Cochin Shipyard Limited Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSL_221474_1Bid Award Id
ViewTender No
CSL/SR1/41474/VKD436Tender Authority
Cochin Shipyard Limited ViewPurchaser Address
-Website
http://https://cochinshipyard.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Operational check/ Defect rectification on PUNJ and PUDUS panel view erratic operation during exploitation.
6
-
-
... More
Tank level sensors (SERVICE COST)
-
-
-
... More
1.9.1. Serviceability checks of Russian make tank level sensors for fuel tanks, DA fuel tanks, Dirty oil and water tanks, feed water tanks and lub oil tanks. 1.9.2. Replacement of defective tank level sensors including removal, calibration and fitment. Qty - 52
1.9.3. Continuity checks of power and signal cabling of all sensors, replace if defective (Approx-500 mtrs)
1.9.4. Provisioning of centralisied monitoring system of tank level at PDCR/ SPDCR and followed by STW and commissioning Type of sensors are as follows:- 1.9.5. АД-4Р-Н (Upper level sensor) - qty – 141 1.9.6. АД-4М-О (Lower level sensor) - qty - 60 1.9.7. ДМ (Level measurement sensor) - qty – 10
211
-
-
... More
Kaspiy system(SERVICE COST)
-
-
-
... More
Repairs/ Serviceability checks of solenoids. Replacement of defective ones. -20Nos 3.125.1 Check all service tallies and cable for correct securing.-1Set 3.125.2 Check that the control panel rubber seals/gaskets are in place and in good condition. 3.125.3.Check wiring/contacts/relays of the panels for wear/deterioration. Project specific defects to DYD for renewal/replenishment if necessary.-14Nos 3.125.4. Carry out repair /calibration of defective 37sensors/gauges at shop floor. -4Nos Serviceability of batteries:- Return all batteries in a filled and charged condition to the battery shop for maintenance-4Nos Capacity test of battery and repair as necessary -4Nos Preservation of battery / system -1Set
1
-
-
... More
Unsinkability Board(MATERIAL COST)
-
-
-
... More
Following to be undertaken as part of SoW :-
3.23.1 Repairs/ Serviceability checks of 272 flood alarm sensors 3.23.2 Repairs/ Serviceability checks of 159 BP converters 3.23.3 Serviceability checks of PDCR and SPDCR control panels including renewal of perished/ brocken control cables, replacement of defective fuses, indication lamps
3.23.4 Proving of circuitory checks of alarm signal from respective flood sensors
1
-
-
... More
PUNJ & PUDS (MATERIAL COST)
-
-
-
... More
Operational check/ Defect rectification on PUNJ and PUDUS panel view erratic operation during exploitation.
6
-
-
... More
Tank level sensors ( MATERIAL COST)
-
-
-
... More
1.9.1. Serviceability checks of Russian make tank level sensors for fuel tanks, DA fuel tanks, Dirty oil and water tanks, feed water tanks and lub oil tanks. 1.9.2. Replacement of defective tank level sensors including removal, calibration and fitment. Qty - 52
1.9.3. Continuity checks of power and signal cabling of all sensors, replace if defective (Approx-500 mtrs)
1.9.4. Provisioning of centralisied monitoring system of tank level at PDCR/ SPDCR and followed by STW and commissioning Type of sensors are as follows:- 1.9.5. АД-4Р-Н (Upper level sensor) - qty – 141 1.9.6. АД-4М-О (Lower level sensor) - qty - 60 1.9.7. ДМ (Level measurement sensor) - qty – 10
211
-
-
... More
Kaspiy system(MATERIAL COST)
-
-
-
... More
Repairs/ Serviceability checks of solenoids. Replacement of defective ones. -20Nos 3.125.1 Check all service tallies and cable for correct securing.-1Set 3.125.2 Check that the control panel rubber seals/gaskets are in place and in good condition. 3.125.3.Check wiring/contacts/relays of the panels for wear/deterioration. Project specific defects to DYD for renewal/replenishment if necessary.-14Nos 3.125.4. Carry out repair /calibration of defective 37sensors/gauges at shop floor. -4Nos Serviceability of batteries:- Return all batteries in a filled and charged condition to the battery shop for maintenance-4Nos Capacity test of battery and repair as necessary -4Nos Preservation of battery / system -1Set
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements