 32 A TPN MCB & Outgoing - 3 no. 6 A SPN MCB

2

-

104860.51

... More
"FLP/WP SWITCH CUM SOCKET - Supply, erection, installation, testing and commissioning of flameproof /weatherproof switch cum socket /welding receptacle of approved makes to be installed on walls, coloumns, structures, including supply & installation of double com pression cable glands & flame proof plugs for sealing all spare entries etc., including connection and termination of earthing wire and conduits., etc. complete as per drawings, specifications and direction of the Site Engineer, including the cost of all labour, t ools, consumable materials etc. complete in all respect: 415V, 63A, Switch & Socket with Plug (No. of Pins 3P +N+ E), Model EPSS 1563-61 of Baliga or Equivalent approved make"

2

-

43722.07

... More
Supply and installation of shock treatment chart framed in good quality glass in English / Hindi / Local Language.

23

-

60037.21

... More
Supply and installation of vitreous enamel caution boards suitable for 440 V/11KV/6.6 KV as per IS 255 including fixing on the wall with all the required hardware etc. complete in English / Hindi/ Local Language.

23

-

59968.27

... More
Supply and installation of approved quality stainless steel name inscription plates including anodising, engraving the inscriptions, providing screws, etc. for equipments viz. motors, motor control centres, switchgears, push button stations etc. as required, provi ding necessary holes tapping etc. and fixing the same complete in all respect as per the direction of Site Engineer/Engineer-in-char ge including the cost of all labour, tools etc.

16

-

19206.81

... More
"Supply and installation of approved quality plastic name inscription plates including engraving the inscriptions, providing screws , etc. for equipments viz. motors, motor control centres, switchgears, push button stations etc. as required, providing necessary ho les tapping etc. and fixing the same complete in all respect as per the direction of Site Engineer/Engineer-in-charge including the cost of all labour, tools etc."

16

-

15613.38

... More
Point wiring - Supplying, installation and testing with 1.5 Sq.mm stranded PVC insulated copper conductor wires for phase & neutral of 650V grade including earthing by providing 1.5 Sq.mm earth insulated continutity wire of copper in PVC conduit (Supply & installa tion of PVC conduit covered elsewhere in SOR) recessed on wall/ceiling/ false celing including supply & installation of switch boxes ,junction boxes, pull boxes, bushes, screws, check nuts, bends, modular switches and sockets . The circuit wiring with 4 Sq.mm PVC copper wire from D.B. to switchboard as required is also in the scope of the contractor:

-

-

-

... More
1 light point controlled by 1 switch

116

-

175918.18

... More
2 light points controlled by 1 switch

38

-

70760.66

... More
3 light points controlled by 1 switch

9

-

20687.55

... More
Wiring with PVC insulated 2.5 sqmm copper conductor wire for fan points (1 fan point controlled by 1 modular switch) including provi ding space for electronic regulator in switch box, providing and fixing fan hook in the ceiling as per specifications and drawings.

62

-

150464.51

... More
Wiring with PVC insulated 2.5 sqmm copper conductor wire for phase & neutral , 650 V grade including earthing , the third pin with 1 .5 sqmm copper conductor earthing insulated continuity wire for exhaust/ wall bracket fan including providing and fixing of 5 pin 6 A modular socket and 10 A modular switch near the door or as as per specifications and drawings. The circuit wiring shall be with 4 sq. mm PVC copper wire from switchboard to 1st exhaust fan for multiple exhaust fans in one circuit.

48

-

119282.14

... More
Wiring for 250 V single phase and neutral 16 amps modular power plug point with PVC insulated 4 sq. mm. copper conductor wires for phase & neutral, 650 V grade including earthing, the third pin with 2.5 sq. mm copper conductor earthing insulated continuity wire, complete with providing and fixing of 6 pin 16/6A modular socket and 20/10 A modular switch (1 plug point per circuit) as per specif ications and drawings

79

-

298960.27

... More
Wiring for 250 V single phase and neutral 6 amps modular plug point with PVC insulated 2.5 sq. mm. copper conductor wires for phase & neutral, 650 V grade including earthing, the third pin with 1.5 sq. mm copper conductor earthing insulated continuity wire, comple te with providing and fixing of 5 pin 6A modular socket and 10 A modular switch (1 plug point per circuit) as per specifications and drawings.

79

-

217556.84

... More
"Point wiring for power plug point with 4 sq.mm stranded PVC insulated copper wire including earthing the third pin with 2.5 sq. mm copper insulated earthing wire complete with supply and fixing of recessed mounted industrial type 3 pin 32 A metal clad socket and plug, 20A MCB (Motor duty) housed in a 16 gauge M.S. Box "

17

-

71163.65

... More
Wiring for 250 V single phase and neutral 6 amps modular plug point with PVC insulated 2.5 sq. mm. copper conductor wires for phase & neutral, 650 V grade including earthing, the third pin with 1.5 sq. mm copper conductor earthing insulated continuity wire, comple te with providing and fixing of 3 numbers, 6 A 5 pin modular sockets and 10 A modular switches for UPS point as per specifications a nd drawings

4

-

10822.02

... More
Lighting Distribution Board / AC Distribution Board - Supply , installation, testing and commissioning of TPN lighting / AC Distribu tion board of approved make, with rating and feeders as per specification. The DB shall be of IP-42 protection class and shall conf orm to IS 8623. The board shall be fitted with an acrylic door as per specifications and drawings:

-

-

-

... More
Type III Distribution Board: Double Door EURODB of Havells or equivalent approved make having bus bar 200 A TPN, 1 Incomer 125 A FP MCB Isolator with 125 A FP RCCB (Senstivity 100 mA) alongwith 3 numbers 63 A TPN MCB as per specification.

3

-

329152.21

... More
Type IV DIstribution Board: Double Door Translucent Euro DB of Havells or approved make, having 100 A TPN Copper Bus bar, 1x63 A TPN MCB , 1x63 A RCCB (100 mA Sensitivity), 9x6A SP MCB & 6x20 A SP MCB as per specification

13

-

1304168.14

... More
Type V Distribution Board: Double Door, EURO DB of Havells or equivalent approved make having 200 A TPN Bus Bar, 1 x 100 A FP MCB, 1 x100 A FP RCCB (100 mA Sensitivity), 9x32 A SPN Motor duty MCB as per specification.

3

-

257401.75

... More
Critical Light DB: Euro DB DBOXx of Havells or equivalent make complete with bus bar, neutral links, earth links and 1 x 6 A MCB SPN & 7x2 A SPN MCB

4

-

47589.54

... More
Decorative Light fittings - Supply, installation, connection, earthing and testing of the following fittings, including supply and i nstallation of drop pipes, hooks, fittings, fixtures, nuts,bolts, supports, on walls, outlet box for regulators and all other requir ed materials etc. as per specifications, drawings and directions of the Site Engineer including cost of all labour, tools, materials etc. complete in all respects.Make of the fittings can be the make mentioned in the respective SOR items or equivalent model from t he approved make list given in the specifications:

-

-

-

... More
LED light fittings, Recess mounting type, Sereno LED-RC869B LED 30S-6500 PSE W30L120 D8 or equivalent approved make with LEDs: Suppl y and fixing of recess mounted weather proof light Sereno LED-RC869B LED 30S-6500 PSE W30L120 D8 or equiavlent approved make with L EDs, 42 W or more, having 2950 lumens or more output. LED Fitting of PHILLIPS or equivalent approved make complete with all accessor ies such as LED module, driver, optics, thermal sink, connector blocks etc including installation with LED of approved make.

17

-

156090.67

... More
LED light fittings with LEDs, Sereno LED-Suspended-SP824 P LED 30S-5000 GR OD or approved equivalent:Supply and fixing of surface mo unted weather proof light SP824 P LED 42 W having 2950 lumens output fitting of PHILLIPS or equivalent approved make complete with all accessories such as LED module, driver, optics, thermal sink, connector blocks etc including installation with LED of approved m ake.

108

-

1334871.55

... More
DN170C LED10S-6500 PSU WH: Supply and fixing of surface mounted weather proof light DN170C LED 15 W having 1000 lumens output fitti ng of PHILLIPS or equivalent approved make complete with all accessories such as LED module, driver, optics, thermal sink, connector blocks etc including installation.

17

-

169579.22

... More
Critical Light: Non Flame Proof type PEL 240 M/SL of Prolite or of approved make as per EIC, with 2 X 18 W LED TL/ Lamp including se aled lead acid battery of suitable size for minimum 01 hour back up, battery charger, for Fire fighting pump shed, HT/LT Room, Batte ry Room etc.The job includes connection of the fitting, 6A switch socket with 2C x 4 sqmm cable from DB/switch board and as mentione d above including all accessories etc. complete in all respect as per direction of EIC / Site engineer.

8

-

199267.26

... More
Supply, installation, testing and commissioning of swan neck lighting pole of 100mm nominal Diameter B class MS pipe (Height of bot tom of light fitting shall be 5 meters from FGL), having base Plate 200mmx200mmx5mm along with Flameproof and Weatherproof 2x18W LE D well glass light fitting complete with lamp and builtin control gear and choke of approved make, including supply and installation of earthing conductor of 8 SWG GI wire, nuts, bolts, Neck portion of lighting pole shall made up be of 50mm diameter GI pipe (radiu s of neck shall be 250mm). The pole shall be painted with 01 coat of primer and 02 coats of aluminium paint. The job shall also incl ude supply and installation of 4 way Flameproof/weather proof junction box (with 4 cable entries) having 8 Nos., 6A, 440V shrouded t erminal, with double compression FLP glands/lugs with looping arrangement and supply and termination of 3C X 2.5 sq. mm. armoured co pper PVC/XLPE insulated cable from JB to light fitting The job complete in all respects as per specifications, drawings and instruct ions of EIC / Site engineer.

92

-

2894604.76

... More
Supply, installation, testing and commissioning of street lighting pole model no. BRP32024LED HP/CW PSU GR of Philips or equivalent approved make- Pressure die cast LM6 Aluminium housing for sturdiness. 24 nos High Power LEDs with unique penut lense for uniform li ght distribution. Efficacy of LEDs greater than 125lumens/watt. Life class of 50000 burning hours at L70 with excellent thermal mana gement. UV stabilized polycarobonate cover. Ingress protection of IP65 for complete luminaire. System level output of 3500 lumens at total system power consumption of 45W. CRI70 and wide operating voltage range of 100-300V. Constant current electronic driver. Lig hting Level Meets all types of Roads up-to B1 category roads as per IS 1944. Rate including Providing & fixing 6 m height, 114.3/38. 9/76.1 mm dia Swaged Welded Steel Tubular Pole with all necessary items and erecting the pole 1200 mm deep into ground and making co ncrete muff 1:4:8 and making the pole top collar to suit the size of the fitting for connection & earthing links and painting the po les as required. Providing a MCB & outdoor weatherproof Junctin box for accomodating 4C armoured cable, providing 1 no. 6A SP MCB, 3 C x 2.5Sqmm armoured XLPE cable and termination to individual fittings in different phases (RYB sequence). The job complete in all r espects as per specifications, drawings and instructions of EIC / Site engineer.

2

-

91273.19

... More
Ceiling fan, BEE 5 star rated, with electronic regulator & other accessories and fittings etc. of or approved make with 56" Sweep s ize

48

-

194992.83

... More
12" Oscillating wall mounted bracket fan, noiseless, plastic moulded construction, rotary device for 3 step speed control integrated unit of approved make with all accessories complete in all respect.

14

-

142181.2

... More
Exhaust fan - Supply, installation, testing of single phase 230 V, industrial type heavy duty exhaust fan of GEC/Usha/Crompton Greav es or of approved make fitted/ provided with louvres, supports etc. including making the required opening on walls, fixing and conne cting the wires etc. including earthing the body of the fan, making good the opening on the wall etc. complete as per specifications , drawings and direction of Site Engineer including the cost of all labour, tools, materials etc. complete.

-

-

-

... More
18" Sweep

44

-

533754.73

... More
12" Sweep

11

-

78989.14

... More
PVC Conduit pipes - Supply, installation, fixing in position, PVC conduit pipes, of ISI marked , in concrete, brick work etc. during or after construction by making grooves in the wall, ceiling etc. cutting threads and jointing the pipes with PVC couplers, providi ng necessary tees, bends, junction boxes etc. with 12 SWG GI wire inside conduit without joint for concealed wiring, including makin g good the concrete, brick work, surfaces etc. complete as per drawings and direction of Site Engineer / Engineer-in-charge includin g cost of all labour, materials etc.:

-

-

-

1800

-

234574.56

1200

-

222071.28

1200

-

266505.36

... More
Supplying and laying reinforced cement concrete light duty hume pipe, non pressure type (NP3), centrifugally cast conforming to I.S .458 with 1:3:6 concrete casing at joints as required with necessary slope including excavation, backfilling, supply of collars, jo inting of pipes with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement: 2 fine sand), testing of joints, complete i n all respects as per specifications, drawing and the direction of the EIC/Site Engineer:

-

-

-

... More
300 mm dia

430

-

1379123.35

... More
200 mm dia

430

-

745893.22

... More
Supply fixing and erection of modular cable transit (MCT) for cable entry to building in proper frame including supply of peelable t ype, spare block, stay plates compression wedgs etc. with all accessories as per specification considering 20 % minimum spare in eac h module to be installed as per instruction of Engineer in charge/ site engineer:

-

-

-

... More
Galvanised mild steel frame with packing space of Min.120x240 mm with multi diameter blocks and accessories with peeling off arrange ment to adjust cable size from 3.5mm to 99mm outer dia

33

-

819069.02

... More
Galvanised mild steel frame with packing space of Min.120x180 mm with multi diameter blocks and accessories with peeling off arrange ment to adjust cable size from 3.5mm to 99mm outer dia

4

-

97425.38

... More
Supply, installation and testing of Lightning arrestor on top of the MOV buiding or MOV CP buiding for diverting lightning surges to the ground. The work shall include supply of 1.2 Meter long copper lightning arrestor with 5 spronged phenyl rod base plate etc. co mplete with necessary insulators including supply and fixing of 50 x 6 mm GI earthing strip of required length and connection to the main earthing grid.

22

-

127302.13

... More
Supply and fixing of Fire Siren Board for 2.1 kW Fire Siren as per specification.

3

-

166551.73

... More
"Conversion of SFU feeders in the existing LT panel to 160 A MCCB feeders through retrofitting: Supply and installation of 160 A MC CB in the existing 415V PCC panel, including bus bar extension, if required. The work includes the following. A. Supply of 160 A Moulded Case Circuit Breaker (MCCB) of approved Make with Built in electronic release for Short Circuit, overload and earth fault Protection Poles: 04, Voltage: 415 V, 50 Hz, 3-ph AC, External Rotary Operating Mechanism with Handle, Indicating Lamps, LED Type ON/OFF/TRIP , Control Fuse base & fuse link with operation indicator, Phase Indicating lamps.Sizing of the supplied components shall be as per Type-2 coordination chart. B.Erection, installation, testing and commissioning of 415 V, 160 A MCCB in the existing owner's power-control- centres, assembling as required, aligning, bus bar extension if required, making all the inter connections /outgoing/incoming power & control cable/ b us duct connection including making holes for cable entries as required, TB replacement suitable for termination of upto 3.5CX240 Sq mm cable, extension of control wiring to the control TB for controls with provision to extend to marshellling as per drawing, speci fications and directions of the Site Engineer/Engineer-in-Charge including cost of all materials, tools labour etc. complete in all respect including termination of all power, control cables, internal wiring, earthing of LT panels, supply of cable glands etc.compl ete as per cable schedule, drawings etc.: C.Supervision for retrofitting, erection & commissioning of MCCB feeder in the existing PCC panel (AT IOCL COIMBATORE) "

2

-

328379.23

... More
TCP-PCP-Supply

-

-

-

... More
Supply of Solid State Diode Decoupling Device (min 5 kA @ 30 cycles) of approved make including required length of cable as per spec ifications

50

-

4084460.85

... More
"Supply of Surge Arrestors of approved make including required length of cable & as per specifications for protection of insulating couplings: Spark Gap Surge Arrestor for above ground and under ground suitable for 100 kA lightening Impulse Current (10/350 micro s), rated sp ark over voltage = 1.25 kV in flameproof weatherproof enclosure Ex d IIC, IP 66 with connecting cable (EXFS 100 KU of Dehn or eq .)"

32

-

493912.88

... More
Supply of Cathodic Protection unit of approved make, complete in all respects as given in the specification with all its accessories to ensure trouble free operation

-

-

-

... More
Automatic type Cathodic Protection Transformer Rectifier (CPTR) unit with 230 V AC input and 25 V,25 A DC output rating with SCADA l inkage facility as per specifications

1

-

408415.64

... More
Automatic type Cathodic Protection Power Supply Module (CPPSM) cum Cathodic Protection Transformer Rectifier (CPTR) unit with 48 V D C & 230 V AC input and 25 V, 25 A DC output along with DC-DC converter & TRU with built in digital data logger having GSM mobile pho ne connectivity, SCADA linkage and data downloading facilities for data downloading/monitoring,complete as an intergral unit, as per specifications and of approved make

3

-

1353524.42

... More
Supply of junction box of approved make as per specification detailed in the tender document complete with all connecting terminal & shunts, other fittings, DC bus, MS plate box, bakelite terminal board, cable termination bolts, painting etc.

-

-

-

... More
Flameproof & weatherproof Anode Junction Box of approved make

4

-

70647.78

... More
Supply of Flameproof & weatherproof CJB with accessories for distribution of current among pipelines as per technical specification.

5

-

123187.75

... More
"Supply of wall mounted DC distribution board of approved make in IP-42 ingress protection for power supply to CP equipments as give n in technical specifications: DC distribution board with one incomer, 100 A DP MCB & outgoing feeders 1x63A DP MCB & 2x32 A DP MCB"

3

-

80859.55

... More
Supply of XLPE insulated , PVC sheathed cable, 1100 V grade conforming to IS: 7098 (P-1) as per specifications and approved make

-

-

-

... More
Copper Cable size 1cx35 sq. mm Armoured

1200

-

565210.56

... More
Copper Cable size 1cx25 sq.mm Armoured

1600

-

451401.92

... More
Copper Cable size 2cx6 sq.mm Armoured

1200

-

244585.68

... More
Copper Cable size 2cx25 sq.mm Armoured

500

-

331143.4

... More
Copper Cable size 2cx70 sq.mm Armoured

500

-

345787.2

... More
Copper Cable Kynar/HMWPE size 1cx10 sq.mm Unarmoured for distributed anodes of station CP system

100

-

21876.02

... More
Supply of Cu- Cuso4 Permanent Half cell with minimum 10 m length of tail cable, as per specifications of approved make

12

-

127411.26

... More
Supply of Cu- Cuso4 portable Half cell, as per specifications of approved make

2

-

12980.45

... More
Supply of Pipe locator cum Current Mapper with GPS and with A frame and all accessories of approved make as per specifications comp lete in all respects

1

-

340934.64

... More
Supply of hand held data logger for ON/OFF PSP measurement alongwith carrying case, data downloading cable and other required access ories complete as per specifications and approved make

2

-

331132.33

... More
TCP-PCP-Services

-

-

-

... More
Installation of solid state decoupling device as per specifications including terminating the cables in the TLP box with cable lugs, sealing material, laying of cable, testing & commissioning of Zinc anodes etc. all complete with required material, excavation, bac kfilling etc. as per specification and directions of Site Engineer/ Engineer-in-Charge.

50

-

443052.24

... More
Installation of surge arrestors including terminating the cables, testing & commissioning of surge arrestors etc. all complete with required material as per specification and directions of Site Engineer / Engineer-in-Charge.

32

-

285362.14

... More
Installation of Permanent half cells including connecting the cable in the TLP etc. with cable lugs, sealing material, laying of cab le, testing & commissioning of cell etc. all complete with required material, excavation, backfilling etc. as per specifications, r ecommendation of cell supplier and directions of Site Engineer / Engineer-in-Charge.

12

-

122326.26

... More
Conducting " Coating-Resistance Survey" for calculation of specific coating resistance of the pipeline in ohms.sq.m. along the entir e pipeline and submitting the report in hard as well as soft copy as per Specification / approved procedure and directions of Site E ngineer / Engineer-in-Charge.

113

-

236494.49

... More
"Conducting Close Interval Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cos t of all competent manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locat ions where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 3 sets including one soft copy containing the s urvey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Sit e Engineer / Engineer-in-Charge.: Close Interval ON/OFF Potential logging survey"

113

-

583630.51

... More
"Conducting Close Interval Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cos t of all competent manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locat ions where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 3 sets including one soft copy containing the s urvey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Sit e Engineer / Engineer-in-Charge.: Close Interval Natural Potential Logging Survey"

113

-

728353.75

... More
"Conducting Direct Current Voltage Gradient Survey over the buried line, logging all measurements, to identify / pin point the coat ing defects on pipeline including the cost of all competent manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. inclu ding the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 3 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and compl ete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contract or, who will arrange to repair the defects."

113

-

677912.56

... More
Conducting "Soil Resistivity Survey" at anode bed location after ascertaining its suitablity with respect to the existing system , f or installation of Anode Bed (deep / shallow / distributed), as per the specification, approved procedures and instructions of Site Engineer / Engineer-in-Charge.

4

-

49578.69

... More
"Conducting AC interference survey, to detect presence of any AC voltage(induced owing to proximity of any HT transmission line (33 KV and above) crossing or running parallel within a distance of 60 M from the pipeline alignment as per approved procedure. The wor k shall be completed in all respects including survey, data logging for specified period, recommending mitigation measures & post mi tigation survey. The work includes all tools, tackles, consumables etc. all complete, required for survey / test as deemed necessary and as per the directions of the site engineer / Engineer-in-Charge. Note : AC interference survey shall be done at respective TLP by connecting data logger to maintain record for minimum 24 hours. The data to be submitted for each such TLP alongwith coloured graph and recommendations."

