Karnataka Slum Development Board Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Karnataka Slum Development Board - KSDB Tender

Opening Date9 Sep 2021
Closing Date24 Sep 2021
Tender Amount₹ 1,13,85,399 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
H Frame for mounting of GOS With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

18620

... More
11 KV class XLPE cable 3 core 95 sqmm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1020

-

798272.4

... More
RCC Hume pipe, 2000mm long, 150mm dia With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

20

-

6000

... More
Collars for RCC Hume pipe With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

20

-

1600

... More
Sand With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

50

-

85000

... More
Cable Covering Tiles 250 x 125 x 40 mm or 125 x 125 x 40mm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2000

-

20000

... More
Route Indication Stones With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

170

-

20400

... More
( PART -A Labour Cost ) PSC pole 8 mtrs long for stud With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

2236.8

... More
DP Structure using 9 mtrs RCC Pole With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

21468

... More
GOS Set 200 Amps S B With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

4200

... More
H Frame for mounting of GOS With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

1260

... More
11 KV class XLPE cable 3 core 95 sqmm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1020

-

48195

... More
RCC Hume pipe, 2000mm long, 150mm dia With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

20

-

1056

... More
Collars for RCC Hume pipe With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

20

-

1776

... More
Sand With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

50

-

388

... More
Route Indication Stones With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

170

-

15300

... More
Cable Trench Excavation, 1000*0.75*2 With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2017.5

-

547146

... More
Covering the cable with tiles With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.78

-

2679.77

... More
Spreading sand and forming with sand round the cable With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.995

-

12012.83

... More
(PART-B (LT) Materials cost) RCC Pole 8 mtrs Long With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

22

-

103532

... More
Spiral Earth Electrode With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

22

-

3630

... More
Numbering of Pole Using Blak and White Enamel Paint (Including Labour) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

22

-

1100

... More
RCC Hume Pipe, 2000mm long 150mm dia With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

45

-

13500

... More
Collars for RCC Hume Pipe With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

45

-

3600

... More
1.1 KV Class 3 Phase 3.5 core armoured LT UG Cable 120 sqmm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

3718

-

1499395.04

... More
Street Light metering Box (SMC) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

4505

... More
Cable covering Tiles 250 X 125 X 40 mm or 125 X 125 X 40mm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

120

-

1200

... More
Sand With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

422

-

717400

... More
Route Indication Stones With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

46

-

5520

... More
120 Sqmm Copper Terminals With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

269

-

25824

... More
120 Sqmm LT UG Cable Termination Kit (Outdoor Pothead) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

203

-

75719

... More
Bolts & Nuts of Various size With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

50

-

3150

... More
PVC Insulated Tape With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

70

-

980

... More
(PART-B (LT) Labour Cost ) RCC Pole 8 mtrs Long With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

22

-

24604.8

... More
Spiral Earth Electrode With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

22

-

1610.4

... More
Numbering of Pole Using Blak and White Enamel Paint (Including Labour) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

22

-

264

... More
RCC Hume Pipe, 2000mm long 150mm dia With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

45

-

1890

... More
1.1 KV Class 3 Phase 3.5 core armoured LT UG Cable 120 sqmm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

3718

-

91723.06

... More
Street Light metering Box (SMC) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

616.8

... More
Excavation of 11 KV/LT Cable trench 0.75x1.00mtr for Laying of Calbe. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

735.1

-

199359.12

... More
Refilling with sand all around the cable to a depth of 75MM width and 500 MM including cost of sand With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

238.92

-

14335.2

... More
Cable covering Tiles 250 X 125 X 40 mm or 125 X 125 X 40mm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

120

-

331.2

... More
Sand With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

422

-

509489.04

... More
Route Indication Stones With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

46

-

4140

... More
(ALLIED & METERS ) Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

700

-

245000

... More
Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

120

-

359964

... More
Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

21

-

99645

... More
Supplying and fixing Miniature Circuit brekaers on existing MCB distribution boards using necessary fixing materials and 'C" Type curve, indicator ON/OFF, energy cross-3 with Short Circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 6-32Amps SP. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1110

-

481740

... More
Earthing: Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

288

-

863913.6

... More
Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit with thermal Magnetic/Micro processor release and Earth Fault as per IS-13947. ( Icu = Ics)FOUR POLE 160Amps 25KA. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

72

-

612000

... More
Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20Amps single phase Class-1 Accuracy with Temper Proof Energy Meter. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1043

-

1199450

... More
Providing & Supplying Office Table made of SS 304 table top material Wooden 2.5 X 3 feet With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

4

-

39200

... More
(STP (PART- A) 11 KV LINE) 11 KV class XLPE Cable 3 core 95 Sq.mm including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.1

-

77103.74

... More
Earth work excavation for 11Kv cable trench 0.75 x 1.00 Mtr for laying of cable With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

30

-

7380

... More
Cable Termination Kit Outdoor HS Type ; Suitable for 95 Sqmm Cable including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

10939.6

... More
Cable Termination Kit indoor HS Type Suitable for 95 Sqmm Cable including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

3

-

15551.4

... More
Cable covering tiles 250x125x40 mm or 125x125x40 mm including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

40

-

544

... More
RCC Hume Pipe, 2000 mm Long, 150 mm Dia including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

1740

... More
Sand including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

10

-

17540

... More
Collars for RCC Hume Pipe including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

400

... More
Spreading Sand and forming with Sand round the cable With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.04

-

482.93

... More
Gl Pipe, 100 mm Dia for drain crossing, cable Raising etc including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