24

-

378865.81

... More
Conducting Mututal Interference Survey among the new and existing pipelines / facilities /foreign pipeline by taking PSP survey of a ll the pipelines as per approved procedure to determine level of interference at different places along the pipeline and at point of crossing in common ROW including identifying points and providing the data/ record in graphical form and carrying out all necess ary work for mitigating the interference observed among the pipelines , including retesting the same to ensure efficacy of the remed ial measures undertaken.The contractor shall submit a full final report with detailed PSP readings at all TLPs along with graphs in 3 sets.The item should be complete in all respect including survey, work for mitigating the interference and post mitigating survey as per specifications/directions of site engineer / Engineer-in-Charge.

113

-

1130955.21

... More
Carrying out the Current Attenuation(CAT) Survey at 50 meters interval by measuring current loss along the mainline pipe and using R adio Detection Instruments. Completing the entire work as per specification and EIC`s direction including all equipments with its ac cessories etc.tools, tackles, Battery transportation (Vehicle), related equipments,consumables, if any labour /manpower and any / al l relevant data collection as may be deemed necessary for carrying out the survey and interpretation /presentation of the results in cluding submission of reports complete in all respect thereof. Also locating the exact position of buried pipeline/defect of Pipelin e coating.Route mapping of the entire stretch at an interval of 10M with the help of GPS instrument (to be arrange by contractor)and submission of the hard and soft copy to the EIC.

113

-

932487.96

... More
"Cathodic Protection Units : Erection, testing and commissioning of cathodic protection units (CPTR/CPPSM); including supply and installation of all facilities, materials etc., including fuses, all supporting structures, laying and connecting the 1100 V Grade power cable (2 runs of 1Cx25 sqmm Cu. conductor XLPE insulated Armoured Cable) from DCDB to CPPSM unit / laying and connecting the 1100 V Grade power cable (owner pr ovided 1 run of 3Cx10 sqmm Al. conductor XLPE insulated Armoured Cable) from ACDB to CPTR unit or both as required, providing earth ing arrangement. The work includes furnishing the test results by conducting all the NO LOAD and ON LOAD tests on the CP units and a djusting settings as required and testing the pipeline section for full cathodic protection for entire stretch. The job complete in all respect shall include cost of all labour, tools as per specifications and directions of the Site Engineer / Engineer-in-Charge. "

-

-

-

... More
230 V AC operated auto type Cathodic Protection Transformer Rectifier (CPTR) unit of rating 25 V 25 A DC with SCADA linking facility

1

-

43627.76

... More
230V AC cum 48 V DC Operated automatic type Cathodic Protection Power Supply Module (CPTR cum CPPSM) unit of rating 25 V, 25 A DC wi th with DC-DC converter & SCADA linkage facility as per specifications

3

-

168602.62

... More
Installation of CJB / AJB as per technical specifications.

9

-

193616.09

... More
Installation and commissioning of wall mounted DCDB including supply of all cable end lugs, cable glands, fittings & fixtures and al l other required accessories, tools and tackles complete in all respects as per directions of Site Engineer/Engineer-in-charge. Item includes supply and termination of 2 runs of 1cx25 sq. mm copper cable for Battery Bank

3

-

14610.71

... More
Measuring, recording and submitting the cathodic protection readings along the entire pipeline by repeated adjustments of the settin gs of the CPTR/CPPSM units etc as per specifications for achieving full/maximum protection of all the stretches as per the criteria of protection mentioned in the specifications. Measuring the relevant readings at the cathodic protection stations and "pipe to soi l potential" readings at all the test lead locations along the pipeline including the CP station parameters like current(AC/DC), vo ltage(AC/DC),circuit resistance,battery voltage/current etc.,preparing and submitting pipe to soil potential profile, graphs and ot her data pertaining to the cathodic protection of the pipeline,job complete in all respects as per specification and instructions o f Site Engineer / Engineer-in-Charge, including cost of all labour, instruments and services rendered.

113

-

69670.15

... More
"Final Commisioning of CP system Final Commissioning of the impressed current cathodic protection system for the mainline for achieving full protection as per protec tion criteria as mentioned in the specifictions through repeated adjustments of the CP units after installation of galvanic anodes f or hot spot protection and mitigation of AC/ DC interference, if any and submission of the resultant data to the owner and testing, measuring, recording and submitting all these data once again after the lapse of a period as per specifications / directions of the Site engineer / Engineer-in-Charge, including the cost of all labour tools and materials as required, complete in all respect."

1

-

144021.53

... More
Pipe to Soil potential Readings : Measurement, recording and submission of Pipe to Soil Potential readings by connecting / disconnec ting the Mg anodes (for achieving optimal protection through TLPs) along the entire pipeline and at stations, including preparing an d submiting relative PSP profile and other relevant data pertaining to the cathodic protection of the pipeline, including cost of al l labour, instruments and services rendered. The readings shall be furnished as per the specifications and as per the directions of the Site Engineer/Engineer-in-Charge

113

-

62853.81

... More
Cable Laying: Laying of all type of cables LT (PVC / XLPE / Armoured/Unarmoured/Power/ Control/ Signalling) in trenches, in cable racks, in trays, in protective pipes, poles, columns, in conduits, in panels and on structures etc.; including the supply and insta llation of all required materials such as fixing clamps, screws, cable straps, tags, etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and panels) complete in all respect, including cost of all lab our, tools, consumable materials, etc. and cutting the cables in required lengths as per drawings, specification and directions of Site Engineer / Engineer-in-Charge:

-

-

-

... More
Power cables LT : OD upto 20 mm

4600

-

195299.44

... More
Power cables LT : OD above 20 mm and upto 40 mm

500

-

30479.4

... More
TCP-PCP-Composite

-

-

-

... More
Zinc Anode for Hot spot protection : Supply, Installation , testing and commisioning of Zinc anode (minimum 10 Kg each) including it s tail cable of size of 1c x 25 sq.mm. XLPE/ PVC insulated stranded copper cable of total length 10 meter including PVC cap, special back-fill material ( filled in cotton sack) with sealing compound complete in all respect including its excavations, back filling e tc. as per specifications and drawings. The work complete in all respect shall include supply of all labour , tools etc. and shall b e carried out as per the directions of the Site Engineer / Engineer-in-Charge and as per AFC drawings.

150

-

1549254.45

... More
"Supply & installation of Anode bed ( deep well type with MMO anodes) as per the approved configuration for Impressed Current Catho dic Protection system including supply, laying & termination of all anodes, anode tail cable (XLPE insulated copper conductor) suit able with length for connecting upto Anode junction box without any joints in between including laying of PVC sleeve / trunk pipe, casing pipe , centralizers, vent pipe & drawing all the lead wires through the pipe and connecting the same with Anode bus in Anode junction box including erection and providing foundation of Anode Junction Box as per specifications inlcuding supply, excavation , backfill of earth etc. as per specification & also compacting the same with soil for restoring it to normal finished ground level all complete with all labour & material as per instruction of Site Engineer / Engineer-in-Charge, Specifications and approved draw ings. Note : Each Anode bed means anode bed at each location irrespective of number of anode strings required."

3

-

2116407.27

... More
"Supply & installation of Anode bed ( shallow type ) as per the approved configuration for 'Impressed Current Cathodic Protection' system including supply, laying & termination of all anodes, anode tail cable (XLPE insulated copper conductor) suitable with length for connecting upto Anode junction box without any joints in between including laying of PVC sleeve / trunk pipe & drawing all th e lead wires through the pipe and connecting the same with Anode bus in Anode junction box including erection, providing foundations of Anode Junction Box, chain link fencing around anode junction box wherever required, as per specifications including supply of b ack fill material, excavation, backfill of earth and filling the sand with requisite back fill material as per specification & also compacting the same with soil for restoring it to normal finished ground level all complete with all labour and material as per ins truction of Site Engineer / Engineer-in-Charge, Specifications and approved drawings. Note : Each Anode bed means anode bed at each location irrespective of number of anode strings required."

1

-

408171

... More
"Cable Marker Supply, erection and installation of MS cable markers; including excavation,installation of the markers,cement concrete grouting, back-filling etc. required as per drawings, specifications and directions of the Site Engineer,including the cost of all ma terials, labour,tools etc. complete in all respects as per the directions of Site Engineer / Engineer-in-Charge."

26

-

31681.4

... More
Magnesium Anode : Supply, Installation , testing and commisioning of Magnesium anode (minimum 5 Kg each) including its tail cable o f size of 1c x 10 sq.mm. XLPE/ PVC insulated stranded copper cable of total length 10 meter including PVC cap, special back-fill mat erial ( filled in cotton sack) with sealing compound complete in all respect including its excavations, back filling etc. as per spe cifications and drawings. The work complete in all respect shall include supply of all labour , tools etc. and shall be carried out as per the directions of the EIC/ Site Engineer and as per AFC drawings.

151

-

1210551.36

... More
Test Lead Point : Supply, installation, testing & commissioning of Test Lead Point (TLP) fabricated MS Sheet with hinged front door , Heavy Guage MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal bolts, neoprene gasket for front do or, vandal proof concealed lock, etc as per latest revision of Standard AFC drawing (9200-99900-404-603-00 : STD-483). The work inc ludes providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through f oundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to coat & wrap (with coating repair etc.), back filling the trenches, cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, l aying & termination of all XLPE, Cu cables of required length (as per site conditions) and size, lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connec tion scheme, type etc., on the side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requir ement. The work complete in all respects including all materials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.

-

-

-

... More
Type A (With Ingress Protection IP:55)

95

-

1809496.9

... More
TLP type "A" , flame proof & weather proof as per specifications and drawing (With inbuilt provision of Voltmeter & pushbutton for P SP Measurment)

16

-

373342.75

... More
Type B (With Ingress Protection IP:55)

56

-

2568354.49

... More
Type B (Flameproof & Weatherproof as per specifications & drawing) (With inbuilt provision of Voltmeter & pushbutton for PSP Measurm ent)

8

-

493742.21

... More
Type C (With Ingress Protection IP:55)

5

-

140926.81

... More
Type D (With Ingress Protection IP:55)

2

-

43516.46

... More
Type DAC (With Ingress Protection IP:55)

24

-

864722.6

... More
Flameproof Type E (With Ingress Protection IP:55) as per specification

13

-

729585.89

... More
Flameproof Type DMV (With Ingress Protection IP:55) as per specification

13

-

640307.09

... More
Supply and Installation of prefabricated CS corrosion coupon with 1 sq. cm bare metal with 2 numbers 4 sq. mm lead of minimum 10 m long lead in a sdistance of 0.5 m from the pipeline inclusive of cable & terminating the cable in the TLP terminal. The corrosion co uponf are to be installed with specified test lead points for which prior apporval to be obtained from owner. The item also incluse ds supply, installation, laying & termination of all CU cables of required length (as per site condition) and size as mentioned in t he standard drawing, toggle switch, cable glands and lugs etc. , complete in all respect as per the direction and specification deta iled in the documetn complete with all tools , takles & other necessary requirement for preparation of the coupon . The work complet e in all respect shall include supply of all the labours, tols etc. compete as per the direction of site engineer/engineer in charge .

24

-

172800.43

... More
Supply, installation, testing and commissioning of two separate 4-20 mA converters(0-20 mV Input, 0 to-2VDC input respectively, 2x 4-20 mA Output in each converter) in pre installed TLPs at SV/IPIG/CP locations as per the approved drawings and specification deta iled in the document complete with tools, tackles & other necessary requirement. The work complete in all respects including all mat erials, tools, tackles, labour as per tender specifications, AFC drawings & directions of the Site Engineer/Engineer-In-Charge.

4

-

43259.13

... More
Preparation & installation of corrosion coupon from owner supplied coated pipe. which involves preparation of sample of size 2"x4", application of pipeline coating material on the coupon, soldering 6 sq. mm. cable with coupon, sealing the soldered joint with epoxy , positioning the coupon at the pipe line depth and with in a distance of 0.5 M from the pipeline inclusive of cable & terminating t he cable in the TLP terminal. The corrosion coupons are to be installed with specified Test lead points for which prior approval to be obtained from Owner. The item also includes supply, installation / laying & termination of all XLPE, Cu cables of required length (as per site conditions) and size as mentioned in the standard drawings, toggle switch, cable glands and lugs etc., complete in all respect. All as per the direction and specification detailed in the document complete with tools, tackles & other necessary require ment for preparation of the coupon. The work complete in all respect shall include supply of all labour, tools etc complete as per t he directions of the Site Engineer.

23

-

62040.41

... More
Mechanical-ML-Supply

-

-

-

... More
Steel Flanges: Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as pe r technical spe cifications from approved vendors specified in tender document

-

-

-

... More
4" WNRF 600#

35

-

117209.81

... More
2" WNRF 600#

42

-

41202.7

... More
4" BLRF 600#

7

-

20524.53

... More
2" BLRF 600#

14

-

11277.38

... More
Spiral Wound Metallic Gaskets: Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document:

-

-

-

... More
4" SWMG ANSI 600#

70

-

34378.12

... More
2" SWMG ANSI 600#

56

-

13785.61

... More
Steel Fasteners for Flanges: Supply and delivery of Steel Fasteners at respective stations as per Station wise Break up of material supply and as per technical s pecifications from approved vendors specified in tender document.

-

-

-

... More
Fasteners for Flanges 4" x 600# ( 0.875" Dia. X 7.75" Length) - extended stud length for flanges with spectacle blind

56

-

19790.96

... More
Fasteners for Flanges 4" x 600# (0.875" Dia. X 6.50" Length)

448

-

134850.78

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 4.75" Length)

448

-

53503.65

... More
UnEqual Tee: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document:

-

-

-

... More
12" x 4" ANSI 600# Un Equal Tee (Crossbar)

6

-

92122.62

... More
8"x4" 600# Unequal Tee (Crossbar)

8

-

62814.04

... More
4"x2" 600# Unequal Tee

14

-

22401.29

... More
Equal TEE: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per te chnical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
4" 600# Equal Tee

7

-

12147.49

... More
Elbow-90 deg LR Bends: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply a nd as per technical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
4" 600# 90 deg LR Bend

35

-

83215.37

... More
Concentric Reducer: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical sp ecifications from approved vendors specified in tender document

-

-

-

... More
2"x1" x Concentric Reducerx 600#

14

-

11413.83

... More
Weld-o-let: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per t echnical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
12"x2" X 600# Weld-o-let

6

-

17862.98

... More
8"x2" X 600# Weld-o-let

14

-

41680.29

... More
SPECTACLE BLINDS: Supply and delivery of following mentioned Spectacle Blinds at respective stations as per Station wise Break up of material supply and as per technical specifications indicated in tender documents.

-

-

-

... More
4" Spectacle Blind 600# F/F

7

-

137384.45

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical sp ecifications from approved vendors specified in tender document.

-

-

-

... More
4.50" OD x 0.237" WT ASTM A 333 Gr. 6 PIPE

280

-

997391.7

... More
2.375" OD x 0.218" WT ASTM A 333 Gr. 6 PIPE

70

-

121048.65

... More
1.315" OD x 0.179" WT ASTM A 333 Gr. 6 PIPE

70

-

55022.34

... More
"Supply and delivery of API 6D/BS 5351/ISO 17292 Ball valve for use in process piping at respective stations as per Station wise Bre ak up o f material supply and as per technical specifications from approved vendors specified in tender document."

-

-

-

... More
2"x ANSI 600# HOV F/F A/G API 6D Ball Valve

28

-

1187281.83

... More
2"x ANSI 600# HOV W/W A/G API 6D Ball Valve

14

-

433966.03

... More
Globe Valves (HOV): Supply of Valves at respective stations as per technical specifications from approved vendors in the tender docu ment:

-

-

-

... More
4"x ANSI 600# F/F BS-1873 GLOBE Valve

14

-

840395.53

... More
"FIRE FIGHTING EQUIPMENT: Supply and delivery of Fire Fighting Equipment at respective stations as per Station wise Break up of mate r ial supply and as per technical specifications from approved vendors specified in tender document."

-

-

-

... More
9 kg DCP Extinguisher

21

-

113575.66

... More
4.5 kg CO2 Extinguisher

21

-

192909.82

... More
Sand drum with scoop

28

-

84111.25

... More
Pair of Rubber hand gloves for Electrical work bearing IS mark

7

-

10381.66

... More
First Aid Box with Snake serum

7

-

16600.45

... More
Safety Helmet

14

-

6415.05

... More
Explosimeter

7

-

335600.33

... More
Rescuscitor

7

-

45612.88

... More
Water gel blanket

7

-

118071.33

... More
Safety Torch

7

-

35777.12

... More
Wind socks

7

-

29916.65

... More
Red & Green flag (Pairs) 2 nos in each colour

14

-

26325.28

... More
Extinguisher box for 9 kg DCP Extinguishers

21

-

129135.52

... More
Dry Chemical Powder silliconised potassiun bicarbonate type IS marked, pack in 10Kg

7

-

2943.04

... More
CO2 cartridge - 200 gm capacity for 9 kg

7

-

5613.08

... More
Low temparature rubber hand gloves

14

-

187074.96

... More
PVC/Chemical protective clothing

7

-

20194.96

... More
Mechanical-ML-Services

-

-

-

... More
Insulating Coupling Erection: Taking delivery,shifting/transporting within station premises and installation of Insulating Couplings of the following sizes and pressure class, at elevations specified in the drawing, checking resistance value by meggar test before and after erection levelling, aligning and checking, making welded connections to the piping, coating & wrapping and completing the work in all respects in accordance with the relevant drawings, manufacturer's installation instructions, specifications and instruct ions of Site Engineer / EIC.

-

-

-

... More
4" x 150#/300#/600#/900# Insulating Coupling

14

-

85135.82

... More
Above ground process piping: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both fro m outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping includi ng cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment no zzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by wat er after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, fina l cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumable s necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.

-

-

-

... More
4 NPS 4.5" OD x 0.237"/0.337" WT ASTM A106/ A333/ A53 Pipe

224

-

809805.11

... More
2 NPS (2.375" OD x 0.218"/ 0.344" WT) ASTM A106/ A333/ A53 Pipe

56

-

84996.06

... More
"Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and e rection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, el bows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pes sure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment n ozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equi pment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning b y compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consuma ble necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and comp leting the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated. Note: 1. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. 2. Payment for external PU/ epoxy coating shall be done separately as per relevant SOR item .

-

-

-

... More
4 NPS 4.5" OD x 0.237"/0.337" WT ASTM A106/ A333/ A53 Pipe

56

-

214763.3

... More
2 NPS (2.375" OD x 0.218"/ 0.344" WT) ASTM A106/ A333/ A53 Pipe

14

-

27370.17

... More
Installation of BALL/GATE Valves MOV/HOV: Taking delivery of valves of all types and pressure rating from the designated location wi thin station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including e arth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above g round valves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground portions (if applic able) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) a nd completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC.

-

-

-

... More
12", 600#/900#, W/W

3

-

90478.72

... More
8", 600#/900#, W/W

4

-

80423.84

... More
4", 600#/900#, F/F

21

-

175920.65

... More
4", 600#/900#, W/W

14

-

140750.57

... More
2", 600#/900#, F/F

28

-

117280.44

... More
2", 600#/900#, W/W

14

-

70375.2

... More
Installation of GLOBE VALVE/CONTROL VALVE/MOTORIZED GLOBE VALVE/ROV/PLUG VALVE: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the dra wings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) or flood coating and wrappi ng of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically und ertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's install ation instructions and specifications and instructions of the Site Engineer / EIC.

-

-

-

... More
4", 600#/900#, F/F

14

-

118259.74

... More
Radiographic Inspection: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engi neer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inp uts, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on th e basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspe ction as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branc h pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost . v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all film s shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.

-

-

-

... More
12" NB Pipe Joints RT

18

-

58620.28

... More
8" NB Pipe Joints RT

24

-

48449.29

... More
4" NB Pipe Joints RT

280

-

424630.08

... More
2" NB Pipe Joints RT

98

-

79941.93

... More
Mechanical-ML-Composite

-

-

-

... More
Supply and Erection of Electroforged Grating: Supplying at site, steel structural items such as steel plates, bars, fabrication of g ratings by electroforged method, after complete fabrication entire gratings shall be Hot Dip galvanized, gratings shall be normany of size 810mm X 250mm for steps and 1200mm X 1000 mm or 810mm X 1000 mm for platforms / walkways, or any size as advised by EIC. Pla cing gratings in a replaceable mannerbolting with base frame of ISA by suitable GI clamps and GI fasteners, including supply of all other inputs such as labour, materials, consumable etc. necessary to perform and complete the work in all respect, in accordance wit h drawings, specifications and instructions of the Site Engineer / EIC.

3.5

-

849013.72

... More
Painting: Surface preparation of piping, equipment and valves etc. by abrasive blast cleaning or with power wire brush (wherever bla st cleaning is not possible) confirming to SA 2.5, making the surface free of dust, grease, mill scales etc., application of 1 coat x 50-75 microns DFT of Inorganic Zinc Ethyl Slicate Primer, followed by application of sealer coat of 30 micron DFT and intermediat e coat of 150 micron DFT with surface tolerant epoxy mastic paint and 2 coats x 50 micron each DFT of Isocynate Aliphatic Poly Ureth ene (PU) by airless spray, with approved materials, paints, tools, tackles, consulambles, non-consumables, labour, equipment etc. to complete the job in all respects as per specification and instructions of the Site Engineer / EIC. The total DFT shall be minimum 3 30 microns.

70

-

123296.19

... More
Cleaning exposed steel surfaces of piping, equipment and valves etc. by abrasive blasting or with power wire brush (wherever sand bl ast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials, labour, equipment etc. and completing the job in all re spects as per specification and instructions of the Site Engineer / EIC.

70

-

212645.44

... More
Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpowe r, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instr uction of EIC/ Site Engineer to complete work in all respects.

14

-

28191.88

... More
Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipmen ts, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of E IC/ Site Engineer to complete work in all respects.

84

-

164705.72

... More
Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping: Supply and Installation of one copper jumper per flanged joint across the flanged joints for valves, spool piece, branch offs etc., of product process piping, The job includes cutt ing drilling of holes of required size in the copper strips/ flats for bolting purpose and complete the works in all respects as pe r specifications & drawings and instructions of Site Engineer/ EIC. Note:- Copper jumpers shall be installed in all the flanged jo in ts of Product Process piping only and not in fire water lines.

-

-

-

... More
Up to 30 mm wide x 3 mm thick Copper strip

70

-

58158.66

... More
CSW Mechanical-Supply

-

-

-

... More
Steel Flanges: Supply and delivery of Steel Flanges at respective stations as per Station wise Break up of material supply and as pe r technical spe cifications from approved vendors specified in tender document

-

-

-

... More
12" WNRF 600#

6

-

165051.51

... More
10" WNRF 600#

16

-

346525.41

... More
8" WNRF 600#

51

-

884535.27

... More
6" WNRF 600#

14

-

165953.31

... More
4" WNRF 600#

28

-

93767.85

... More
3" WNRF 600#

9

-

13238.15

... More
2" WNRF 600#

56

-

54936.93

... More
1" WNRF 600#

30

-

22739.9

... More
8" WNRF 300#

26

-

174773.84

... More
6" WNRF 300#

4

-

13726.89

... More
4" WNRF 300#

4

-

8998.49

... More
3" WNRF 300#

10

-

12759.22

... More
2" WNRF 300#

12

-

8818.14

... More
1" WNRF 300#

48

-

21584.94

... More
10" BLRF 600#

1

-

16178.79

... More
8" BLRF 600#

4

-

39840.1

... More
6" BLRF 600#

6

-

37656.25

... More
4" BLRF 600#

12

-

35184.91

... More
3" BLRF 600#

2

-

3197.73

... More
2" BLRF 600#

9

-

7249.74

... More
1" BLRF 600#

6

-

2105.8

... More
8" BLRF 300#

1

-

5463.21

... More
6" BLRF 300#

4

-

11104.32

... More
4" BLRF 300#

4

-

8160.08

... More
3" BLRF 300#

20

-

22691.16

... More
2" BLRF 300#

6

-

3451.22

... More
1" BLRF 300#

3

-

1111.42

... More
12" BLRF 150#

2

-

16181.22

... More
4" BLRF 150#

1

-

1236.94

... More
16" SORF 150#

2

-

19086.5

... More
14" SORF 150#

2

-

13804.87

... More
12" SORF 150#

56

-

342723.26

... More
4" SORF 150#

20

-

19108.45

... More
Spiral Wound Metallic Gaskets: Supply and delivery of Spiral Wound Metallic Gaskets at respective stations as per Station wise Break up of material supply and as p er technical specifications from approved vendors specified in tender document:

-

-

-

... More
12" SWMG ANSI 600#

10

-

12868.96

... More
10" SWMG ANSI 600#

20

-

22691.16

... More
8" SWMG ANSI 600#

60

-

58933.92

... More
6" SWMG ANSI 600#

18

-

13249.09

... More
4" SWMG ANSI 600#

33

-

16206.83

... More
3" SWMG ANSI 600#

15

-

5538.68

... More
2" SWMG ANSI 600#

86

-

21170.76

... More
1" SWMG ANSI 600#

38

-

5001.45

... More
8" SWMG ANSI 300#

28

-

20882.93

... More
6" SWMG ANSI 300#

4

-

2671.28

... More
4" SWMG ANSI 300#

4

-

2003.45

... More
3" SWMG ANSI 300#

16

-

5186.52

... More
2" SWMG ANSI 300#

21

-

3582.94

... More
1" SWMG ANSI 300#

44

-

4075.2

... More
16" SWMG ANSI 150#

2

-

1608.62

... More
14" SWMG ANSI 150#

2

-

1396.58

... More
12" SWMG ANSI 150#

39

-

24001.27

... More
10" SWMG ANSI 150#

4

-

1944.97

... More
8" SWMG ANSI 150#

4

-

1598.85

... More
6" SWMG ANSI 150#

4

-

1145.54

... More
4" SWMG ANSI 150#

20

-

4582.18

... More
3" SWMG ANSI 150#

4

-

740.95

... More
2" SWMG ANSI 150#

4

-

482.57

... More
1" SWMG ANSI 150#

4

-

297.36

... More
Steel Fasteners for Flanges: Supply and delivery of Steel Fasteners at respective stations as per Station wise Break up of material supply and as per technical s pecifications from approved vendors specified in tender document.

-

-

-

... More
Fasteners for Flanges 16"" x 150# (1.000" Dia. X 6.00" Length)

48

-

12518.01

... More
Fasteners for Flanges 14" x 150# (1.000" Dia. X 6.00" Length)

48

-

14623.88

... More
Fasteners for Flanges 12" x 150# (0.875" Dia. X 5.50" Length)

288

-

52644.61

... More
Fasteners for Flanges 10" x 150# (0.875" Dia. X 5.25" Length)

96

-

16027.99

... More
Fasteners for Flanges 8" x 150# (0.750" Dia. X 4.75" Length)

96

-

12635.25

... More
Fasteners for Flanges 6" x 150# (0.750" Dia. X 4.50" Length)

96

-

10061.53

... More
Fasteners for Flanges 4" x 150# (0.625" Dia. X 4.00" Length)

160

-

12674.14

... More
Fasteners for Flanges 3" x 150# (0.625" Dia. X 4.00" Length)

96

-

6317.63

... More
Fasteners for Flanges 2" x 150# (0.625" Dia. X 3.75" Length)

96

-

6668.79

... More
Fasteners for Flanges 1" x 150# (0.500" Dia. X 3.00" Length)

96

-

5147.44

... More
Fasteners for Flanges 8" x 300# (0.875" Dia. X 7.5" Length) - extended stud length for flanges with spectacle blind

48

-

16203

... More
Fasteners for Flanges 8" x 300# (0.875" Dia. X 6.25" Length)

240

-

67563.02

... More
Fasteners for Flanges 6" x 300# (0.75" Dia. X 5.25" Length )

48

-

6571.94

... More
Fasteners for Flanges 4" x 300# (0.75" Dia. X 5.00" Length )

32

-

4172.48

... More
Fasteners for Flanges 3" x 300# (0.75" Dia. X 4.75" Length)

96

-

9710.36

... More
Fasteners for Flanges 2" x 300# (0.625" Dia. X 4.75" Length) - extended stud length for flanges with spectacle blind

24

-

2310.63

... More
Fasteners for Flanges 2" x 300# (0.625" Dia. X 4.00" Length)

144

-

12810.27

... More
Fasteners for Flanges 1" x 300# (0.625" Dia. X 3.5" Length)

156

-

11215.99

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 12" Length) - extended stud length for flanges with spectacle blind

40

-

30905.14

... More
Fasteners for Flanges 12" x 600# (1.25" Dia. X 9.75" Length)

120

-

76628.26

... More
Fasteners for Flanges 10" x 600# (1.25" Dia. X 11.5" Length ) - extended stud length for flanges with spectacle blind

80

-

76726.43

... More
Fasteners for Flanges 10" x 600# (1.250" Dia. X 9.50" Length)

176

-

129546.63

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 10" Length) - extended stud length for flanges with spectacle blind

156

-

86880.24

... More
Fasteners for Flanges 8" x 600# (1.125" Dia. X 8.25" Length)

492

-

216444.38

... More
Fasteners for Flanges 6" x 600# (1.0" Dia. X 9.0" Length) - extended stud length for flanges with spectacle blind

24

-

8130.96

... More
Fasteners for Flanges 6" x 600# (1.000" Dia. X 7.50" Length)

168

-

48727.39

... More
Fasteners for Flanges 4" x 600# ( 0.875" Dia. X 7.75" Length) - extended stud length for flanges with spectacle blind

8

-

2827.28

... More
Fasteners for Flanges 4" x 600# (0.875" Dia. X 6.50" Length)

248

-

74649.54

... More
Fasteners for Flanges 3" x 600# ( 0.75" Dia. X 6.75" Length ) - extended stud length for flanges with spectacle blind

24

-

3919.2

... More
Fasteners for Flanges 3" x 600# (0.750" Dia. X 5.50" Length)

72

-

10265.72

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 5.75" Length) - extended stud length for flanges with spectacle blind

112

-

15968.89

... More
Fasteners for Flanges 2" x 600# (0.625" Dia. X 4.75" Length)

560

-

66879.57

... More
Fasteners for Flanges 1" x 600# (0.625" Dia. X 4.00" Length)

152

-

14077.97

... More
UnEqual Tee: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical specifications from approved vendors specified in tender document:

-

-

-

... More
16"x 12" ANSI 150# Un Equal Tee

2

-

38962.68

... More
14"x 12" ANSI 150# Un Equal Tee

2

-

28704.07

... More
12" x 4" ANSI 150# Un Equal Tee

10

-

93726.34

... More
4"x3" 300# Unequal Tee-ASTM A420 Gr.WPL6

2

-

4248.21

... More
3"x2" 300# Unequal Tee-ASTM A420 Gr.WPL6

6

-

9571.31

... More
3"x1" 300# Unequal Tee-ASTM A420 Gr.WPL6

50

-

79760.92

... More
12" x 10" ANSI 600# Un Equal Tee (Crossbar)

1

-

15353.77

... More
12" x 8" ANSI 600# Un Equal Tee (Crossbar)

3

-

46061.31

... More
12" x 4" ANSI 600# Un Equal Tee (Crossbar)

6

-

92122.62

... More
10" x 6" ANSI 600# Un Equal Tee

1

-

12794.6

... More
8"x6" 600# Unequal Tee

1

-

7851.76

... More
8"x4" 600# Unequal Tee

7

-

54962.29

... More
4"x2" 600# Unequal Tee

2

-

3200.18

... More
Equal TEE: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per te chnical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
12" ANSI 150# Equal Tee

5

-

72101.42

... More
8" 300# Equal Tee

6

-

40310.48

... More
3" 300# Equal Tee-ASTM A420 Gr.WPL6

9

-

5374.25

... More
2" 300# Equal Tee-ASTM A420 Gr.WPL6

3

-

1104.09

... More
1" 300# Equal Tee-ASTM A420 Gr.WPL6

6

-

2164.36

... More
10" ANSI 600# Equal Tee

5

-

65484.16

... More
8" 600# Equal Tee (Crossbar)

1

-

9629.77

... More
8" 600# Equal Tee

11

-

105927.44

... More
4" 600# Equal Tee

6

-

10412.13

... More
2" ANSI 600# Equal Tee

3

-

1451.4

... More
1" ANSI 600# Equal Tee

6

-

2734.65

... More
Elbow-90 deg LR Bends: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply a nd as per technical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
10" 600# 90 deg LR Bend

8

-

87274.78

... More
8" 600# 90 deg LR Bend

22

-

147590.65

... More
6" 600# 90 deg LR Bend

2

-

10629.06

... More
4" 600# 90 deg LR Bend

18

-

42796.48

... More
3" 600# 90 deg LR Bend

4

-

6605.07

... More
2" 600# 90 deg LR Bend

33

-

20831.73

... More
1" 600# 90 deg LR Bend

9

-

3454.9

... More
8" 300# 90 deg LR Bend

8

-

43266.92

... More
3" 300# 90 deg LR Bend

20

-

41848.46

... More
2" 300# 90 deg LR Bend

18

-

22220.86

... More
1" 300# 90 deg LR Bend

62

-

23271.46

... More
12" x 150# 90° LR Bend

20

-

196860.58

... More
4" x 150# 90° LR Bends

10

-

10785.08

... More
Elbow-45 deg LR Bends: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply a nd as per technical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
12" x 150# 45° LR Bends

5

-

32227.22

... More
8" 300# 45 deg LR Bend

8

-

6990.13

... More
10" ANSI 600# 45 deg LR Bends

4

-

26361.81

... More
8" ANSI 600# 45 deg LR Bends

16

-

84349.99

... More
6" ANSI 600# 45 deg LR Bends

8

-

20580.52

... More
4" ANSI 600# 45 deg LR Bends

4

-

4669.87

... More
Concentric Reducer: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical sp ecifications from approved vendors specified in tender document

-

-

-

... More
8"X6" x Concentric Reducer X 300#

4

-

13263.77

... More
8"X4" x Concentric Reducer X 300#

4

-

8842.54

... More
3"X2" x Concentric Reducer X 300#

3

-

1747.56

... More
3"X1" x Concentric Reducer X 300#

3

-

1301.52

... More
10"x8" x Concentric Reducer x 600#

4

-

33561.61

... More
10"x6" x Concentric Reducer X 600#

4

-

25171.19

... More
10"x4" x Concentric Reducer X 600#

4

-

16780.83

... More
8"x6" x Concentric Reducer X 600#

4

-

20136.98

... More
8"x4" x Concentric Reducer X 600#

4

-

13424.62

... More
2"x1" x Concentric Reducerx 600#

10

-

8152.74

... More
Half coupling & Nipple: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per technical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
1" 3000 Class St. NIPPLE

198

-

44639.26

... More
1" 3000 Class HALF COUPLING

66

-

14799.54

... More
Weld-o-let: Supply and delivery of pipe fittings at respective stations as per Station wise Break up of material supply and as per t echnical sp ecifications from approved vendors specified in tender document:

-

-

-

... More
16"x4" X 150# Weld-o-let

6

-

21826.01

... More
14"x4" X 150# Weld-o-let

6

-

19097.73

... More
8"x2" X 300# Weld-o-let

8

-

22705.84

... More
12"x2" X 600# Weld-o-let

10

-

29771.64

... More
10"x2" X 600# Weld-o-let

8

-

23817.31

... More
8"x2" X 600# Weld-o-let

19

-

56566.11

... More
6"x2" X 600# Weld-o-let

4

-

8931.47

... More
SPECTACLE BLINDS: Supply and delivery of following mentioned Spectacle Blinds at respective stations as per Station wise Break up of material supply and as per technical specifications indicated in tender documents.

-

-

-

... More
8" Spectacle Blind 300# F/F

4

-

126305.74

... More
2" Spectacle Blind 300# F/F

3

-

20857.18

... More
12" Spectacle Blind 600# F/F

2

-

133527.45

... More
10" Spectacle Blind 600# F/F

5

-

237460.01

... More
8" Spectacle Blind 600# F/F

13

-

550556.74

... More
6" Spectacle Blind 600# F/F

2

-

61978.08

... More
4" Spectacle Blind 600# F/F

1

-

19626.35

... More
3" Spectacle Blind 600# F/F

3

-

41838.69

... More
2" Spectacle Blind 600# F/F

15

-

131486.22

... More
Supply of ASTM A106 Gr.B /A333 pipes at respective stations as per Station wise Break up of material supply and as per technical sp ecifications from approved vendors specified in tender document.

-

-

-

... More
4.500" ODx 0.237" WT (Sch.STD) ASTM A 106 Gr B Bare Pipe

40

-

142484.53

... More
1.315" ODx 0.179"WT (Sch.XS) ASTM A 106 Gr B Bare pipe

120

-

94324.01

... More
4.50" OD x 0.237" WT ASTM A 333 Gr. 6 PIPE

70

-

249347.92

... More
3.5" OD x 0.216" WT ASTM A 333 Gr. 6 PIPE

230

-

580760.72

... More
2.375" OD x 0.218" WT ASTM A 333 Gr. 6 PIPE

70

-

121048.65

... More
1.315" OD x 0.179" WT ASTM A 333 Gr. 6 PIPE

256

-

201224.55

... More
Flame Arrestor: Supply and delivery of following mentioned Flame Arrestor at respective stations as per Station wise Break up of mat e rial supply and as per technical specifications indicated in tender documents:

-

-

-

... More
4" Flame Arrester

2

-

462497.08

... More
"IS: 3589, Gr. Fe 410 pipes: Supply of IS: 3589, Gr. Fe 410 pipes with internal coating at respective stations as per Station wise B reak up of material supply and as per technical specifications from approved vendors specified in tender document. Cost shall be inclusive of all charges in cluding charges for bare pipe, internal coating, inpsection of materials by approved TPI, Taxes etc. Note: 1) Internal coating shall be carried out at site. 2) The rate for the Fire Water pipe is inclusive of internal coating. No separate payment shall be made for internal coating at site ."

-

-

-

... More
12.75" OD x 0.25" WT IS:3589 FE410 Pipe

200

-

2018571.72

... More
"Supply and delivery of API 6D/BS 5351/ISO 17292 Ball valve for use in process piping at respective stations as per Station wise Bre ak up o f material supply and as per technical specifications from approved vendors specified in tender document."

-

-

-

... More
2"x ANSI 600# HOV F/F A/G API 6D Ball Valve

27

-

1144878.9

... More
2"x ANSI 600# HOV W/W A/G API 6D Ball Valve

14

-

433966.03

... More
3"x ANSI 600# HOV F/F A/G API 6D Ball

3

-

122978.82

... More
3"x ANSI 300# HOV F/F A/G API 6D Ball Valve

2

-

57895.61

... More
2"x ANSI 300# HOV F/F A/G API 6D Ball Valve

7

-

132052.87

... More
1"x ANSI 800# HOV W/W BS 5351/ ISO 17292 Ball valve

86

-

1332896.16

... More
1"x ANSI 600# HOV F/F A/G, BS 5351/ ISO 17292 Ball valve

6

-

103295.22

... More
"API 602 Gate valve (HOV): Supply of Valves at respective stations as per technical specifications from approved vendors in the tender document -FOR FIRE WATER NETWORK:"

-

-

-

... More
16"x ANSI 150# HOV F/F API 600 Gate Valve

1

-

121038.72

... More
14"x ANSI 150# HOV F/F API 600 Gate Valve

1

-

108774.24

... More
12"x ANSI 150# HOV F/F API 600 Gate Valve

11

-

737135.63

... More
4"x ANSI 150# HOV F/F API 600 Gate Valve

10

-

190475.01

... More
1" x 800# W/W, A/G, HOV, API 602 GATE VALVE

2

-

19586.14

... More
Globe Valves (HOV): Supply of Valves at respective stations as per technical specifications from approved vendors in the tender docu ment:

-

-

-

... More
8"x ANSI 600# F/F BS-1873 GLOBE Valve

1

-

120056.49

... More
6"x ANSI 600# F/F BS-1873 GLOBE Valve

2

-

180084.76

... More
4"x ANSI 600# F/F BS-1873 GLOBE Valve

7

-

420197.76

... More
3"x ANSI 600# F/F BS-1873 GLOBE Valve

3

-

135061.73

... More
2"x ANSI 600# F/F BS-1873 GLOBE Valve

16

-

507660.17

... More
8"x ANSI 300# F/F BS-1873 GLOBE Valve

1

-

78668.71

... More
3"x ANSI 300# F/F BS-1873 GLOBE Valve

2

-

59002.15

... More
2"x ANSI 300# F/F BS-1873 GLOBE Valve

3

-

68113.99

... More
1",800#,W/W, A/G BS-1873/ISO 15761 GLOBE Valve

40

-

170708.24

... More
Thermal relief valve: Supply of Valves at respective stations as per technical specifications from approved vendors in the tender do cument:

-

-

-

... More
1" x 1" 600# x300# F/F TRV

25

-

651703.38

... More
1" x 1" 300# x300# F/F TRV

9

-

155524.06

... More
Supply of Fire Fighting Monitor/hydrant:

-

-

-

... More
4" X 150# High Volume Long Range Foam Monitor 750 GPM capacity stand post type

4

-

1622744.21

... More
4" x 150# WNRF Flange Stand Post Type double way fire hydrant fitted with 2 Nos of single landing valve complete as per IS: 5290

6

-

108632.9

... More
"FIRE FIGHTING EQUIPMENT: Supply and delivery of Fire Fighting Equipment at respective stations as per Station wise Break up of mate r ial supply and as per technical specifications from approved vendors specified in tender document."

-

-

-

... More
75 kg DCP Extinguisher

12

-

367247.39

... More
9 kg DCP Extinguisher

27

-

146025.85

... More
4.5 kg CO2 Extinguisher

14

-

128606.55

... More
2.5 kg clean agent extinguishers IS 15683 Marked

2

-

38509.32

... More
Fire Hose Box for keeping 2 Nos. of 15 M Type B delivery hose and one no. jet nozzle

12

-

77140.56

... More
Type B Delivery Hoses of 15 M length bearing IS-636 mark

24

-

228043.4

... More
Jet Nozzles

14

-

75648.88

... More
Fog Nozzle

14

-

112449.66

... More
Universal Nozzle

14

-

95166.76

... More
Foam Branch pipe

14

-

119444.72

... More
Water curtain nozzle

14

-

40417.67

... More
Sand drum with scoop

12

-

36047.68

... More
Pair of Rubber hand gloves for Electrical work bearing IS mark

5

-

7415.47

... More
First Aid Box with Snake serum

5

-

11857.47

... More
Fire Bucket

10

-

5081.79

... More
Safety Helmet

22

-

10080.79

... More
Strecher WITH BLANKET

4

-

26254.58

... More
Explosimeter

5

-

239714.52

... More
Rescuscitor

5

-

32580.63

... More
Electrical Siren

2

-

88556.83

... More
Hand Operated siren

2

-

39423.33

... More
Water gel blanket

5

-

84336.67

... More
Positive Pressure type self containing Breathing Apparatus

4

-

26064.5

... More
Safety Torch

5

-

25555.08

... More
Fire Proximity suit

4

-

26064.5

... More
Wind socks

5

-

21369.03

... More
PA system/ Loudhailer/ megaphone

2

-

65156.32

... More
Red & Green flag (Pairs) 2 nos in each colour

6

-

11282.26

... More
Extinguisher box for 9 kg DCP Extinguishers

27

-

166031.38

... More
Dry Chemical Powder silliconised potassiun bicarbonate type IS marked, pack in 10Kg

12

-

5045.21

... More
CO2 cartridge - 200 gm capacity for 9 kg

5

-

4009.35

... More
CO2 cartridge - 3.2 kg capacity for 75 kg DCP extinguisher

3

-

19051.15

... More
Low temparature rubber hand gloves

10

-

133624.97

... More
Low temparature protective clothing

4

-

2541952.22

... More
Emergency Kit: Supply and delivery of Emergency Kit consisting oflisted emergency equipments as per Annexure-VII

2

-

2525439.52

... More
PVC/Chemical protective clothing

5

-

14424.97

... More
Corrosion Coupon: Supply of TOR Fitting Complete With Plug & Cap and Full bore Threaded Ball Valve:

-

-

-

... More
TOR fitting complete with Caps, Plugs, O-Rings, Nipple & 2" 600# full bore threaded ball valve.