16

-

17632

... More
Route and Joint Indicating Stones including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

403.2

... More
Earthirg Materials including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

1964.6

... More
9 Mtr RCC Double Pole Structure complete Including 5 Kg, 8SWG, GI Wire for Structure Grounding. including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

21743.6

... More
11KV Polymeric Pin Insulator With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

6

-

1080

... More
Rabbit ACSR Conductor for jump including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.15

-

5990.97

... More
Horizontal-X-arms with HTST Support, clamps, B&N including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

1042.4

... More
11KV Polymeric Pin Insulator With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

6

-

1080

... More
45KN Disc insulators With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

6

-

1728

... More
Bolts & Nuts of verious sizes. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

10

-

755

... More
11kv GOS 200 A single break including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

7926.2

... More
H Frame for mounting GOS including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

3903.2

... More
((PART- B) ERECTION OF 1x250 KVA DTC) 11kV HT Metering Panel 3 CT 3 PT for 3 Phase 4 Wire Metering With Transparent Cover TTB, with 30x8mm Cu Bus bars (HT Metering Box fabricated out of 3mm MS Sheet duly epoxy powder coated, Without Meter) including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

137033.6

... More
Load break switch including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

92036.8

... More
HT Yard fencing 15x25sqft including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

103720

... More
Jelly spreading including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

10

-

83600

... More
Earthing materials pipe type for grounding including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

4

-

7858.4

... More
Caution/Danger Board as per Drawing NO: BESCOM/GM/CP/40 DT: 24.10.07 including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

209.6

... More
GI Wire 8 SWG With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

5

-

316.45

... More
Guy wire 7/10 SWG With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

10

-

651.4

... More
Construction of Cement Platform (1.5x1.5x1.2) for erection of 250 KVA DTC including all material and labour. With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

30230.4

... More
HT Electronic Tri - Vector Meter SA, Class-0.5Accuracy including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

3357.2

... More
GSM modem with connecting cable for remote Communicating capabilities including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

17443.8

... More
TRANSFORMER : Construction of platform with size stone, cement concert for erection of 500 KVA Transformer/Metering cubicle/Heavy Equipment. Construction of platform (1.5x1.5x1.2) mtr in (size stone, for erection of transformers/Heavy equipment including all materials, labour. Excavation of (1.5x1.5x1) mt pit for foundation providing and laying cement concrete 1:4:8 for foundation laid in 10 cm thick layers, well compacted curing etc., complete providing & construction of stone masonry 0.9m below ground level and 1.2m above ground level neatly hammer dressed in cement morter 1:6.Providing and Laying cement concrete slab @ 1.5x1.5x0.10Mtr with cement concrete of 1:2:4 mix forming & cutting complete, providing pointing to stone masonary in cement morter 1:3 afterracking joint & nisely lining curing etc, With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

26401

... More
Distribution Transformers 3 Phase., 11kV / 433V - Stacked Core with Oil as per 15-1180 (Part-1):2014 160kVA, Copper winding, Star 2 (5 Star)(Including GST) with rubber mat. including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

438500

... More
Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/D Dt : 24-10-07. including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

3

-

10893

... More
Caution/Danger Board as per “Drawing No.BESCOM/GM/CP/40/ Dt: 24-10-07. including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

296

... More
Anti Climbing Device (12mtrs/1Kg GI Barbed Wire) Lumpsum including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

252

... More
9KV 5 SkA LA Metal Oxide Ceramic type with GROUND DISCONNECTOR (Dwg No.Bescom/om/oses/26 Dtd: 24.11.2018) including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

1895

... More
SWITCHGEAR : LT Distribution Box for 100/250 kVA DTC with MCCB's (smc) including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

18046

... More
Al Lead Wire-120 Sqmm including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

45

-

9450

... More
Copper lugs-120 Sqmm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

18

-

1386

... More
PG Climps Rabbit to 120 Sqmm With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

4

-

748

... More
Space for DTC wiring With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

8

-

328

... More
Fish plate with necessary climps bolts & nuts etc Complete (Galvanised) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

350

... More
11KV Class XLPE Cable 3 core 95 sqmm Round ARMOURED including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.05

-

39166.35

... More
11kV Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3x95 Sqmm including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

2

-

10628

... More
RCC Hume Pipe, 2000 mm Long, 150 mm Dia including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

4

-

1539.2

... More
Collars for RCC hume Pipe including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

4

-

352

... More
Cable covering Tiles 250x125x40 mm or 125x125x40mm including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

50

-

1931.5

... More
GI Pipe, 100 mm Dia for drain crossing cable Raising including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

18

-

23256

... More
Rivers sand (550M x 0.6m x 0.2) including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

1

-

1800.61

... More
Cable trench excavation 1000x0.6x1=600, Ordinary soil With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

84

-

18984

... More
Labour Charges for laying of cable in trench With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.15

-

5906.55

... More
Refilling and consolidation with available earth mud from excavation (220mx0.60x1) With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

84

-

4200

... More
Spreding the sand and forming sand round the cable With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.024

-

241.46

... More
PVC Pipe 100mm dia including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

12

-

2376

... More
1.1kV LT XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath armoured UG LT cable as per IS 1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average + 5% and resistivity 14 Ohms/ KMS (MAX) as per IS 3975 240 Sqmm, 3.5 Core, (30 GI Strips - 4.0 x 0.8mm) including labour With all Lead and Lift Loading and unloading as per the direction of engineer in charge. ---- With all Lead and Lift Loading and unloading as per the direction of engineer in charge.

0.1

-

76914.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.