3

-

75531.92

... More
RETRACTABLE CORROSION COUPON HOLDER, 4" to 30" pipe dia

3

-

8660.93

... More
BI-DI CLEANING PIG ASSEMBLY 12IN

7

-

202685.86

... More
GUIDE DISC FOR 12 INCH BI DI PIG

4

-

4484

... More
SEALING DISC FOR 12 INCH BI DI PIG

12

-

15300.02

... More
BI-DI CLEANING PIG ASSEMBLY 8IN

7

-

76984.44

... More
GUIDE DISC FOR 8 INCH BI DI PIG

4

-

2811.28

... More
SEALING DISC FOR 8 INCH BI DI PIG

12

-

7149.38

... More
CSW Mechanical-Services

-

-

-

... More
Scrapper Launching/ Receiving Barrel along with all accessories, JIB Crane, PIG handling tray, etc as applicable. Taking delivery of equipments, shifting/transporting within station premises, placing on pre-constructed foundations, assembling together all sub-asse mblies, levelling, alignment, grouting, cleaning and flushing by water, draining, checking, testing, dressing and making good of the foundation and completing the work in all respects in accordance with the relevant drawings, manufacturer's installation instructio n, specifications and instructions of Site Engineer / EIC., Note: Weight of equipment is indicative only, Payment shall be done base d on actual weight of equipment

-

-

-

... More
12"/8" x 600# Scrapper Barrel

9

-

445453.03

... More
Single Basket Type Strainers along with all accessories, JIB Crane, etc as applicable. Taking delivery of equipments, shifting/trans porting within station premises, placing on pre-constructed foundations, assembling together all sub-assemblies, levelling, alignmen t, grouting, cleaning and flushing by water, draining, checking, testing, dressing and making good of the foundation and completing the work in all respects in accordance with the relevant drawings, manufacturer's installation instruction, specifications and instr uctions of Site Engineer / EIC., Note: Weight of equipment is indicative only, Payment shall be done based on actual weight of equip ment

-

-

-

... More
Single Basket Type Strainer - 8" x 600#

4

-

197979.13

... More
Insulating Coupling Erection: Taking delivery,shifting/transporting within station premises and installation of Insulating Couplings of the following sizes and pressure class, at elevations specified in the drawing, checking resistance value by meggar test before and after erection levelling, aligning and checking, making welded connections to the piping, coating & wrapping and completing the work in all respects in accordance with the relevant drawings, manufacturer's installation instructions, specifications and instruct ions of Site Engineer / EIC.

-

-

-

... More
12" x 150#/300#/600#/900# Insulating Coupling

2

-

36489.31

... More
8" x 150#/300#/600#/900# Insulating Coupling

4

-

48654.04

... More
4" x 150#/300#/600#/900# Insulating Coupling

12

-

72973.56

... More
Above ground process piping: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both fro m outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping includi ng cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment no zzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by wat er after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, fina l cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumable s necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.

-

-

-

... More
12 NPS (12.75" OD x 0.250"/ 0.281"/ 0.375"/ 0.438" WT) APL 5L Pipe

88

-

680137.46

... More
10 NPS (10.75" OD x 0.250"/ 0.280"/ 0.365"/ 0.438" WT) APL 5L Pipe

58

-

390092.26

... More
8 NPS (8.625" OD x 0.250"/ 0.277"/ 0.312"/ 0.322"/ 0.375"/ 0.438" WT) API 5L/ ASTM A106/ A333 Pipe

160

-

839066.85

... More
6 NPS (6.625" OD x 0.250"/ 0.280" WT) API 5L/ ASTM A106/ A333/ A53 Pipe

20

-

88593.69

... More
4 NPS 4.5" OD x 0.237"/0.337" WT ASTM A106/ A333/ A53 Pipe

56

-

202451.28

... More
3 NPS (3.5" OD x 0.216"/ 0.438" WT) ASTM A106/ A333/ A53 Pipe

184

-

430516.39

... More
2 NPS (2.375" OD x 0.218"/ 0.344" WT) ASTM A106/ A333/ A53 Pipe

56

-

84996.06

... More
1 NPS (1.315" OD x 0.179"/ 0.250" WT) ASTM A106/ A333/ A53 Pipe

205

-

220235.44

... More
"Under ground piping for Process piping (with PU/3LPE Coating): Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and e rection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, el bows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pes sure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment n ozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equi pment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning b y compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consuma ble necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and comp leting the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated. Note: 1. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. 2. Payment for external PU/ epoxy coating shall be done separately as per relevant SOR item .

-

-

-

... More
12 NPS (12.75" OD x 0.250"/ 0.281"/ 0.375"/ 0.438" WT) APL 5L Pipe

22

-

183610.67

... More
10 NPS (10.75" OD x 0.250"/ 0.280"/ 0.365"/ 0.438" WT) APL 5L Pipe

15

-

111285.56

... More
8 NPS (8.625" OD x 0.250"/ 0.277"/ 0.312"/ 0.322"/ 0.375"/ 0.438" WT) API 5L/ ASTM A106/ A333 Pipe

40

-

238098.51

... More
6 NPS (6.625" OD x 0.250"/ 0.280" WT) API 5L/ ASTM A106/ A333/ A53 Pipe

6

-

29366.35

... More
4 NPS 4.5" OD x 0.237"/0.337" WT ASTM A106/ A333/ A53 Pipe

14

-

53690.83

... More
3 NPS (3.5" OD x 0.216"/ 0.438" WT) ASTM A106/ A333/ A53 Pipe

46

-

144003.21

... More
2 NPS (2.375" OD x 0.218"/ 0.344" WT) ASTM A106/ A333/ A53 Pipe

14

-

27370.17

... More
1 NPS (1.315" OD x 0.179"/ 0.250" WT) ASTM A106/ A333/ A53 Pipe

52

-

93475.82

... More
Above ground internal epoxy coated pipe for Fire Water Services: (with internal epoxy coating at welding joints, fittings and flange s): Taking delivery of internal epoxy coated pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from des ignated location within station premises, transporting the same to site, fabrication and erection of above ground piping including c utting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzl es, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final c leaning-up and disposal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract).The scope shall also include cleaning of internal surface of pipes conforming to SSPC SP-10 at all location where coating has been distroyed due to welding and repairing the internal surface by application of 2-pack cold cured Isophthalic polyster acrylic co-polymer glass flake filled /Liqui d epoxy / Equivalent with coating of thickness 700-1000 Microns. Internal coating shall be done at the inner surface of pipe ends, F langes, pipe fittings, valves, etc so that the internal surface of piping is not directly exposed to water, and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mention ed in the item are for reference only and may vary. Payment shall be based on OD.

-

-

-

... More
12.75" ODx 0.250" WT IS3589 Pipe

160

-

835868.58

... More
4.5" ODx 0.237" WT ASTM A106/ ASTM A53/ API 5LGr B Pipe

32

-

67676.87

... More
Under ground piping for Fire Water Piping (with external PU/3LPE Coating and internal epoxy coating at welding joints, fittings and flanges): Taking delivery of internal coated Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from des ignated location within station premises, transporting the same to site, fabrication and erection of underground piping including cu tting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, conc entric/ eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, therm owells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instrume nts etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying 100% solve nt free elastomeric plyurethane (PU)/ liquid epoxy on external surface, with approved materials, Equipment etc, holiday detection of the coating, cleaning of internal surface of pipes conforming to SSPC SP-10 at all location where internal coating has been distroy ed due to welding and repairing the internal surface by application of 2-pack cold cured Isophthalic polyster acrylic co-polymer gla ss flake filled /Liquid epoxy / Equivalent with coating of thickness 700-1000 Microns. Internal coating shall also be done at the in ner surface of pipe ends, Flanges, pipe fittings, valves, etc so that the internal surface of piping is not directly exposed to wate r; cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified p ressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, provid ing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically under taken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, speci fications and instructions of the Site Engineer / EIC. Note: 1. In case of 3LPE coated pipes, weld joints shall be PU coated.Thickne ss and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. 2. Payment for external PU/ ep oxy coating shall be done separately as per relevant SOR item.

-

-

-

... More
12.75" ODx 0.250" WT IS3589 Pipe

40

-

371163.81

... More
4.5" ODx 0.237" WT ASTM A106/ ASTM A53/ API 5LGr B Pipe

8

-

29421.27

... More
Installation of Swing Check Valve: Taking delivery of valves of all types and pressure rating from the designated location within st ation premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth wo rk in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above ground v alves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground portions (if applicable) i ncluding all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) and comp leting the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and ins tructions of the Site Engineer / EIC.

-

-

-

... More
10", 600#/900#, F/F

1

-

17452.65

... More
8", 150#/300#, F/F

1

-

12693.18

... More
8", 600#/900#, F/F

1

-

13962.37

... More
Installation of BALL/GATE Valves MOV/HOV: Taking delivery of valves of all types and pressure rating from the designated location wi thin station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including e arth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and painting of above g round valves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground portions (if applic able) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied by the owner) a nd completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and specifications and instructions of the Site Engineer / EIC.

-

-

-

... More
16", 150#/300#, F/F

1

-

30463.13

... More
14", 150#/300#, F/F

1

-

26655.55

... More
12", 150#/300#, F/F

11

-

251327.72

... More
12", 600#/900#, F/F

4

-

100531.09

... More
12", 600#/900#, W/W

3

-

90478.72

... More
10", 600#/900#, F/F

7

-

146609.3

... More
8", 150#/300#, F/F

8

-

121852.56

... More
8", 600#/900#, F/F

20

-

335111.98

... More
8", 600#/900#, W/W

3

-

60317.88

... More
6", 600#/900#, F/F

2

-

25131.52

... More
4", 150#/300#, F/F

10

-

76164.04

... More
4", 600#/900#, F/F

7

-

58640.22

... More
4", 600#/900#, W/W

12

-

120643.34

... More
3", 150#/300#, F/F

2

-

11422.73

... More
3", 600#/900#, F/F

3

-

22620.6

... More
2", 150#/300#, F/F

7

-

26653.04

... More
2", 600#/900#, F/F

27

-

113091.85

... More
2", 600#/900#, W/W

14

-

70375.2

... More
1", 600#/900#, F/F

6

-

12569.48

... More
1", 600#/800#/900#/1500#, W/W

88

-

221179.2

... More
Installation of GLOBE VALVE/CONTROL VALVE/MOTORIZED GLOBE VALVE/ROV/PLUG VALVE: Taking delivery of valves of all types and pressure rating from the designated location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or underground including earth work in excavation and filling for under ground valves at elevations specified in the dra wings, priming and painting of above ground valves, PU Painting of under ground portions (if applicable) or flood coating and wrappi ng of under ground portions (if applicable) including all inputs, labour, material and consumable (other than those specifically und ertaken to be supplied by the owner) and completing the work in all respects in accordance with the drawings, manufacturer's install ation instructions and specifications and instructions of the Site Engineer / EIC.

-

-

-

... More
8", 150#/300#, F/F

3

-

41887.12

... More
8", 600#/900#, F/F

2

-

33788.52

... More
6", 600#/900#, F/F

2

-

25341.4

... More
4", 600#/900#, F/F

7

-

59129.87

... More
3", 150#/300#, F/F

2

-

10470.85

... More
3", 600#/900#, F/F

3

-

19007.92

... More
2", 150#/300#, F/F

3

-

10470.82

... More
2", 600#/900#, F/F

16

-

67577

... More
1", 800#/150#, W/W

40

-

84496.5

... More
Installation of Valves: THERMAL/PRESSURE RELIEF VALVE: Taking delivery of valves of all types and pressure rating from the designat ed location within station premises, transporting the same to site, erecting above ground on preconstructed foundations or undergrou nd including earth work in excavation and filling for under ground valves at elevations specified in the drawings, priming and paint ing of above ground valves, PU Painting of under ground portions (if applicable) or flood coating and wrapping of under ground porti ons (if applicable) including all inputs, labour, material and consumable (other than those specifically undertaken to be supplied b y the owner) and completing the work in all respects in accordance with the drawings, manufacturer's installation instructions and s pecifications and instructions of the Site Engineer / EIC.

-

-

-

... More
1" X 1" F/F Thermal Relief Valve 150#/300#/600#/900#

34

-

84733.44

... More
Monitor and Hydrant Taking delivery of hydrants and monitors rom thedesignated location, transporting the same to site, erecting over fire water line as per AFC drawings including all inputs, labour, material and consumable and completing the work in all r espects in accordance with the drawings ,manufacturer's installation instructions and specifications andinstructions of the Si te Engineer /EIC.

-

-

-

... More
Manual High Volume Long Range Foam Monitor 750 GPM capacity stand post type with inlet flange of 4" X 150# MHVLR

4

-

21816.12

... More
Stand Post Type double way fire hydrant fitted with 2 Nos of single landing valve complete as per IS: 5290 alongwith 4" x 150# WNRF Flange

6

-

40669.15

... More
Radiographic Inspection: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engi neer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inp uts, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on th e basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspe ction as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branc h pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost . v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all film s shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.

-

-

-

... More
12" NB Pipe Joints RT

45

-

146550.69

... More
10" NB Pipe Joints RT

60

-

166244.06

... More
8" NB Pipe Joints RT

283

-

571297.87

... More
6" NB Pipe Joints RT

51

-

90149.04

... More
4" NB Pipe Joints RT

133

-

201699.29

... More
3" NB Pipe Joints RT

200

-

203370.64

... More
2" NB Pipe Joints RT

150

-

122360.1

... More
1" NB Pipe Joints RT

800

-

499678.08

... More
Single Cut Joint: Cutting (Hot/ Cold cutting) of portion of existing piping, trimming, grinding, bevelling the edges, aligning with/ without addition of spool piece, welding the joint including supply of all inputs such as labour, materials, equipment, consumables etc. necessary to perform and complete the work in all respect as per specification and instruction of the Site Engineer / EIC. Not e: The job also include evacuation of product from the piping section after isolating the section and flushing with water and its di sposal.

-

-

-

... More
16" NB - Single Cut Joint

2

-

41351.21

... More
14" NB - Single Cut Joint

2

-

38293.15

... More
12" NB - Single Cut Joint

2

-

31869.72

... More
Dismantling of Piping Aboveground and equipments: Dismantling of existing over ground piping works of all types and sizes by opening flange joints or by gas cutting/ cold cutting or any other approved suitable means without damaging other portions of work. The job includes evacuation of the contents of the piping, cutting the pipes to required sizes as directed, taking out valves, flanges, tee s, bends, gaskets nuts, bolts etc. attached supports alongwith any instruments such as pressure gauge, temperature gauge etc. handli ng, transporting and storing at owner's designated store in safe manner to avoid damage including supply of all labour, materials, e quipments, consumables etc. necessary to perform and complete the work in all respects as per drawings, instructions of the Site Eng ineer / EIC (payment shall be made on linear measurement of dismantled piping including bends tees etc.). Note : The contractor shal l indicate the piping system to be dismantled and shall take specific approval from the Site engineer before dismantling of pipe. Ce rtain redundant pipes which in the opinion of the Owner need not be retrieived, those items shall not be dismantelled.

2

-

45378.65

... More
Dismantling of Piping Underground and equipments: Dismantling the existing under ground piping, locating, retrieving including excav ating the proper trenches by cutting the pipes without damaging other portions of work. The job includes evacuation of the contents of the piping, cutting the pipes to required sizes as directed, taking out valves, flanges, tees, bends, gaskets, nuts, bolts etc., handling, transporting and storing at owner's designated store in safe manner to avoid damage including supply of all labour, materi als, equipment consumables etc. necessary to perform and complete the work in all respects as per drawing, instructions of the Site Engineer / EIC. (Payment shall be made on the linear measurement of dismantled piping including bend, tees, reducers etc.). Note : T he contractor shall indicate the piping system to be dismantled and shall take specific approval from the Site engineer before disma ntling of pipe.Certain redundant pipes which in the opinion of the Owner need not be retrieived, those items shall not be dismantled .

2

-

67294.72

... More
Development of as built drawings, data sheets, system details covering all additional facilities incorporated under this project in the station and furnishing them as reference document. Additionally, electronic copy of the documents shall also be furnished in USB drives to EIC/ Site Engineer.

3

-

1027071.88

... More
FW Network Analysis: Model Building and Flow Analysis by using Pipenet/Sprink/Flowmaster Software, suggesting the requirement of ori fice plate for flow and pressure control, preparation of reports, schematic drawings, recommendations and suggesting the pipe sizes in the fire water netwrok so that the fire fighting system meets the requirement of OISD 117, latest Edition. Completing the work in all respect as per the defined scope of work and instructions of Site Engineer/EIC.Soft copy of Model in software to be provided in USB drive to EIC/ Site Engineer.

1

-

338828.29

... More
Flexibility and piping stress analysis as per specification: Carrying out stress and flexibility analysis of process, utility and fi rewater piping including creation of model in CAESAR-II (latest edition) software from isometric/ assembly piping drawings/ site mea surements, analysis as per relevant codes/ standards, interpretation, recommendations of suitable mitigation measures and design cha nges, if required as per specification and instructions of EIC/ Site Engineer. Soft copy of Model in software (CARSAR-II) to be prov ided in USB drive to EIC/ Site Engineer.

2

-

470713.19

... More
Temporary Barricading: Providing Temporary Barricading made of GI/ steel sheet with angle iron frame (40x40x6) in panels of 1.5 to 2 .0m including lateral/ vertical angle bracing/ steel beam at bottom for stability, earth filling up to 300mm height above ground lev el, maintaining the barricading during construction at site, removing the same and clearing site after construction complete in all respects as per instructions of Site Engineer

1300

-

3650674.56

... More
CSW Mechanical-Composite

-

-

-

... More
Supply and Erection of Electroforged Grating: Supplying at site, steel structural items such as steel plates, bars, fabrication of g ratings by electroforged method, after complete fabrication entire gratings shall be Hot Dip galvanized, gratings shall be normany of size 810mm X 250mm for steps and 1200mm X 1000 mm or 810mm X 1000 mm for platforms / walkways, or any size as advised by EIC. Pla cing gratings in a replaceable mannerbolting with base frame of ISA by suitable GI clamps and GI fasteners, including supply of all other inputs such as labour, materials, consumable etc. necessary to perform and complete the work in all respect, in accordance wit h drawings, specifications and instructions of the Site Engineer / EIC.

8

-

1940602.8

... More
Supply and Erection of GI Structural: Supplying at site, GI structural items such as flat, bars, chequered plates, angles, beams cha nnels, commercial quality pipes,bolts & nuts, washers, grouting bolts, fabrication and erection of various structures items includin g supply of all other inputs such as labour, materials, consumable etc. necessary to perform and complete the work in all respect, i n accordance with drawings, specifications and instructions of the Site Engineer / EIC.

3000

-

771755.4

... More
Painting: Surface preparation of piping, equipment and valves etc. by abrasive blast cleaning or with power wire brush (wherever bla st cleaning is not possible) confirming to SA 2.5, making the surface free of dust, grease, mill scales etc., application of 1 coat x 50-75 microns DFT of Inorganic Zinc Ethyl Slicate Primer, followed by application of sealer coat of 30 micron DFT and intermediat e coat of 150 micron DFT with surface tolerant epoxy mastic paint and 2 coats x 50 micron each DFT of Isocynate Aliphatic Poly Ureth ene (PU) by airless spray, with approved materials, paints, tools, tackles, consulambles, non-consumables, labour, equipment etc. to complete the job in all respects as per specification and instructions of the Site Engineer / EIC. The total DFT shall be minimum 3 30 microns.

650

-

1144893.23

... More
Cleaning exposed steel surfaces of piping, equipment and valves etc. by abrasive blasting or with power wire brush (wherever sand bl ast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials, labour, equipment etc. and completing the job in all re spects as per specification and instructions of the Site Engineer / EIC.

200

-

607558.4

... More
Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpowe r, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instr uction of EIC/ Site Engineer to complete work in all respects.

40

-

80548.22

... More
Reflective radium sticker printing (background sticker) and apply including pasting and fixing with supply of all manpower, equipmen ts, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height etc. as per instruction of E IC/ Site Engineer to complete work in all respects.

40

-

78431.3

... More
Copper Strips/ Flats for Jumpers for Flanged Joits of the Product Process Piping: Supply and Installation of one copper jumper per flanged joint across the flanged joints for valves, spool piece, branch offs etc., of product process piping, The job includes cutt ing drilling of holes of required size in the copper strips/ flats for bolting purpose and complete the works in all respects as pe r specifications & drawings and instructions of Site Engineer/ EIC. Note:- Copper jumpers shall be installed in all the flanged jo in ts of Product Process piping only and not in fire water lines.

-

-

-

... More
Up to 30 mm wide x 3 mm thick Copper strip

80

-

66467.04

... More
30 - 50 mm wide x 3 mm thick Copper strip

120

-

162180.14

... More
"""Medium Velocity Water Sprinkler System: Design, Detailed Engineering, supply, fabrication, erection/Installation and commissionin g of complete medium velocity water sprinkl er systems for Pump Shed, barrel area, filteration, metering and piping area at each loc ation as per the details mentioned below: Design, detail engineering, drawing and development of scheme for automatic medium velocit y water sprinkler system for the equipment andpiping area including supply of all material like Deluge valve(Wet Type), Spray nozzle s, pressure switch, pressuer gauge, piping,valves, flanges, coupling, pipe fittings, brackets, clamps, fasteners, solenoid switches, S.S piping, strainers, alongwith all accessories as per the approved scheme at site, erection and installation of piping,cabling, e quipments and instruments control panel etc, including dismantling, breaking of road etc. as required for setting out of the system and making good the same, hooking up the system with the hydrant network,sand blast cleaning, priming and painting (Zinc Ethyl Slica te Primer,High Build EPOXY MIO, Isocynate Aliphatic PolyUrethene (PU) in signal red colour); internal coating with liquid epoxy, Car rying out all electrical and instrumentation works to enable auto actuation of the deluge valve and medium velocity water sprinkler system based on alarm signal from QB sensors/ gas detectors/ flame detectors. Carrying out the electronic integration of the system with the control panel and providing alarm and automatic actuation of the deluge valves with manual over-ride provision, testing & c ommissioning of the system including cost of all labour, services, materials tools & tackles consumables, first operation & funrnish ing of operation and maintenance manuals on lumpsum basis as per specifications, International standard procedures, approved scheme, drawings and the direction of Site Engineer /EIC. Note: 1. The control panel and control console with PC will be installed under the work of Gas detection system and the MV system is to be integrated with the exisitng system. 2. For System Designing/Area Calculation & inter distances between block facilities refer the General layout plan and Assembly Pipin g Areaof respective Station."

-

-

-

... More
Medium Velocity Water Sprinkler System for Station consisting of Barrel area, filteration, metering and piping area etc

2

-

5727764.84

... More
Inst. Works-Kerala-Supply

-

-

-

... More
Supply of Pressure Indicators (PI) of the following ranges as per the technical specifications attached in the Tender.

-

-

-

... More
0 to 100 Kg / Cm2

4

-

21026.28

... More
Supply of flame proof and weather proof fittings including EP/WP certificates as per the technical specifications attached.

-

-

-

... More
FLP/ WP Junction Box, Type C. (Nos. of terminals: 60 Nos.; Bottom entry: 1 No. - 1 1/4" & 1 No.- 1"; Left side entry: 1 No. - 1" & 3 Nos.- 1/2"; Right side entry: 2 No. - 1" & 2 Nos.- 1/2") along with FLP cable glands & FLP plugs for all the cable entries of the Junction as per technical specifications.

3

-

21921.56

... More
FLP/ WP Junction Box, Type D. (Nos. of terminals: 24 Nos.; Bottom entry: 1 No. - 1"; Left side entry: 3 Nos.- 1/2"; Right side entry: 3 Nos.- 1/2") along with FLP cable glands & FLP plugs for all the cable entries of the Junction as per technical specifications.

5

-

20734.96

... More
FLP/ WP Emergency Shut Down Push Button Switch (with 2 nos. cable entry provision of 1/2" NPT) with steel hammer chained with main unit.

1

-

2535.7

... More
Supply of Cable Glands - flame proof and weather proof including EP/WP certificates:

-

-

-

... More
1 1/4" (5/4")

5

-

2208.19

5

-

1392.99

5

-

567.23

... More
Supply of Plugs - flame proof and weather proof including EP/WP certificates:

-

-

-

5

-

404.8

5

-

390.76

5

-

192.22

... More
Supply of Reducers - flame proof and weather proof including EP/WP certificates:

-

-

-

... More
1" to 1/2" Reducers

5

-

1341.72

... More
1" to 3/4" Reducers

5

-

1559.31

... More
3/4" to 1/2" Reducers

5

-

1143.83

... More
SCRAPPER DETECTOR

-

-

-

... More
Supply of 12IN, 600 # Series -Short Neck Scrapper Detector Switch- As per Tender Specification

1

-

83943.84

... More
Supply of Jacking Bracket for 600# Scrapper Detector

1

-

52115.55

... More
INSTRUMENT FITTINGS

-

-

-

... More
CS Bushing 1" Butt Welded x 1/2" FNPT as per tender specifications

10

-

1191.33

... More
SS Connector 1/2" MNPT x 1/2" OD Tube as per tender specifications

60

-

11560.22

... More
SS Connector 1/2" FNPT x 1/2" OD Tube as per tender specifications

5

-

1095.69

... More
SS Union Tee 3 x 1/2" OD tube as per tender specifications

5

-

2353.04

... More
1/2" OD SS Tube End cap as per tender specifications

15

-

1760.97

... More
SS Two valve manifold 3 x 1/2" FNPT as per tender specifications

15

-

23336.92

... More
SS TUBE 1/2" OD (M) as per tender specifications

35

-

13517.9

... More
Inst. Works-Kerala-Services

-

-

-

... More
As built documentation for all stations including SV locations covering a) Control /signalling cable layout drawings, b) Cable trench details, c) Cable marker details, d) Earth grid layout, e) Field instrument termination details, f) Cable schedule, g) Junction box wiring details, h) Earth resistivity measurement data, i) Field panel termination details, j) Calibration data of all instruments tested as per scope, k) OTDR Traces of the laid OFC.

1

-

148848.39

... More
Inst. Works-Kerala-Composite

-

-

-

... More
INSTALLATION OF PI

-

-

-

... More
Installation, testing and commissioning of Pressure Indicator (PI) of various ratings as per drawings, recoomendations of OEM and directions of Engineer in-charge/ Site engineer

2

-

8687.3

... More
Taking delivery, shifting within a road distance of 500 meters and installation & testing of the different instruments (like Pressure Gauge, Pressure Switch, Pressure Transmitter, Temperature Transmitter, scrapper detector, level switch, level transmitter, flow switch etc.) of various ratings by fabrication and installing all the required pipe fittings with pressure pipes, valves, plugs, tees, nipples, junction box, cables, supply and erection of all other required materials such as the supporting structure clamps, cannopy, screws, nuts, bolts, aluminium sheets, GI wire, steel plats, cement concrete etc. complete in all respects including supply of suitable size non flame proof cable gland at control panel end and terminating the already laid cables at field, junction box and control panel end, mounting the junction boxes as per the Drawings, specifications and directions of the engineer in-charge/site engineer including cost of all labour, materials, consumables, tools, tackles and services rendered etc. All the instruments shall have to be properly connected to the earth pit through GI wires. The works shall include labelling, tagging using SS plates, glanding and ferruling at both field and panel side. Installation to be done as per OEMs recommendations, vendor drawings and other approved drawings. The scope also shall include Calibration of instruments, hydro-testing of Impulse tube, providing assistance in testing and commissioning of the instruments to control system vendor along with loop checking etc.

-

-

-

... More
INSTALLATION OF PI+PS/PT

-

-

-

... More
Installation, assistance in testing and commissioning of Pressure gauges and Pressure switches (PI+PS) / Pressure Gauge and Pressure Transmitter (PI+PT) of various ratings as per the directions of Engineer-in-charge/ Site engineer and drawings.

4

-

37258.12

... More
INSTALLATION OF PT / PS

-

-

-

... More
Installation, assistance in testing and commissioning of Pressure Transmitter (PT) / Pressure Switch (PS) of various ratings as per the directions of Engineer in-charge/ Site engineer and drawings.

4

-

43102.47

... More
INSTALLATION OF TEMPERATURE TRANSMITTER WITH THERMOWELL

-

-

-

... More
Installation and assistance in testing & commissioning of temperature elements/temperature transmitter(TT) by making necessary holes on the pipes, welding the socket for thermowell on the pipe including supply of boss, silicon paste etc as per the directions of engineer in-charge/site engineer and drawings.

1

-

9458.23

... More
INSTALLATION OF SUB SOIL TEMPERATURE TRANSMITTER

-

-

-

... More
Installation and assistance in testing & commissioning of Sub Soil temperature elements/temperature transmitter(TT) as per the directions of engineer in-charge/site engineer and drawings.

1

-

10732.76

... More
INSTALLATION OF SURFACE MOUNTED TEMPERATURE TRANSMITTER

-

-

-

... More
Installation and assistance in testing & commissioning of Surface Mounted temperature elements/temperature transmitter (TT) by by welding the weld pad on the surface of the pipe, silicon paste as per the directions of engineer in-charge/site engineer and drawings.

1

-

14419.85

... More
INSTALLATION OF EMERGENCY SHUTDOWN SWITCH

-

-

-

... More
Installation and testing of emergency shut - down (ESD) Push button. This includes mounting of termination box as per the drawings, specification and instruction of Engineer in-charge/ Site engineer, replacement of broken glass covers and painting it in red colour.

1

-

12276.51

... More
INSTALLATION & TESTING OF SCRAPPER DETECTOR

-

-

-

... More
Installation, assistance in testing and commissioning of Scrapper Detector of various ratings aas per OEM recommandations, vendor drawings, directions of engineer in-charge/site engineer and other approved drawings.

1

-

7069.63

... More
INSTALLATION OF FLOW METER

-

-

-

... More
Taking delivery, shifting to installation site within the station premises, erecting and installing of the flow meter along with reducers and flow meter electronics/ flow transmitter. Providing assistance to control system vendor/meter supplier in testing and commissioning of the turbine/ ultrasonic / coriolis mass flow meter / clamp on ultrasonic etc.. Making structural supports and fittings, clamps, screws, nuts, bolts, making the cable supports and terminating cables at panel and field ends. Mounting the junction boxes as per Drawings,manufacturer's instructions, specification and direction/instruction of engineer in-charge/site engineer. Job shall include termination of cables at both fiels ends and control panel ends, supply of suitable size non-flame proof cable glands at control panel and the cost of all labour, tools, materials, etc. including labelling, tagging using SS plates painting, glanding, ferruling complete in all respect.

1

-

24944.53

... More
INSTALLATION OF JUNCTION BOXES/ PUSH BUTTON STATION FOR MOV/ROSOV

-

-

-

... More
Installation of explosion proof/flame proof junction boxes, non-flame proof junction box for marshalling of control cables, terminating the cables at field and control panel end, mounting the junction boxes, connecting to earthing grid by supplying and installing all the required materials such as supporting structure, cement concrete, painting, GI wire etc. (excluding supply of the Junction Boxes) in all respects complete as per specifications, drawings and direction of site Engineer including supply of suitable size non-flame proof cable glands at Control Panel end and the cost of labour, tools, materials, glanding, ferruling etc. complete in all respects.

8

-

51349.82

... More
INSTRUMENTATION JOBS FOR MOV/ROSOV/ROV

-

-

-

... More
Carrying out the instrumentation and control system jobs on the already erected actuator assembly of motor operated valves (MOV), Remote Operated Shut off valve (ROSOV) & Remote Operated Valves (ROV) by making the necessary cable connection at field and control panel end (excluding the supply of cables) calibrating the control components, adjusting the limit switches, testing the whole assembly as per drawings specifications and direction of the engineer in-charge/site engineer complete in all respect, including supply of suitable size non-flame-proof cable glands, ferruls, drilling/cutting of plate for fixing glands at Control Panel end and the cost of all labour, tools, glanding, ferruling, consumables etc.

10

-

70161.62

... More
INSTALLATION OF INFRARED HYDROCARBON DETECTORS (POINT TYPE / OPEN PATH TYPE)

-

-

-

... More
Terminating the cables at field and control panel / RTU end, connecting to earthing grid by supplying and installing all the required materials such as supporting structure, canopy, cement concrete, painting, GI wire etc.(excluding supply of the Hydrocarbon detector) complete in all respectsas per specifications.

2

-

10306.12

... More
INSTALLATION OF MANUAL CALL POINT (EX-PROOF & WEATHER PROOF)/ HAZARDOUS AREA HOOTER/ HAZARDOUS AREA BEACON

-

-

-

... More
Installation of Manual Call Point (Explosion Proof & Weather Proof)/ Hooter / Beacon in Hazardous area, terminating the cables at field and control panel end, connecting to earthing grid by supplying and installing all the required material such as supporting structure, cement concrete, painting, GI wire etc. (excluding supply of the Manual Call Point/ Hooter/ Beacon) complete in all respects as per specifications.

1

-

3557.22

... More
INSTALLATION OF CONTROL PANEL/ CONSOLE DESK/ UPS/ RIO/ RTU/ PLC/ ACDB

-

-

-

... More
Taking delivery, shifting the panels to installation site and erection, installation, testing of Control panels/ RTU panel, mounted with all the instruments, power supply units, UPS & battery banks logic control systems , barriers, providing assistance to control system vendor for commissioning of control system including panels, control desk etc. installation on already made foundations or fixing on walls, or steel structure or fixtures aligning, levelling, grouting, inter-wiring outgoing, incoming cable terminations as required, earthing, testing, complete in all respects as per drawings, specifications and directions of the engineer in-charge/site engineer, including supply of suitable size non-flame proof cable glands for all incoming/outgoing cables and the cost of the materials, tools, labour, glanding, ferruling etc. complete in all respects.The indicated quantity is cumulative weight of panels.

500

-

20880.1

... More
Inst. Works-Tamil Nadu-Supply

-

-

-

... More
Supply of Pressure Indicators (PI) of the following ranges as per the technical specifications attached in the Tender.

-

-

-

... More
0 to 20 Kg / Cm2

4

-

22710.47

... More
0 to 100 Kg / Cm2

11

-

57822.27

... More
Supply of flame proof and weather proof fittings including EP/WP certificates as per the technical specifications attached.

-

-

-

... More
FLP/ WP Junction Box, Type C. (Nos. of terminals: 60 Nos.; Bottom entry: 1 No. - 1 1/4" & 1 No.- 1"; Left side entry: 1 No. - 1" & 3 Nos.- 1/2"; Right side entry: 2 No. - 1" & 2 Nos.- 1/2") along with FLP cable glands & FLP plugs for all the cable entries of the Junction as per technical specifications.

14

-

102300.6

... More
FLP/ WP Junction Box, Type D. (Nos. of terminals: 24 Nos.; Bottom entry: 1 No. - 1"; Left side entry: 3 Nos.- 1/2"; Right side entry: 3 Nos.- 1/2") along with FLP cable glands & FLP plugs for all the cable entries of the Junction as per technical specifications.

20

-

82939.84

... More
FLP/ WP Emergency Shut Down Push Button Switch (with 2 nos. cable entry provision of 1/2" NPT) with steel hammer chained with main unit.

8

-

20285.62

... More
Supply of Cable Glands - flame proof and weather proof including EP/WP certificates:

-

-

-

... More
1 1/4" (5/4")

20

-

8832.77

20

-

5571.96

20

-

2268.9

... More
Supply of Plugs - flame proof and weather proof including EP/WP certificates:

-

-

-

20

-

1619.2

20

-

1563.03

20

-

768.89

... More
Supply of Reducers - flame proof and weather proof including EP/WP certificates:

-

-

-

... More
1" to 1/2" Reducers

20

-

5366.88

... More
1" to 3/4" Reducers

20

-

6237.24

... More
3/4" to 1/2" Reducers

20

-

4575.33

... More
SCRAPPER DETECTOR

-

-

-

... More
Supply of 12IN, 600 # Series -Short Neck Scrapper Detector Switch- As per Tender Specification

1

-

83943.84

... More
Supply of 8IN, 600 # Series -Short Neck Scrapper Detector Switch- As per Tender Specification

1

-

95620.83

... More
Supply of Jacking Bracket for 600# Scrapper Detector

1

-

52115.55

... More
INSTRUMENT FITTINGS

-

-

-

... More
CS Bushing 1" Butt Welded x 1/2" FNPT as per tender specifications

53

-

6314.04

... More
SS Connector 1/2" MNPT x 1/2" OD Tube as per tender specifications

240

-

46240.9

... More
SS Connector 1/2" FNPT x 1/2" OD Tube as per tender specifications

11

-

2410.52

... More
SS Union Tee 3 x 1/2" OD tube as per tender specifications

11

-

5176.68

... More
1/2" OD SS Tube End cap as per tender specifications

55

-

6456.9

... More
SS Two valve manifold 3 x 1/2" FNPT as per tender specifications

55

-

85568.7

... More
SS TUBE 1/2" OD (M) as per tender specifications

131

-

50595.58

... More
Hex nipple 12.7 MM MNPT X 12.7 MM MNPT X 80 MM Long

4

-

382.32

... More
Inst. Works-Tamil Nadu-Service

-

-

-

... More
As built documentation for all stations including SV locations covering a) Control /signalling cable layout drawings, b) Cable trench details, c) Cable marker details, d) Earth grid layout, e) Field instrument termination details, f) Cable schedule, g) Junction box wiring details, h) Earth resistivity measurement data, i) Field panel termination details, j) Calibration data of all instruments tested as per scope, k) OTDR Traces of the laid OFC.

2

-

297696.77

... More
Inst. Works-Tamil Nadu-Composite

-

-

-

... More
INSTALLATION OF PI

-

-

-

... More
Installation, testing and commissioning of Pressure Indicator (PI) of various ratings as per drawings, recoomendations of OEM and directions of Engineer in-charge/ Site engineer

4

-

17374.6

... More
Taking delivery, shifting within a road distance of 500 meters and installation & testing of the different instruments (like Pressure Gauge, Pressure Switch, Pressure Transmitter, Temperature Transmitter, scrapper detector, level switch, level transmitter, flow switch etc.) of various ratings by fabrication and installing all the required pipe fittings with pressure pipes, valves, plugs, tees, nipples, junction box, cables, supply and erection of all other required materials such as the supporting structure clamps, cannopy, screws, nuts, bolts, aluminium sheets, GI wire, steel plats, cement concrete etc. complete in all respects including supply of suitable size non flame proof cable gland at control panel end and terminating the already laid cables at field, junction box and control panel end, mounting the junction boxes as per the Drawings, specifications and directions of the engineer in-charge/site engineer including cost of all labour, materials, consumables, tools, tackles and services rendered etc. All the instruments shall have to be properly connected to the earth pit through GI wires. The works shall include labelling, tagging using SS plates, glanding and ferruling at both field and panel side. Installation to be done as per OEMs recommendations, vendor drawings and other approved drawings. The scope also shall include Calibration of instruments, hydro-testing of Impulse tube, providing assistance in testing and commissioning of the instruments to control system vendor along with loop checking etc.

-

-

-

... More
INSTALLATION OF PI+PS/PT

-

-

-

... More
Installation, assistance in testing and commissioning of Pressure gauges and Pressure switches (PI+PS) / Pressure Gauge and Pressure Transmitter (PI+PT) of various ratings as per the directions of Engineer-in-charge/ Site engineer and drawings.

10

-

93145.31

... More
INSTALLATION OF PT / PS

-

-

-

... More
Installation, assistance in testing and commissioning of Pressure Transmitter (PT) / Pressure Switch (PS) of various ratings as per the directions of Engineer in-charge/ Site engineer and drawings.

26

-

280166.08

... More
INSTALLATION OF DPT

-

-

-

... More
Installation, assistance in testing and commissioning of Differential Pressure Transmitter (DPT) as per the directions of Engineer in-charge/ Site Engineer and drawings.

2

-

33256.25

... More
INSTALLATION OF TEMPERATURE TRANSMITTER WITH THERMOWELL

-

-

-

... More
Installation and assistance in testing & commissioning of temperature elements/temperature transmitter(TT) by making necessary holes on the pipes, welding the socket for thermowell on the pipe including supply of boss, silicon paste etc as per the directions of engineer in-charge/site engineer and drawings.

2

-

18916.46

... More
INSTALLATION OF SUB SOIL TEMPERATURE TRANSMITTER

-

-

-

... More
Installation and assistance in testing & commissioning of Sub Soil temperature elements/temperature transmitter(TT) as per the directions of engineer in-charge/site engineer and drawings.

2

-

21465.52

... More
INSTALLATION OF SURFACE MOUNTED TEMPERATURE TRANSMITTER

-

-

-

... More
Installation and assistance in testing & commissioning of Surface Mounted temperature elements/temperature transmitter (TT) by by welding the weld pad on the surface of the pipe, silicon paste as per the directions of engineer in-charge/site engineer and drawings.

18

-

259557.26

... More
INSTALLATION OF EMERGENCY SHUTDOWN SWITCH

-

-

-

... More
Installation and testing of emergency shut - down (ESD) Push button. This includes mounting of termination box as per the drawings, specification and instruction of Engineer in-charge/ Site engineer, replacement of broken glass covers and painting it in red colour.

8

-

98212.06

... More
INSTALLATION & TESTING OF SCRAPPER DETECTOR

-

-

-

... More
Installation, assistance in testing and commissioning of Scrapper Detector of various ratings aas per OEM recommandations, vendor drawings, directions of engineer in-charge/site engineer and other approved drawings.

2

-

14139.26

... More
INSTALLATION OF FLOW METER

-

-

-

... More
Taking delivery, shifting to installation site within the station premises, erecting and installing of the flow meter along with reducers and flow meter electronics/ flow transmitter. Providing assistance to control system vendor/meter supplier in testing and commissioning of the turbine/ ultrasonic / coriolis mass flow meter / clamp on ultrasonic etc.. Making structural supports and fittings, clamps, screws, nuts, bolts, making the cable supports and terminating cables at panel and field ends. Mounting the junction boxes as per Drawings,manufacturer's instructions, specification and direction/instruction of engineer in-charge/site engineer. Job shall include termination of cables at both fiels ends and control panel ends, supply of suitable size non-flame proof cable glands at control panel and the cost of all labour, tools, materials, etc. including labelling, tagging using SS plates painting, glanding, ferruling complete in all respect.

3

-

74833.58

... More
INSTRUMENTATION JOBS FOR PCV/FCV

-

-

-

... More
Testing of control valve and field electronics, including fabrication of all structural supports and fittings, termination of related cables at field, panel & MCC end, after loop testing as pervendors drawing and direction of the site engineer. Mounting of junction box if any, supply of non flame proof cable glands for paneland MCC end. The works includes tagging, labelling, glanding and ferruling at both panel and field ends.

2

-

51131.15

... More
INSTALLATION OF JUNCTION BOXES/ PUSH BUTTON STATION FOR MOV/ROSOV

-

-

-

... More
Installation of explosion proof/flame proof junction boxes, non-flame proof junction box for marshalling of control cables, terminating the cables at field and control panel end, mounting the junction boxes, connecting to earthing grid by supplying and installing all the required materials such as supporting structure, cement concrete, painting, GI wire etc. (excluding supply of the Junction Boxes) in all respects complete as per specifications, drawings and direction of site Engineer including supply of suitable size non-flame proof cable glands at Control Panel end and the cost of labour, tools, materials, glanding, ferruling etc. complete in all respects.

34

-

218236.75

... More
INSTRUMENTATION JOBS FOR MOV/ROSOV/ROV

-

-

-

... More
Carrying out the instrumentation and control system jobs on the already erected actuator assembly of motor operated valves (MOV), Remote Operated Shut off valve (ROSOV) & Remote Operated Valves (ROV) by making the necessary cable connection at field and control panel end (excluding the supply of cables) calibrating the control components, adjusting the limit switches, testing the whole assembly as per drawings specifications and direction of the engineer in-charge/site engineer complete in all respect, including supply of suitable size non-flame-proof cable glands, ferruls, drilling/cutting of plate for fixing glands at Control Panel end and the cost of all labour, tools, glanding, ferruling, consumables etc.

43

-

301694.97

... More
INSTALLATION OF INFRARED HYDROCARBON DETECTORS (POINT TYPE / OPEN PATH TYPE)

-

-

-

... More
Terminating the cables at field and control panel / RTU end, connecting to earthing grid by supplying and installing all the required materials such as supporting structure, canopy, cement concrete, painting, GI wire etc.(excluding supply of the Hydrocarbon detector) complete in all respectsas per specifications.

15

-

77295.9

... More
INSTALLATION OF MANUAL CALL POINT (EX-PROOF & WEATHER PROOF)/ HAZARDOUS AREA HOOTER/ HAZARDOUS AREA BEACON

-

-

-

... More
Installation of Manual Call Point (Explosion Proof & Weather Proof)/ Hooter / Beacon in Hazardous area, terminating the cables at field and control panel end, connecting to earthing grid by supplying and installing all the required material such as supporting structure, cement concrete, painting, GI wire etc. (excluding supply of the Manual Call Point/ Hooter/ Beacon) complete in all respects as per specifications.

8

-

28457.73

... More
INSTALLATION OF CONTROL PANEL/ CONSOLE DESK/ UPS/ RIO/ RTU/ PLC/ ACDB

-

-

-

... More
Taking delivery, shifting the panels to installation site and erection, installation, testing of Control panels/ RTU panel, mounted with all the instruments, power supply units, UPS & battery banks logic control systems , barriers, providing assistance to control system vendor for commissioning of control system including panels, control desk etc. installation on already made foundations or fixing on walls, or steel structure or fixtures aligning, levelling, grouting, inter-wiring outgoing, incoming cable terminations as required, earthing, testing, complete in all respects as per drawings, specifications and directions of the engineer in-charge/site engineer, including supply of suitable size non-flame proof cable glands for all incoming/outgoing cables and the cost of the materials, tools, labour, glanding, ferruling etc. complete in all respects.The indicated quantity is cumulative weight of panels.

16500

-

689043.3

... More
AIR CONDITIONERS - CASSETTE TYPE

-

-

-

... More
Supply & Installation of 1.8T Cassette Type ACs flushed with false ceiling along with 5KVA Voltage Stablizer & MS stand for outdoor unit, refregerant piping, drain piping complete as per instruction of EIC / Site Engineer.

6

-

1093008.56

... More
AIR CONDITIONERS - SPLIT TYPE

-

-

-

... More
Supply & Installation of 1.8T Split Type five star BEE rated ACs along with 5KVA Voltage Stablizer & MS stand for outdoor unit, refregerant piping, drain piping complete as per instruction of EIC / Site Engineer

4

-

463848.14

... More
MAGNETIC PROXIMITY SWITCH

-

-

-

... More
Supply & installation of MAGNETIC PROXIMITY SWITCH with suitable junction box for termination of leads/cable for extending contact to control system for unauthorised entry of building / MOV fencing.

28

-

543625.95

... More
ML-Tel. Works-Kerala-Supply

-

-

-

... More
Supply of permanently-lubricated HDPE pipe of 40 mm OD (as per TEC GR) with minimum pressure rating of 8 Kg/cm2 and wall thickness of 3.5 mm, along with duct accessories such as couplers, end caps, end sealing plugs, warning tape etc.

13

-

849882.02

... More
Supply of OFC Jointing kits as per tender specifications.

5

-

53583.8

... More
Supply of Electronic Marker Locator cum Cable/ Pipe Locator, Fault Locator as per tender specifications

1

-

268933.8

... More
GPS Hand held device to note co-ordinates

1

-

53789

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

3

-

6432.18

... More
Supply of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications

10

-

25334.6

... More
Supply of Joint pit markers for OFC joint locations as per tender specifications

3

-

10191.66

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications

3

-

36412.44

... More
Supply of Transition pits for building entry points as per tender specifications

1

-

12246.04

... More
Supply of wall mounted Fibre Termination Box (FMS) for 48F as per tender specifications

1

-

16492.86

... More
Supply of 2 Pair unarmoured Telephone Cable as per specifications

50

-

2950

... More
Supply of 5 Pair Armoured PIJF Underground Telephone Cable as per specifications

50

-

5794.39

... More
Cat 6 UTP (LAN) Networking Cable as per tender specifications

500

-

12867.9

... More
Wall mounted telephone socket outlet with 2 port telephone jack face plate (white/ cream colour) including RJ11 I/O. The item includ es modular plate & switch box/ gang box for fixing the face plate.

2

-

724.35

... More
Duplex (2 port) Face plate (Network I/O point) (white/ cream colour) for Local Area Network including RJ45 I/O, modular plate & swit ch box/ gang box for fixing the face plate.

2

-

1003.76

... More
Power cable 3 core x 2.5 mm2 Armoured, Copper as per tender specifications

500

-

59259.6

... More
ML-Tel. Works-Kerala-Service

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable str aps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspectio n of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after la ying as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engine er and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportation , loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end sealing plugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-char ge/ Site Engineer

13

-

136035.12

... More
Trenching for laying of HDPE in Independent trench Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.65 metres including shoring, strutting etc. (if necessary), backfilling the trench, as directed by Engineer-in-charge/ Site Engineer, including all labour and materials complete as per drawings and tender specifications

618.75

-

166468.5

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (R OW), pre laying testing of each cable drum for each fibre and taking the OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/ Site Engineer, blowing of OFC through contractor laid HDPE, jointing / splicing of OFC, post insta llation testing of OFC for each fibre for each drum laid & taking OTDR traces, submission of OTDR traces (in hard as well as soft co py) to Engineer-in-charge/ Site Engineer as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

11

-

180357.1

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

5

-

32568

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

3

-

1596.54

... More
Installation of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications, drawings and directions of Engineer-i n-charge/ Site Engineer

10

-

8802.8

... More
Installation of OFC Joint pit markers at every joint location as per specifications, drawings and directions of Engineer-in-charge/ Site Engineer

3

-

2382.42

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-i n-charge/ Site Engineer.

3

-

5639.22

... More
Installation of Transition Pits at building entry points as per tender specifications, drawings and directions of Engineer-in-charge / Site Engineer

1

-

5151.88

... More
Installation of wall mounted Fibre Termination Box (FTB) as per tender specifications and directions of Engineer-in-charge/ Site Engineer

1

-

7385.62

... More
ML-Tel. Works-Kerala-Composite

-

-

-

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval including the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer including cost of all labour, tools, materials complete in all respects.

20

-

32804

... More
Supply, installation & fixing of perforated GI trays of width 150 mm, 300 mm, 450 mm &600 mm as per site requirement for laying of cables with standard rung spacings. Load for support span of2.5 meter as 30, 60, 75 & 90 (in Kg/Mtr) respectively with concentricstatic load as 70 Kg at the centre, with materials, labour, tools andtackles, consumables etc , as per drawings, specification anddirections of Site Engineer / Engineer-in-Charge

100

-

23930.4

... More
ML-Tel. Works-Tamil Nadu-Supply

-

-

-

... More
Supply of permanently-lubricated HDPE pipe of 40 mm OD (as per TEC GR) with minimum pressure rating of 8 Kg/cm2 and wall thickness of 3.5 mm, along with duct accessories such as couplers, end caps, end sealing plugs, warning tape etc.

114

-

7452811.56

... More
Supply of OFC Jointing kits as per tender specifications.

193

-

2068334.68

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

189

-

405227.34

... More
Supply of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications

115

-

291347.9

... More
Supply of Joint pit markers for OFC joint locations as per tender specifications

164

-

557144.08

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications

164

-

1990546.72

... More
Supply of Transition pits for building entry points as per tender specifications

9

-

110214.36

... More
Supply of 89 mm OD, Schedule 80, API 5L Grade-B/ ASTM A106 MS pipe for cable conduit as per tender specifications

9964

-

16154832.48

... More
Supply of wall mounted Fibre Termination Box (FMS) for 48F as per tender specifications

9

-

148436.27

... More
Cat 6 UTP (LAN) Networking Cable as per tender specifications

1000

-

25735.8

... More
Wall mounted telephone socket outlet with 2 port telephone jack face plate (white/ cream colour) including RJ11 I/O. The item includ es modular plate & switch box/ gang box for fixing the face plate.

26

-

9416.61

... More
Duplex (2 port) Face plate (Network I/O point) (white/ cream colour) for Local Area Network including RJ45 I/O, modular plate & swit ch box/ gang box for fixing the face plate.

12

-

6022.53

... More
Wall mounted Cabinet (switching closet) for housing Networking Equipment/ CCTV hardware, patch panel & accessories including power distribution boxes, MCBs/ Isolator Switches, required installation materials as per tender specifications

2

-

96260.36

... More
8 port Industrial Grade Network Switch with Optical Interfaces as per tender specifications

2

-

328756.31

... More
Power cable 3 core x 2.5 mm2 Armoured, Copper as per tender specifications

600

-

71111.52

... More
ML-Tel. Works-Tamil Nadu-Services

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable str aps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspectio n of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after la ying as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engine er and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportation , loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end sealing plugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-char ge/ Site Engineer

114

-

1192923.36

... More
Trenching for laying of HDPE in Independent trench Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.65 metres including shoring, strutting etc. (if necessary), backfilling the trench, as directed by Engineer-in-charge/ Site Engineer, including all labour and materials complete as per drawings and tender specifications

1856.25

-

499405.5

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (R OW), pre laying testing of each cable drum for each fibre and taking the OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/ Site Engineer, blowing of OFC through contractor laid HDPE, jointing / splicing of OFC, post insta llation testing of OFC for each fibre for each drum laid & taking OTDR traces, submission of OTDR traces (in hard as well as soft co py) to Engineer-in-charge/ Site Engineer as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

175

-

2869317.5

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

168

-

1094284.8

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

164

-

87277.52

... More
Installation of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications, drawings and directions of Engineer-i n-charge/ Site Engineer

115

-

101232.2

... More
Installation of OFC Joint pit markers at every joint location as per specifications, drawings and directions of Engineer-in-charge/ Site Engineer

164

-

130238.96

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-i n-charge/ Site Engineer.

164

-

308277.36

... More
Installation of Transition Pits at building entry points as per tender specifications, drawings and directions of Engineer-in-charge / Site Engineer

9

-

46366.92

... More
Installation of wall mounted Fibre Termination Box (FTB) as per tender specifications and directions of Engineer-in-charge/ Site Engineer

9

-

66470.58

... More
Installation of Wall mounted Cabinet (switching closet) for housing Networking Equipment/ CCTV hardware, patch panel & accessories including power distribution boxes, MCBs/ Isolator Switches, required installation materials as per tender specifications

2

-

17534.97

... More
ML-Tel. Works-Tamil Nadu-Composite

-

-

-

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval including the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer including cost of all labour, tools, materials complete in all respects.

170

-

278834

... More
Supply and Installation of GI Pipe of 100 mm nominal bore heavy class as per IS1239, sub ducted by 40 mm OD HDPE pipe (excluding supply of HDPE pipe), by boring or jacking method across railway crossing, including all necessary pipe fittings, cost of arranging boring machine, other associated machinery, tools, tackles, skilled manpower, labour etc. job complete in every respects as per the directions of Engineer-in-charge/ Site Engineer. Measurement shall be done by the length of the GI pipe used in the crossings

50

-

283141

... More
Supply, installation & fixing of perforated GI trays of width 150 mm, 300 mm, 450 mm &600 mm as per site requirement for laying of cables with standard rung spacings. Load for support span of2.5 meter as 30, 60, 75 & 90 (in Kg/Mtr) respectively with concentricstatic load as 70 Kg at the centre, with materials, labour, tools andtackles, consumables etc , as per drawings, specification anddirections of Site Engineer / Engineer-in-Charge

4500

-

1076868

... More
Laying of HDPE conduit and blowing of OFC cable inside the SV/MOV premises along the boundary wall, line item includes supply & installation of suitable clamps , connectors, fixture, corner bends, tools & tackles (comprising of anchor bolts/nuts/accessories etc) required for OFC entry inside SV/MOV loctaionalong the boundary wall by clamping of HDPE conduit at a height of 1 meter above the finished ground level and extending it along the length of boundary wall at 1 meter height upto the transition pit inside SV/RCP building as per attached drawing no. STD-793-00. The line item includes all sevices required for blowing of OFC cable iin HDPE conduit inside the MOV/SV loctaion as per STD - 793 drawing.

8100

-

382320

... More
Supply and installation of IDF (intermediate distribution frame) / Distribution box of 10 Pair capacity with mounting arrangements as per specification.

1

-

5516.8

... More
CSW Civil-ITC

-

-

-

... More
EARTHWORK :

-

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in widt h as well as 10 sqm on plan) including getting out and disposal of excavated earth, all works up to any lead and lift, as directed b y the Engineer-in-Charge :

-

-

-

... More
In all kinds of soil

611

-

150187.34

... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

16

-

42239.47

... More
CONCRETE WORK :

-

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
1:3:6 [1 cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from n atural sources]

7

-

59223.54

... More
1:4:8 [1 cement : 4 coarse sand (Zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from n atural sources]

33

-

258253.97

... More
REINFORCED CEMENT CONCRETE :

-

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishi ng and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 [1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived fr om natural sources]

47

-

490344.04

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

527

-

202912.92

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto pli nth level :

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more

51906

-

5858474.5

... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concr ete work, using coarse aggregate as well as fine aggregate derived from natural sources and cement content as per approved design mi x, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, inc luding admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per directions of the Engineer-in-Charge. [Note : Cement content considered in this item is @ 3 30 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately.] :

-

-

-

... More
All works upto plinth level

302

-

3264635.34

... More
Extra for providing richer mixes at all floor levels. [Note: Excess/ less cement over the specified cement content used is payable/ recoverable separately] :

-

-

-

... More
Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. [Note: Cement content considered in M-30 is @ 340 Kg/cum]

302

-

28473.16

... More
Add for using extra cement in the items of design mix over and above the specified cement content therein. [Note: Unit "QN" shall me an "QUINTAL"]

49

-

44594.83

... More
Supplying and providing non-shrinkable cement grout (SHRINKKOMP 20 or any other equivalent approved brand) for grouting holding down bolts in pocket holes for equipment foundation, including necessary surface preparation mixing of grout, curing as per manufacturer 's recommendation/ specification and directions of the Engineer-in-Charge. [Note: This item shall be operated under specific instruc tions of the Engineer-in-Charge]

11371

-

994123.32

... More
STEEL WORK :

-

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing i n position and applying a priming coat of approved steel primer all complete.

19866

-

2732385.53

... More
Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, cl addings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. including cut ting to required size welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves etc. including pre paration of detailed fabrication drawings & submission to the Engineer-in-Charge for approval before start of fabrication, supplying & applying painting with two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of "EPILUX 610" Primer of M/s BERGER or any other approved equivalent make as per manufacturer’s recommendation, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. (Excluding the cost of conc rete work).

11

-

1732723.82

... More
Supplying & fixing welded steel wire fabric of rectangular mesh 75 x 25 mm size, weight not less than 7.75 Kg/sqm fixed on angle iro n frame by welding, painted with two coats of synthetic enamel paint of over a coat of red oxide zinc chrome primer complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engin eer-in-Charge. [Note: This item is for openings in DG, Compresoor, Transformer/ VCB Room/ AVR Room. Angle iron frame shall be paid s eparately].

560

-

1006239.81

... More
Supplying and laying flat brick soling in foundation trench, in floors, garages, sumps, etc., with bricks of class designation 50 la id to proper slope, level and grade etc. filling of the joints with sand etc. complete in all respects inclusive of cost of all labo ur, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge.

47

-

39589.01

... More
FINISHING :

-

-

-

... More
15 mm cement plaster on rough side of single or half brick wall of mix :

-

-

-

... More
1:6 (1 cement : 6 coarse sand)

46

-

18895.95

... More
6 mm cement plaster of mix 1:3 (1 cement : 3 fine sand)

667

-

204966.17

... More
Neat cement punning.

21

-

1781.19

... More
Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 10 mm down size) mixed with approved brand of water proofing compound @ 1Kg/50 Kg bag of cement, in roof grading, coping, in bed concrete etc. at all heights & depths, including providing centering and shuttering, scaffolding, watering, curing, vibrating, etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of the Site Engineer.

1

-

10619.52

... More
Brick work with modular extruded brunt fly ash clay sewer bricks (Conforming to IS: 4885 ) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth : Cement mortar 1:4

11

-

87413.16

... More
CSW Civil-Non ITC

-

-

-

... More
EARTHWORK :

-

-

-

... More
Earth work in surface excavation (not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan) in all kinds of soil including getting out and disposal of excavated earth up to all lead and lift, as directed by the Engineer-in-Charge.

1472

-

184152.5

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in widt h as well as 10 sqm on plan) including getting out and disposal of excavated earth, all works up to any lead and lift, as directed b y the Engineer-in-Charge :

-

-

-

... More
In all kinds of soil

6502

-

1598229.31

... More
In Ordinary rock

14

-

6669.78

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms including getting out the excavated soil and disp osal of surplus excavated soil, all works up to any lead and lift, as directed by the Engineer-in-Charge :

-

-

-

... More
In all kinds of soil

8

-

2728.16

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in d epth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m.

4774

-

1417343.31

... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

138

-

364315.42

... More
Supplying chemical emulsion (Chlorpyriphos/ Lindane emulsifiable concentrate of 20%) in sealed containers including delivery as spec ified.

378

-

102620.42

... More
Diluting and injecting chemical emulsion (Chlorpyriphos/ Lindane E.C. 20% with 1% concentration) for POST-CONSTRUCTIONAL anti-termit e treatment (excluding the cost of chemical emulsion) :

-

-

-

... More
Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres/ sqm of the vertical surface of the substru cture to a depth of 300 mm including excavation channel along the wall & rodding etc. complete :

630

-

24056.42

... More
"Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diamete r holes and plugging with cement mortar 1 : 2 (1 cement : 2 Coarse sand) to match the existing floor : "

2987

-

916728.82

... More
Treatment of existing masonry using chemical emulsion @ 1 litre per hole at 300 mm interval including drilling holes at 45 degree an d plugging them with cement mortar 1:2 (1 cement : 2 coarse sand) to the full depth of the hole :

630

-

27037.46

... More
Filling the excavated earth to required grade, level & profile in low lying areas including watering, ramming, compacting at optimum moisture content to 90% of Proctor's density consolidation by rolling with 8 to 10 tonne power roller in layers not exceeding 20 c m thickness, including clearing the area by cutting of shrubs, bushes, grass, vegetation, debris etc. stacking and disposing out of plot area to an unobjectional area as directed by Engineer-in-Charge complete in all respects inclusive of cost of all labour, mate rials, tools, tackles etc. as per drawings, specifications and direction of the Engineer-in-Charge.

1561

-

343474.01

... More
Supplying and filling selected earth/ moorum (excluding black cotton soil) from Contractor's own borrow areas including royalty, wit h all leads and lifts in low laying areas and filling to required grade and level including watering, compacting at optimum moisture content to 90% of Proctor's density, consolidation and rolling with 8 to 10 tonne power roller in layers not exceeding 20 cm thic kness, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge.

13731

-

7663820.34

... More
Supplying all labour, materials, tools, chemicals, spray pumps etc. for making pre-constructional anti-termite treatment & creating a continuous chemical barrier under & all round the column pits, wall trenches, top surface of plinth filling, junction of wall & fl oor, along the exterior perimeter of the building, complete in all respects inclusive of cost of all labour, materials, tools, tackl es etc. as per drawings, specifications and direction of Site Engineer. [Note: Total plinth area of the building shall be measured for payment].

388

-

131661.05

... More
CONCRETE WORK :

-

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
1:2:4 [1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from n atural sources]

21

-

192700.93

... More
1:3:6 [1 cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from n atural sources]

189

-

1599035.56

... More
1:4:8 [1 cement : 4 coarse sand (Zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from n atural sources]

435

-

3404256.93

... More
Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 [1 cement : 2 coarse sand (Zone-III) derived from natu ral sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources]

243

-

137592.19

... More
Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 Kg per square metre on dam p proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.

167

-

24829.56

... More
Making plinth protection 50 mm thick of cement concrete 1:3:6 [1 cement : 3 coarse sand derived from natural sources : 6 graded ston e aggregate 20 mm nominal size derived from natural sources] over 75 mm thick bed of dry brick ballast 40 mm nominal size, well ramm ed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth, etc . complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direc tions of the Engineer-in-Charge.

383

-

317894.6

... More
REINFORCED CEMENT CONCRETE :

-

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishi ng and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 [1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived fr om natural sources]

1387

-

14470365.72

... More
1:2:4 [1 cement : 2 coarse sand derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sour ces]

13

-

128213.25

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fille ts, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering , shuttering, finishing and reinforcement, with :

-

-

-

... More
1:1.5:3 [1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived fr om natural sources]

301

-

3786289.84

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 Degree landings, balconies, shelves, chajjas , lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cos t of centering, shuttering, finishing and reinforcement, with :

-

-

-

... More
1:1.5:3 [1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived fr om natural sources]

484

-

6387760.17

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

2201

-

847459.83

... More
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

3390

-

2792019.59

... More
Suspended floors, roofs, landings, balconies and access platform

1345

-

1259998.69

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

5184

-

3868344.35

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

3862

-

3830110.69

... More
Weather shade, Chajjas, corbels, etc. including edges.

75

-

77731.32

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto pli nth level :

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more

206918

-

23354213.91

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above pl inth level :

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500 D or more

116859

-

13189524.75

... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concr ete work, using coarse aggregate as well as fine aggregate derived from natural sources and cement content as per approved design mi x, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, inc luding admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per directions of the Engineer-in-Charge. [Note : Cement content considered in this item is @ 3 30 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately.] :

-

-

-

... More
All works upto plinth level

187

-

2021479.5

... More
All works above plinth level upto floor V level

155

-

1969622.66

... More
Extra for providing richer mixes at all floor levels. [Note: Excess/ less cement over the specified cement content used is payable/ recoverable separately] :

-

-

-

... More
Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. [Note: Cement content considered in M-30 is @ 340 Kg/cum]

342

-

32244.44

... More
Add for using extra cement in the items of design mix over and above the specified cement content therein. [Note: Unit "QN" shall me an "QUINTAL"]

171

-

155626.86

... More
Add for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections.

474

-

37731.73

... More
MASONRY WORK :

-

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :

-

-

-

... More
Cement mortar 1:4 (1 cement : 4 coarse sand)

39

-

336135.14

... More
Cement mortar 1:6 (1 cement : 6 coarse sand)

178

-

1481510.84

... More
Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 7.5 in superstructure above plinth level up to fl oor V level in all shapes and sizes in :

-

-

-

... More
Cement mortar 1:4 (1 cement : 4 coarse sand)

27

-

285008.41

... More
Cement mortar 1:6 (1 cement : 6 coarse sand)

1173

-

12035111.14

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level :

-

-

-

... More
Cement mortar 1:3 (1 cement :3 coarse sand)

7

-

9051.31

... More
Providing and laying autoclaved aerated cement blocks masonry with 150 mm/ 230 mm/ 300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive m ortar all complete as per directions of Engineer-in-Charge. [Note: The payment of RCC band and reinforcement shall be made for seper ately].

27

-

242223.62

... More
CLADDING WORK :

-

-

-

... More
Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut Granite (of any colour and s hade) for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour an d texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matc hing pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels :

-

-

-

... More
Area of slab up to 0.50 sqm

52

-

296433.84

... More
Extra for fixing marble/ granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete.

8

-

4695.74

... More
Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar lo cation in marble/ Granite/ stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of c ut edges etc. complete.

2

-

1985.8

... More
Providing and fixing first quality ceramic glazed wall tiles conforming to IS:15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by the Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey ce ment slurry @ 3.3 Kg/sq.m., including pointing in white cement mixed with pigment of matching shade complete.

110

-

153192.56

... More
Providing and laying Burnt Terracota Tiles 12 mm thick for facia, over walls, sloping RCC Roofs etc. at all levels and locations lai d over and including a backing coat of 15 mm thick cement mortar (1 cement : 3 sand) and joints filled with coloured cement of same colour as tiles complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per specifications and d irections of the Engineer-in-Charge.

321

-

739113.41

... More
Providing and fixing 12 mm thick Elevational Brick Tiles for facia, vertical face of walls, etc. at all levels and locations laid ov er and including a backing coat of 15 mm thick cement mortar (1 cement : 3 sand) and joints filled with coloured cement of same colo ur as tiles complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per specification and direct ions of the Engineer-in-Charge.

249

-

435076.9

... More
Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open g rooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including: (A) Structural ana lysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of w ater to make it watertight including checking of all the structural and functional design. (B) Providing, fabricating, supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4 mm thick alumin ium composite panel material consisting of 3 mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5 mm thi ck). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF/ Lumiflon based fluoropolymer resi n coating of approved colour and shade on face #1 and polymer (Service) coating on face #2 as specified using stainless steel screws , nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. (C) The fastening brackets of Aluminium alloy 6005 T5/ MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bo lts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specificati on and drawing. The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium co mposite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items. The Contractor shall p rovide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete, as per the Arc hitectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Cha rge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Pane l Cladding (including width of groove) shall be measured in square metre up to two decimal places.

420

-

2446752.42

... More
WOOD & PVC WORK :

-

-

-

... More
Providing and fixing ISI marked flush door shutters conforming to IS:2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on bot h faces of shutters :

-

-

-

... More
35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws

16

-

65400.13

... More
Providing and fixing ISI marked flush door shutters conforming to IS:2202 (Part I) non-decorative type, core of block board construc tion with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face vene ers on both faces of shutters :

-

-

-

... More
35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws

9

-

22952.48

... More
STEEL WORK :

-

-

-

... More
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrange ments for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27. 5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS:4454 (Part-1) and M.S. top co ver of required thickness for rolling shutters :

-

-

-

... More
80 x 1.25 mm M.S. laths with 1.25 mm thick top cover

96

-

382039.07

... More
Providing and fixing ball bearing for rolling shutters.

58

-

32915.53

... More
Supplying and fixing circular/ hexagonal M.S. Sheet ceiling fan box with clamp, 140 mm internal diameter, 73 mm height, 3 mm thick r im bottom, and top lid of 1.5 mm thick, M.S. sheet lids shall be screwed into the M.S. box by means of 3.0 mm diameter round headed screws, clamp shall be made of 12 mm diameter M.S. bar bent to shape as per standard drawings with over all length as 80 cm complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of t he Engineer-in-Charge.

47

-

10942.81

... More
Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete :

-

-

-

... More
Stainless Steel (Grade 304) wire gauze of 0.5 mm dia wire and 1.4 mm aperture on both sides.

83

-

104287.49

... More
Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, cl addings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates, flats, bars etc. including cut ting to required size welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves etc. including pre paration of detailed fabrication drawings & submission to the Engineer-in-Charge for approval before start of fabrication, supplying & applying painting with two coats of epoxy paint "EPILUX 155 High Build Enamel over a coat of "EPILUX 610" Primer of M/s BERGER or any other approved equivalent make as per manufacturer’s recommendation, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge. (Excluding the cost of conc rete work).

22

-

3465447.65

... More
Supplying, fabricating, erecting, placing and fixing in position M.S. structural works using rolled/ built up sections for truss, cl addings, bracings, purlins, supporting frames made of joists, tubes, pipes, channels, angles, plates,flats, bars etc. including cutt ing to required size, welding of joints, fixing anchor plates, including bolts, theading, nuts, washers, sleeves, etc. including pre paration of detailed fabrication drawings & submitting to the Engineer-in-Charge for approval before start of fabrication, supplying & applying painting with epoxy mastic 100 micron, MIO 100 micron, 2 coats of Polyurethane (PU) with 50 micron in each coat over a c oat of EPILUX 610 primer of M/s BERGER or (for coastal area) any other approved equivalent make as per manufacturer’s recommendatio ns, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and dir ections of the Engineer-in-Charge. (excluding the cost of concrete work).

8

-

1249320.47

... More
Supplying, fitting and fixing hot dip galvinised barbed line wire through holes in fencing posts (already made in the body of the po st), tightening and fixing the wire in tight condition with straining bolts (straining bolts at end post) including the cost of cutt ing and lapping joints, making holes, straining bolts, galvanised staples, binding wires etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge.

4480

-

3114165.38

... More
Supplying & fixing welded steel wire fabric of rectangular mesh 75 x 25 mm size, weight not less than 7.75 Kg/sqm fixed on angle iro n frame by welding, painted with two coats of synthetic enamel paint of over a coat of red oxide zinc chrome primer complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the Engin eer-in-Charge. [Note: This item is for openings in DG, Compresoor, Transformer/ VCB Room/ AVR Room. Angle iron frame shall be paid s eparately].

519

-

932568.68

... More
Supplying and placing in position 5.0 mm thick steel chequered plates over cable ducts, valve pits etc. including provision for lift ing arrangements complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifica tions and directions of the Engineer-in-Charge.

200

-

1330230.52

... More
Supplying, fitting and fixing punched tape concertina spiral coil of 50 turns per coil having core wire of 2.6 mm diameter made of h igh carbon spring steel of high tensile strength as per IS:4454 (Part-I, Grade-II) having minimum galvanising coating thickness equi valent to 230 grams per square metre and low carbon steel strip of 0.5 mm thickness having a series of barbes punched all along the length on both sides of the strip at regular interval as per IS:513, DD quality having minimum galvanising coating thickness of 12 m icrons. Hardness of tape should be between 137-180 VPN (Victor Penetration Number). The coil should be clipped sufficiently at regul ar intervals. The coil should not be stretched for more than 6.0 m length and the minimum diameter of the coil in the closed conditi on should not be less than 600 mm complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per dr awings, specifications and directions of the Engineer-in-Charge.

1120

-

677333.22

... More
FLOORING :

-

-

-

... More
Supplying and laying flat brick soling in foundation trench, in floors, garages, sumps, etc., with bricks of class designation 50 la id to proper slope, level and grade etc. filling of the joints with sand etc. complete in all respects inclusive of cost of all labo ur, materials, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge.

1958

-

1649261.39

... More
Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1: 2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 k g of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.

168

-

178830.32

... More
Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make & colour using acid and/or alkali resisting mor tar bedding and filling joints with acid and/or alkali resisting cement as per IS:4457, all complete as per specifcations and direct ions of the Engineer-in-Charge :

-

-

-

... More
In flooring on a bed of 10 mm thick mortar 1:4 (1 acid and/or alkali resistant cement : 4 coarse sand) :

156

-

315246.2

... More
In dado/ skirting on 12 mm thick mortar 1:4 (1 acid and/or alkali resistant cement : 4 coarse sand) :

250

-

543286.75

... More
Providing and laying Polished Granite stone slab (Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent) flooring in required de sign and patterns, in linear as well as curvilinear portions of the building, all complete as per the architectural drawings, with 1 8 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand), laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade, including rubbing, curing and polishing etc. al l complete as specified and as directed by the Engineer-in-Charge.

123

-

586333.67

... More
Kota stone slab flooring 25 mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigmen t to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse san d) :

610

-

1263083.45

... More
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cemen t: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and poli shing complete.

178

-

435505.34

... More
Providing and laying ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of first quality conforming to IS:15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 Kg/sq.m. including pointing the joints with white cement and mat ching pigment, etc. complete.

20

-

25058.01

... More
Providing and fixing ceramic glazed floor tiles of first quality conforming to IS:15622 (thickness to be specified by the manufactur er) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by the Engineer-in-Charge i n skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cem ent slurry @ 3.3 Kg/sq.m. including pointing in white cement mixed with pigment of matching shade complete.

206

-

258374.59

... More
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of first quality conforming to IS:15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick be d of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 Kg/sq.m. including pointing the joints wit h white cement and matching pigments etc., complete.

68

-

91612.42

... More
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the Manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 ce ment : 4 coarse sand), jointing with grey cement slurry @ 3.3 Kg/sq.m. including grouting the joints with white cement and matching pigments etc., complete :

-

-

-

... More
Size of Tile 600x600 mm

105

-

212972.95

... More
Providing and laying Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absor ption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS:15477, in average 6 mm thickness, including grouting o f joints. [Note: Payment for grouting of joints shall be made separately] :

-

-

-

... More
Size of Tile 600x600 mm

7

-

15233.34

... More
Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to IS:15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of c ement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 Kg/sq.m. including grouting the joint with white cement & matching pigments etc. complete :

-

-

-

... More
Size of Tile 600x600 mm

24

-

50149.06

... More
Providing and fixing removable raised/ false access flooring with system (Unitile Solid Feel (USF) 800 or equivalent) and its compon ents of approved make for different plenum height with possible height adjustment up to 50 mm, comprising of modular load bearing fl oor panels supported on G.I. rectangular stinger frame work and G.I. Pedestal etc. all complete, as per the architectural drawings, as specified and as directed by Engineer-in-charge consisting of: (A) Providing at required spacing to form modular framework, pedes tals made out of G.I. tube of thickness minimum 2 mm and 25 mm outer diameter, fully welded on to the G.I. Base plate of size 100mm x 100mm x 3mm at the bottom of the pedestal tube, G.I. pedestal head of size 75 mm x 75 mm x 3.5 mm welded with G.I. fully threaded stud 16 mm outer diameter with two G.I. Check nuts screwed on the stud for level adjustment up to 50 mm, locking and stabilizing the pedestal head in position at the required level. The pedestals shall be fixed to the sub-floor (base) through base plate using epox y based adhesive of approved make or the machine screw with rawl plug. (B) Stringers system in all steel construction hot dipped gal vanized of rectangular size 570x20x30x0.80 mm thick having holes at both ends for securing the stringers on to the pedestal head usi ng fully threaded screws ensuring maximum lateral stability in all directions, the grid formed by the pedestal and stringer assembly shall receive the floor panel, this system shall provide adequate solid, rigid support for access floor panel. The system shall pro vide a minimum clear uninterrupted clearance between the bottom of the floor for electrical conduits and wiring etc. all complete as per the architectural drawings, as specified and as directed by the Engineer-in-Charge. (C) Providing and fixing Access Floor panel of 600x600x32 mm medium grade Filled Steel anti static high pressure Lamination of 800H grade (FS800H). Access Floor panel shall be steel welded construction with an enclosed bottom pan with uniform pattern of 64 hemispherical cones. The top and bottom plates of Steel Gauges: top 0.6 mm and bottom 0.7 mm fused spot welded together (minimum 64 welds in each dome and 20 welds along each flange) . The panel should be corrosion resistant epoxy coated for lifetime rust protection and cavity formed by the top and bottom plate is filled with Pyrogrip non-combustible Portland cementitious core mixed with lightweight foaming compound. The access floor shall be factory finished with Anti-static High Pressure laminate with Non Warp technology up to 1 mm thickness for superior adhesion and Sur face flatness within 0.75 mm.The panel is to withstand a Concentrated Load of 363 Kg applied on area 25 mm x 25 mm without collapse in the centre of the panel which is placed on four steel blocks. The panel will withstand and Uniformly Distributed Load (UDL) minim um 1250 Kg/sq.m. and, an impact load of 50 Kg all complete as per the approved manufacturers specification and as per the direction of the Engineer-in-Charge. All specification must be printed on the side of the panel to ensure the quality of the product :

-

-

-

... More
450 mm Finished Floor Height (FFH)

48

-

348047.7

... More
Providing and fixing 2 mm thick P.V.C. (BHOR or equivalent make) sheet/ tile flooring on a smooth and damp proof base using rubber b ased adhesives including rolling with light wooden roller weighing about 5 Kg, all complete including cost of preparation of subgra de, damp proof course consisting of 30 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm n ominal size) as directed by the Engineer-in-Charge.

7

-

14618.13

... More
ROOFING & CEILING :

-

-

-

... More
Providing gola 75x75 mm (in 75x75 mm deep chase) in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and do wn gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design.

423

-

135651.28

... More
Making Khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggr egate of 20 mm nominal size) over P.V.C. sheet 1 m x 1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse s and) and a coat of neat cement, rounding the edges and making and finishing the outlet complete.

46

-

15174.52

... More
Providing and fixing on wall face Unplasticised Rigid PVC (uPVC) rainwater pipes (110 mm diameter, single socketed) conforming to IS :13592 Type-A, including jointing with seal ring conforming to IS:5382, leaving 10 mm gap for thermal expansion.

824

-

339757.78

... More
Providing and fixing on wall face Unplasticised-PVC (UPVC) moulded fittings/ accessories for Un-plasticised Rigid PVC rainwater pipe s conforming to IS:13592 Type A, including jointing with seal ring conforming to IS:5382, leaving 10 mm gap for thermal expansion :

-

-

-

... More
Coupler (110 mm)

92

-

14649.09

... More
Single Push-fit Coupler (110 mm)

92

-

13486.41

... More
Bend- 87.5 Degrees (110 mm)

92

-

16147.21

... More
Shoe - Plain (110 mm)

92

-

14150.8

... More
Providing and fixing tiled false ceiling of specified materials of size 595x595 mm in true horizontal level, suspended on inter lock ing metal grid of hot dipped galvanized steel sections (galvanized @ 120 grams/sq.m., both side inclusive) consisting of main 'T' ru nner with suitably spaced joints to get required length and of size 24x38 mm made from 0.30 mm thick (minimum) sheet, spaced at 1200 mm center to center and cross 'T' of size 24x25 mm made of 0.30 mm thick (minimum) sheet, 1200 mm long spaced between main 'T' at 6 00 mm center to center to form a grid of 1200x600 mm and secondary cross 'T' of length 600 mm and size 24x25 mm made of 0.30 mm thic k (minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of size 24x24x0.3 mm and laying false ceiling tiles of approved texture in the grid including, required cutting/ making, opening for services like dif fusers, grills, light fittings, fixtures, smoke detectors etc. Main 'T' runners to be suspended from ceiling using G.I. slotted clea ts of size 27x37x25x1.6 mm fixed to ceiling with 12.5 mm dia. and 50 mm long dash fasteners, 4 mm G.I. adjustable rods with galvanis ed butterfly level clips of size 85x30x0.8 mm spaced at 1200 mm center to center along main 'T', bottom exposed width of 24 mm of al l 'T'-sections shall be pre-painted with polyester paint, all complete for all heights as per specifications, drawings and as direct ed by the Engineer-in-Charge :

-

-

-

... More
12.5 mm thick square edge PVC Laminated Gypsum Tile of size 595x595 mm, made of Gypsum plasterboard, manufactured from natural gypsu m as per IS:2095 (Part-1) and laminated with white 0.16 mm thick fire retardant PVC film on the face side and 12 micron metalized po lyester on the back side with all edges sealed with the face side PVC film which goes around and wraps the edges and is bonded to th e edges and the back side metalized polyester film so as to make the tile a completely sealed unit.

214

-

544094.74

... More
Providing and fixing LUXALON 75C & 225C un-perforated Aluminium panel coloured ceiling manufactured by M/s. HUNTER DOUGLAS INDIA or any other approved equivalent brand, each panel consisting of 75/225 mm wide x 15.5 mm deep and 0.5 mm thick with bevel edged panel made from enamelled corrosion resistance aluminium alloy AA-5050 (Al.Mg), each panel to abut each other with a narrow 'V' groove, cl ipping with a baked enamelled aluminium panel carrier of 32 mm wide x 39 mm deep x 0.95 mm thick in standard length of 5 metres made of double baked enamelled aluminium alloy AA-5050 (Al.Mg) black with cutouts to hold the panels in a module of 75 mm closed at a di stance of 1.25 metre, each panel carrier suspended by means of G.I. suspension rod 4 mm diameter and a galvanised supsension spring clip at a distance of 1.7 metre centre to centre, making openings for light fittings etc. with suitable peimeter framing all complet e as per manufacturer's recommendation and directions of the Engineer-in-Charge. [Note: Measurement shall be made wall to wall witho ut any deduction for openings, for payment purpose].

210

-

1666660.67

... More
FINISHING :

-

-

-

... More
15 mm cement plaster on the rough side of single or half brick wall of mix :

-

-

-

... More
1:6 (1 cement : 6 fine sand)

12105

-

4791677.09

... More
15 mm cement plaster on rough side of single or half brick wall of mix :

-

-

-

... More
1:6 (1 cement : 6 coarse sand)

2314

-

950548.62

... More
6 mm cement plaster of mix 1:3 (1 cement : 3 fine sand)

12492

-

3838736.64

... More
6 mm cement plaster 1:3 (1 cement : 3 fine sand) finished with a floating coat of neat cement and thick coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams.

132

-

53822.87

... More
Neat cement punning.

132

-

11196.03

... More
Providing & fixing galvanized chicken wire net 20 Gauge, 20 mm mesh size in plastering work at the junction of RCC Columns/ Beams & brickwork as directed by the Engineer-in-Charge.

2192

-

635672.99

... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :

-

-

-

... More
Water thinnable cement primer

8585

-

696154.22

... More
Finishing walls with water proofing cement paint of required shade :

-

-

-

... More
New work (Two or more coats applied @ 3.84 Kg/10 sqm)

435

-

53650.12

... More
Finishing walls with textured exterior paint of required shade :

-

-

-

... More
New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm

16196

-

5079013.77

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :

-

-

-

... More
Two or more coats on new work

183

-

30067.49

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wa ll surface to prepare the surface even and smooth complete.

8585

-

1336186.57

... More
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 gra ms/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour :

-

-

-

... More
Two coats

8585

-

1321801.54

... More
ROAD WORK :

-

-

-

... More
Preparation and consolidation of sub-grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the s ub grade and disposal of surplus earth with lead up to 50 metres.

626

-

132637.38

... More
Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including prepari ng the surface & cleaning with mechanical broom :

-

-

-

... More
With medium setting bitumen emulsion :

-

-

-

... More
On W.B.M/ W.M.M. @ 0.4 Kg/sqm

150

-

3375.39

... More
Providing and laying seal coat over prepared surface of road with bitumen heated in bitumen boiler fitted with the spray set sprayin g using 98 kg of bitumen of grade VG-10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and retained on 2.36 mm sieve) per 100 sqm of road surface, including rolling and finishing with power road roller all complete. [No te: This item to be operated only with the prior approval of the Engineer-in-Charge].

150

-

20101.89

... More
Providing and laying design mix reinforced cement concrete of M-30 grade in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specifi ed design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading, levelling to required s lope/ camber and compacting mechanically by using screed board vibrators, vaccum dewatering process and finally finishing in require d texture by floating & brooming with wire brush, including steel form work with sturdy M.S. channel sections, curing, making provis ion for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing ex pansion joints as per drawing including dowel cap, sponge, sealing tape, bitumen painting, debonding tape and filling joints with ap proved joint filler and sealants, complete all as per direction of the Engineer-in-Charge. [Notes: (1) Item of joint fillers, sealan ts, dowel bars with sleeve/ tie bars to be paid separately. (2) The item rate is inclusive of cost of dowel cap, sponge, sealing tap e, bitumen painting, debonding tape. (3) Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design m ix is payable/ recoverable separately].

-

-

-

... More
Cement concrete prepared with batch mixing machine

53

-

627024.79

... More
Providing and fixing in position pre-moulded joint filler in expansion joints. [Note: Unit "CM" shall mean "PER CENTIMETRE DEPTH PER CENTIMETRE WIDTH PER METRE LENGTH"].

657

-

2752.17

... More
Providing and laying in position bitumen hot sealing compound for expansion joints etc. :

-

-

-

... More
Using Grade 'A' sealing compound. [Note: Unit "CM" shall mean "PER CENTIMETRE DEPTH PER CENTIMETRE WIDTH PER METRE LENGTH"].

88

-

392.52

... More
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS :164, on bituminous surface in white/ yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign mate rial etc. complete :

-

-

-

... More
New work (Two or more coats)

20

-

5837.93

... More
Supplying and fixing Road Hump of minimum size 350 mm width x 50 mm thick made of Carbon Black mixed Rubber with Additive of LDPE fo r reinforcement & UV resistant colouring agent of black & yellow colour with 4 reflective glass beads, of weight not less than 16 Kg /metre, and capacity to withstand minimum 35 tonne weight (moving vehicle load) including cleaning the road surface of all dirt, sca les, oil, grease and foreign material etc. and fixing the hump on the Road top as per manufactures specifications with necessary fas teners complete in all respects inclusive of cost of all labour, materials, fasteners, tools, tackles etc. as per specification and directions of the Engineer-in-Charge.

10

-

34479.72

... More
Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous b inder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of the Engineer-in-Charge :

-

-

-

... More
50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% ( percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.

12

-

163247.81

... More
Construction of granular sub-base by providing close graded material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thicknes s with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per s pecifications and directions of the Engineer-in-Charge :

-

-

-

... More
With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

58

-

197385.75

... More
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specifica tion including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfini sher in sub-base/ base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of the Engineer-in-Charge.

38

-

135675.53

... More
Providing and laying factory made chamfered edge interlocking Cement Concrete paver blocks in foot path, park & lawns driveway or li ght & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in req uired colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/laying of inter locking paver b locks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer's specifications & directions of the Engineer-in-Charge :

-

-

-

... More
60mm thick Cement Concrete paver block of M-35 grade with approved colour, design & pattern.

105

-

125571.41

... More
80mm thick Cement Concrete paver block of M-30 grade with approved colour, design & pattern.

200

-

257634.12

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thi ckness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc . as per directions of the Engineer-in-Charge. [Notes: (1) Length of finished kerb edging shall be measured for payment. (2) Precast C.C. kerb stones shall be approved by the Engineer-in-Charge.]

22

-

249087.5

... More
SANITARY INSTALLATIONS :

-

-

-

... More
Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS:7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required :

-

-

-

... More
W.C. pan with ISI marked white solid plastic seat and lid.

10

-

71112.82

... More
Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I cl amps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :

-

-

-

... More
One urinal basin with 5 litre white P.V.C. automatic flushing cistern

10

-

67345.79

... More
Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, includ ing painting of fittings and brackets, cutting and making good the walls wherever require :

-

-

-

... More
White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm C.P. brass pillar tap

18

-

61081.35

... More
Providing and fixing White Vitreous China laboratory sink with C.I. brackets, C.P. brass chain with rubber plug, 40 mm C.P brass was te and 40mm C.P. brass trap with necessary C.P. brass unions complete, including painting of fittings and brackets, cutting and maki ng good the wall wherever required :

-

-

-

... More
Size 600x450x200 mm

1

-

7380.96

... More
Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete :

-

-

-

... More
Flexible Pipe :

-

-

-

... More
32 mm diameter

21

-

2869.52

... More
Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board grou nd fixed to wooden cleats with C.P. brass screws and washers complete.

17

-

29483.18

... More
Providing and fixing toilet paper holder :

-

-

-

... More
C.P. Brass (Ref. Make: JAQUAR, Model: Cat. No.-1151 or approved equivalent).

13

-

10257.7

... More
Providing and fixing soil, waste and vent pipes :

-

-

-

... More
100 mm diameter :

-

-

-

... More
Centrifugally cast (spun) iron socket & spigot (S&S) pipe as per IS:3989

2

-

2952.67

... More
Re-painting sand cast iron/ centrifugally cast iron (spun) iron, soil, waste, vent pipes and fittings with one coat of synthetic ena mel paint of any colour such as chocolate, grey or buff, etc. :

-

-

-

... More
75 mm diameter pipe

35

-

1094.86

... More
Providing and fixing the following washroom fittings, complete in all respects; inclusive of cost of all materials, labour, tools, t ackles etc. as per specifications and directions of the Engineer-in-Charge :

-

-

-

... More
Stainless steel liquid soap container (spring loaded push type) with lid and brackets fixed to P.V.C. cleats with C.P. brass screws, etc.

18

-

48895.54

... More
C.P. brass double coat hook (Ref. Make: JAQUAR, Model: Cat. No. 1161 or approved equivalent).

27

-

37380.06

... More
WATER SUPPLY :

-

-

-

... More
Internal Work - Exposed on wall: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. Th is includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per directions of the E ngineer-in-Charge :

-

-

-

... More
15 mm nominal outer dia pipes

70

-

22854.59

... More
20 mm nominal outer dia pipes

70

-

29042.99

... More
25 mm nominal outer dia pipes

35

-

17466.6

... More
32 mm nominal outer dia pipes

35

-

22734.41

... More
Internal Work - Concealed in wall: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for ho t & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This i ncludes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same inclu ding testing of joints complete as per directions of the Engineer-in-Charge :

-

-

-

... More
15 mm nominal dia pipes

150

-

83059.02

... More
20 mm nominal dia pipes

150

-

96948.21

... More
External Work: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water suppl y including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, t renching, refilling & testing of joints complete as per directions of the Engineer-in-Charge :

-

-

-

... More
25 mm nominal dia pipes

100

-

44153.24

... More
50 mm nominal dia pipes

100

-

107008.3

... More
80 mm nominal dia pipes

31

-

82375.23

... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :

-

-

-

... More
25 mm nominal bore

17

-

11423.97

... More
32 mm nominal bore

17

-

13356.35

... More
Providing and fixing ball valve (brass) of approved quality, high or low pressure, with plastic floats complete :

-

-

-

... More
20 mm nominal bore

1

-

522.29

... More
25 mm nominal bore

1

-

532.57

... More
Providing and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 gms :

-

-

-

... More
15 mm nominal bore

20

-

16728.62

... More
Providing and fixing 15mm diameter C.P. brass tap as per following with C.P. brass flange including cutting & making good the walls wherever required, etc. complete in all respects inclusive of cost of all materials, labour, tools, tackles etc. as per specificatio ns and directions of the Engineer-in-Charge :

-

-

-

... More
Bib Cock (Ref. Make: JAQUAR, Model: Cat. No. 0021 or approved equivelent)

34

-

67187.76

... More
Providing and fixing 15mm diameter C.P. brass angle valve as per following with C.P. copper connecting pipe 375mm long or as require d including nuts, washers, C.P. brass flange, etc. including cutting & making good the walls wherever required, etc. complete in all respects inclusive of cost of all materials, labour, tools, tackles etc. as per specifications and directions of the Engineer-in-Ch arge :

-

-

-

... More
Angle Valve (Ref. Make: JAQUAR, Model: Cat. No. 0053 or approved equivalent)

35

-

71458.5

... More
Providing and fixing 15mm diameter C.P. brass stop cock with wall flange (Ref. Make: JAQUAR, Model: Cat. No. 0933 or approved equiva lent), male end with C.P. copper connecting pipe 375mm long or as required including nuts, washers, C.P. brass flange etc. including cutting & making good the walls wherever required complete in all respects inclusive of cost of all materials, labour, tools, tackl es etc. as per specifications and directions of the Engineer-in-Charge.

35

-

73958.39

... More
Providing & fixing Angle Valve (Ref. Make: JAQUAR, Model: Cat. No. 563 or approved equivalent) and Health Faucet with flexible tube 8mm diameter x 1.5 m long (Ref. Make: JAQUAR, Model: Cat. No. 549 or approved equivalent).

10

-

37919.18

... More
Providing and placing on terrace (at all floor levels) polyethylene water storage tank (Ref. Make: SINTEX or approved equivalent), I S:12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but with out fittings and the base support for tank.

2000

-

23788.8

... More
Providing and fixing rectangular high density polyethylene water storage loft tank with cover (Ref. Make: SINTEX or approved equival ent), conforming to ISI:12701, colour of opaque white or as approved by the Engineer-in-Charge. The rate includes making necessary h oles for inlet, outlet & overflow pipes. The base support including fittings & fixtures for tank shall be paid separately.

4000

-

47577.6

... More
DRAINAGE :

-

-

-

... More
Providing, laying and jointing glazed stoneware pipes Class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cem ent : 1 fine sand) including testing of joints etc. complete :

-

-

-

... More
100 mm diameter

37

-

15856.44

... More
150 mm diameter

120

-

81133.97

... More
200 mm diameter

120

-

128830.51

... More
250 mm diameter

120

-

190379.78

... More
Providing and fixing square mouth S.W. gully trap class SP-1 complete with C.I. grating, brick masonry chamber with water tight C.I. cover with frame of 300x300 mm size (inside dimension). The brick masonary chamber shall be constructed with common burnt clay F.P. S. (Non-modular) bricks of class designation 7.5. [Note: Weight of the cover shall not less than 4.50 kg and weight of the frame sha ll not be less than 2.70 kg as per standard design] :

-

-

-

... More
100x100 mm size P-type

37

-

115380.28

... More
Providing and laying non-pressure NP-2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in t he proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :

-

-

-

... More
250 mm dia. R.C.C. pipe

90

-

91781.23

... More
300 mm dia. R.C.C. pipe

90

-

105066.85

... More
450 mm dia. R.C.C. pipe

15

-

28237.87

... More
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/ spigot jointed with stiff mixture of cemen t mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete :

-

-

-

... More
450 mm dia R.C.C. pipes

27

-

96386.38

... More
Constructing brick masonry chamber for underground C.I. inspection chamber and bends with common burnt clay F.P.S. (Non-modular) bri cks of class designation 7.5 in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 Kg and weight of frame 15 Kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cemen t : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design :

-

-

-

... More
Inside dimensions 455x610 mm and 45 cm deep for single pipeline :

10

-

81940.03

... More
Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diam eter, 1.8 m long complete as per standard design :

-

-

-

... More
With common burnt clay F.P.S. (Non-modular) bricks of class designation 7.5

8

-

273356.91

... More
Constructing brick masonry Septic Tank with brickwork in cement mortar 1:6 including R.C.C. 1:2:4 (1 cement : 2 sand : 4 graded coar se aggregate) top slab, C.I. cover all as per standard drawing, etc. complete in all respects inclusive of cost of all materials, la bour, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge :

-

-

-

... More
For 10 Users

8

-

1319364.42

... More
Constructing percolation pit of size 3.0m diameter and 2.0m deep, filled with 40 mm size brick ballast including providing suitable pre-cast RCC covers with lifting lugs, laying of 150mm diameter x 5.0m long U.P.V.C. pipe embedded in pit/ outlet pipe all complete as per specification and directions of the Engineer-in-Charge.

16

-

1686908.93

... More
Providing and fixing self cleaning S.C.I. heavy quality Floor/ Nahani trap with 100mm diameter inlet and 100mm diameter outlet, 125m m C.P. brass grating (heavy type) with or without vent arm including cost of cutting and making good the walls and floors, jointing with lead caulked joints, connecting with waste water pipe etc. complete in all respects inclusive of cost of all materials, labour, tools, tackles etc. as per drawings, specifications and directions of the Engineer-in-Charge.

40

-

84639.98

... More
Providing and fixing 32mm diameter (Nominal Bore) brass ball valve of approved quality complete with high pressure copper floats, co mplete in all respects inclusive of cost of all materials, labour, tools, tackles, etc. complete as per specifications and direction s of the Engineer-in-Charge.

10

-

77849.32

... More
Construction of second class brick masonary open surface drain (Size: 200mm wide & 200mm average depth) in cement mortar 1:4 laid ov er a bed of 150mm thick cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including mak ing haunches and providing 15mm thick cement plaster in CM 1:4 (1 cement : 4 coarse sand) with a floating coat of neat cement inside and its top and exposed surfaces, including excavatioin, disposal of the surplus earth up to any lead and lift as per standard desi gn and drawing, complete in all respects inclusive of cost of all labour, materials, carriages, excavation and refilling, curing etc ., as per specifications and directions of the Engineer-in-Charge.

565

-

1392329.61

... More
Constructing Brick Masonary catch pit in cement mortar 1:4 (1 cement : 4 coarse sand) including necessary excavation, 200mm thick fo undation concrete 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm size) and inside and top plastering (15mm thic k) with cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat cement making necessary connections to dr ains inclusive of all labour, material, equipment, etc., all complete as per drawing, specifications and directions of the Engineer -in-Charge :

-

-

-

... More
1000mm x 1000mm x depth up to 1200mm inner dimensions.

2

-

62670.04

... More
750mm x 750mm x depth up to 1000mm inner dimensions

13

-

269776.6

... More
600mm x 600mm x depth up to 750mm inner dimensions

13

-

212051.26

... More
ALUMINIUM WORK :

-

-

-

... More
Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS:733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neopre ne gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural d rawings and the directions of the Engineer-in-Charge. [Note: Glazing, paneling and dash fasteners to be paid for separately] :

-

-

-

... More
For fixed portion :

-

-

-

... More
Powder coated aluminium (Minimum thickness of powder coating 50 micron)

2200

-

1356929.2

... More
For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittin gs wherever required including the cost of EPDM rubber/ neoprene gasket required. [Note: Fittings shall be paid for separately] :

-

-

-

... More
Powder coated aluminium (Minimum thickness of powder coating 50 micron)

1786

-

1318966.36

... More
Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber/ neoprene gasket et c. complete as per the architectural drawings and directions of the Engineer-in-Charge. [Note: Cost of aluminium snap beading shall be paid in basic item] :

-

-

-

... More
With float glass panes of 5.50 mm thickness

214

-

375002.3

... More
Providing and fixing double action hydraulic floor spring of approved brand and manufacture conforming to IS:6315, having brand logo embossed on the body/ plate with double spring mechanism and door weight up to 125 Kg, for doors, including cost of cutting floors, embedding in floors as required and making good the same matching to the existing floor finishing and cover plates with brass pivot and single piece M.S. sheet outer box with slide plate etc. complete as per directions of the Engineer-in-Charge. :

-

-

-

... More
With stainless steel cover plate minimum 1.25 mm thickness

51

-

166311.04

... More
Providing and fixing aluminium tubular handle bar 32 mm outer dia, 3.0 mm thick & 2100 mm long with SS screws etc .complete as per d irections of the Engineer-in-Charge :

-

-

-

... More
Powder coated (Minimum thickness 50 micron) aluminium tubular handle bar

51

-

38784.2

... More
Providing and fixing brass 100mm mortice latch and lock with 6 levers without pair of handles (best make of approved quality) for al uminium doors including necessary cutting and making good etc. complete.

51

-

31610.75

... More
Providing and fixing aluminium casement windows fastener of required length for aluminium windows with necessary screws etc. complet e :

-

-

-

... More
Powder coated (Minimum thickness 50 micron) Aluminium

46

-

4448.79

... More
Providing and fixing aluminium round shape handle of outer diameter 100 mm with SS screws etc. complete as per directions of the Eng ineer-in-Charge :

-

-

-

... More
Powder coated (Minimum thickness 50 micron) Aluminium

46

-

5197.85

... More
Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and f ixing top & bottom pivot & double action hydraulic floor spring type fixing arrangement and making necessary holes etc. for fixing r equired door fittings, all complete as per directions of the Engineer-in-Charge. [Note: Door handle, lock and stopper etc.to be paid separately].

49

-

294601.57

... More
Filling the gap in between Aluminium/ Stone/ Wood frame and adjacent RCC/ Brick/ Stone/ Wood/ Ceramic/ Gypsum work by providing weat her/ structural non-sag elastomeric PU sealant over backer rod of approved quality as per architectural drawings and directions of t he Engineer-in-Charge complete, complying to ASTM C920, DIN 18540-F & ISO 11600 :

-

-

-

... More
Up to 5 mm depth and 5 mm width

695

-

117512.13

... More
Providing and fixing, on fixed glazing/ doors/ window panes, sun control film "HP NATURAL 35 SAFETY COMBINATION FILM-4Mil" of M/s. G ARWARE or approved equivalent make and shade, all complete as per manufacturer's specification and as per directions of the Engineer -in-Charge.

255

-

345598.7

... More
WATERPROOFING :

-

-

-

... More
Grading roof for water proofing treatment with :

-

-

-

... More
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

36

-

336964.95

... More
Cement mortar 1:3 (1 cement : 3 coarse sand)

17

-

295500.05

... More
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflec tivity Index (SRI) of 105 on top of concrete roof in three coats @ 10.76 litre/10 sqm. One coat of self-priming of elastomeric water proofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thi ckness of complete application/ system not less than 500 microns). The operation shall be carried out after scrapping and properly c leaning the surface to remove loose particles with wire brushes, complete in all respect as per directions of the Engineer-in-Charge .

1305

-

733192.59

... More
Supplying and using water proofing compound like CICO, PUDDLE or any other approved brand with Cement Plaster/ CC/ RCC complete in a ll respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the En gineer-in-Charge.

1481

-

252507.83

... More
RAINWATER HARVESTING & TUBEWELLS :

-

-

-

... More
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per directions of the Engineer-in-Charge.

33

-

59172.83

... More
Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulde rs, in required thickness, for all leads & lifts, all complete as per directions of the Engineer-in-Charge.

33

-

59172.83

... More
Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per directions of the Engineer-in-Charge.

33

-

59172.83

... More
TANK FOUNDATION WORKS :

-

-

-

... More
Construction of open surface drain complete as per drawing including necessary excavation, refilling, disposal of surplus earth, pro viding and laying one layer of flat brick and cement concrete 1:3:6 (150 mm thick) at bottom, lining with brick masonry in cement mo rtar 1:4 (1 cement : 4 coarse sand), plastering exposed surface with 18 mm thick cement mortar 1:4 1:4 (1 cement : 4 coarse sand) wi th a floating coat of neat cement, rounding off corners etc. complete as per specification, drawing and directions of the Engineer-i n-Charge :

-

-

-

... More
450 mm x 450 mm rectangular section radial drain.

60

-

206267.3

... More
GENERAL WORKS :

-

-

-

... More
Providing and making Construction/ Contraction joint by mechanically cutting 12mm x 25mm deep groove and filling with bituminous sea ling compound including cleaning etc. complete as per drawing, specifications and directions of the Engineer-in-Charge.

212

-

154166.1

... More
Providing and fixing 75mm diameter P.V.C. pipe (4 Kg/sq.cm) for Weep Holes in Masonry/ RCC wall including providing 230x230x230 mm s ize (approx.) filter using pebles of 40mm & down size in every weep hole on retaining side etc. complete in all respects inclusive o f cost of all materials, labour, tools, tackles etc. as per specifications and directions of the Engineer-in-Charge.

597

-

222722.07

... More
Providing and fixing 100mm wide Vertcal Fabric Blind system of VISTA/ MAC/ TRAC of approved make & shades complete along with standa rd accessories in required design/ shade as per manufacturer's recommendations, specification and directions of the Engineer-in-Char ge.

54

-

80503.85

... More
Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 10 mm down size) mixed with approved brand of water proofing compound @ 1Kg/50 Kg bag of cement, in roof grading, coping, in bed concrete etc. at all heights & depths, including providing centering and shuttering, scaffolding, watering, curing, vibrating, etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of the Site Engineer.

17

-

180531.78

... More
Brick work with modular extruded brunt fly ash clay sewer bricks (Conforming to IS: 4885 ) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth : Cement mortar 1:4

52

-

413225.85

... More
Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor fiv e level in : Cement mortar 1:4

253

-

2591279.43

... More
Half brick masonry with non modular fly ash bricks of class designation 10, conformingio IS :12894, in super structure above plinth and upto floor V level : Cement mortar 1 : 3 (1 cement : 3 coarse sand)

54

-

65383.09

... More
Providing and fixing Toughened glass 12 mm thickness in aluminium/wooden door, window, ventilator shutters and partitions etc. with EPDM rubber/ neoprene gasket etc. complete as per the architectural drawings and directions of the Engineer-in-Charge.

16

-

60973.53

... More
Providing and fixing Glass panes of required thickness having 120 minutes of fire resistance both integrity and radiation control (E I 120) and minimum 20 minutes of insulation (EI 20) in Doors & Windows all complete as per instructions of Engineer-in-charge

42

-

1337105.51

... More
HDD Works-Kerala-ITC

-

-

-

... More
#Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other re sources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordanc e with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretatio n of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, S H, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required f or collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparatio n of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detail ed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, inc luding arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Compl ete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repai ring damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive te sting of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's repres entative(s) for examining radiographs, repair of defects in the.........Continued

-

-

-

... More
"....in Continuation of previous.......welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approv ed make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sle eves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M /s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wher ever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-in stallation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-ins tallation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating surve y as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Tran sportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD inst allation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases."

-

-

-

... More
101 - 300 METERS (with OFC conduit) - ITC portion Note: Payment for Carrier Pipe to be paid separately under Non-ITC head

-

-

-

... More
12.75" in Normal Soil

1

-

6372

... More
12.75" in Rocky Soil

1

-

11239.5

... More
HDD Works-Tamil Nadu-ITC

-

-

-

... More
#Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other re sources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordanc e with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretatio n of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, S H, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required f or collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparatio n of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detail ed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, inc luding arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Compl ete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repai ring damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive te sting of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's repres entative(s) for examining radiographs, repair of defects in the.........Continued

-

-

-

... More
"....in Continuation of previous.......welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approv ed make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sle eves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M /s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wher ever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-in stallation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-ins tallation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating surve y as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Tran sportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD inst allation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases."

-

-

-

... More
UPTO 100 METERS (with OFC conduit)- ITC portion Note: Payment for Carrier Pipe to be paid separately under Non-ITC head

-

-

-

... More
8.625" in Normal Soil

1

-

6372

... More
8.625" in Rocky Soil

1

-

11239.5

... More
12.75" in Normal Soil

1

-

6372

... More
12.75" in Rocky Soil

1

-

11239.5

... More
101 - 300 METERS (with OFC conduit)- ITC portion Note: Payment for Carrier Pipe to be paid separately under Non-ITC head

-

-

-

... More
8.625" in Normal Soil

780

-

4970160

... More
8.625" in Rocky Soil

2320

-

26075640

... More
12.75" in Normal Soil

480

-

3058560

... More
12.75" in Rocky Soil

1440

-

16184880

... More
301 - 500 METERS (with OFC conduit)- ITC portion Note: Payment for Carrier Pipe to be paid separately under Non-ITC head

-

-

-

... More
8.625" in Normal Soil

1

-

6372

... More
8.625" in Rocky Soil

1

-

11239.5

... More
12.75" in Normal Soil

130

-

828360

... More
12.75" in Rocky Soil

370

-

4158615



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.