Karnataka Cooperative Milk Producers Federation Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Karnataka Cooperative Milk Producers Federation Limited - KMF Tender

Opening Date8 Jan 2021
Closing Date30 Jan 2021
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing chain link fencing 50mm size of 8 gauge properly stretched between existing rectangular poles and fixed with suitable bolts and nuts the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer- in-charge of work including two coats of approved quality paint over one coat of shop paint, including cost of material labour HOM complete as per the specifications.( Item No.37.3, Page No.266 PWD SR 2018-19,)

1002

-

752251.5

... More
Providing and fixing M.S. Block pipe of 38 mm dia of heavy gauge of 14 including removing the bends, cutting the pipe and fixing the pipe in between existing the two verticle poles (M.S rectangular poles) and spot welding the chain link with M.S block pipe including cost of all matireals wastage in cutting and scafolding wherever necesary with all lead and lift as directed by the Engineer in- charge of work etc., complete including two coats of approvedquality paint over one coat of shop paint, including cost of matireals, labour,HOM complete as per specifications.( Item No.37.4, Page No.266 PWD SR 2018-19,)

1336

-

572342.4

... More
ISLAND and Flowering plants:- Desilting tank bed /Feeder channel in dry condition by excavating the deposited bed material and loading the same to transport vehicle (exculding cost of transportation ) including cost of all machinery , labour etc .,complete with lead upto 50m and all lifts up to 2.0 m. (Item No. 6.54.1; Page No. 115 as per MI SR 2018-19).

300

-

12900

... More
Desilting tank bed/Feeder channel in dry condition by excavating the deposited bed material and disposing off the same as directed including cost of all machinary, labour, etc., complete with lead upto 1 Km and all lifts.(Item No. 6.54.2; Page No. 115 as per MI SR 2018-19).

2700

-

197100

... More
KSRRB 300-64.1.Extra for watering the earth to bring the earth upto required optimum moisture content manually including cost of all labour complete as per specifications. Morth/ Chapter3. (Item No.19.71 Page No. 148 of PWD SR for 2018-19)

2700

-

34020

... More
KSRRB 300-64.1.Extra for rolling to specification with the use of vibratory roller when earth is at suitable moisture content with desired field density not less than 95% of maximum dry density (modified heavy proctor test) including HOM of machineries complete as per specifications.MORTH/ Chapter 3.(Item No.19.73 Page No. 148 of PWD SR for 2018-19)

2700

-

36855

... More
Constructing and Formation of Road embankment using murrum from approved borrow area including excavation of side gutters, spreading collected soil layers of 200 to 250 mm thickness, sectioning the surface to specified chamber and sides to the required slope, including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering, and compaction by power roller to achieve the specified density loading and unloading charges, all lead and lifts etc., complete as per specifications.(Item No. 6.73 Page No. 117-118 of Water Resources Dept -Minor Irrigation- SR for 2018-19)

718.48

-

133637.28

... More
Earth work in excavation for foundation of structures like culvert, retaining wall etc. as per technical specification, including setting out, construction of shoring and bracing, dressing of sides and bottom, back filling with approved material, disposal of balance earth as per specification, including cost of labour, HOM etc coplete. do-in all kinds of soil by mechanical means

45.9529

-

2171.27

... More
KSRRB M2100 PCC 1 KSRRB M2100-10. Plain cement concrete M10 with OPC cement @ 220kgs, with crushed 40mm and down size graded granite metal coarse aggregates @0.84cum and fine aggregates @ 0.56cum, in foundation mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days including cost of all materials, labour, HOM curing, form works, scaffolding and centering complete as per Specifications. MORTH Specification No. 2100

19.4324

-

104244.14

... More
KSRB 5.2-3 : Providing and constructing granite / trap / basalt size stone masonry in foundation with cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 9)

50.413

-

256198.87

... More
Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts. As per WRD(MI) SR for 2018-19 vide item no 3.54. page 74.

1131.12

-

309926.88

... More
KSRRB M300-8.1. Planting and Maintaining of Flowering Plants and Shrubs -A) Planting flowring plants and shrubs in central varge MORTH Specification No. 307

788

-

172099.2

... More
KSRRB M300-8.1. Planting and Maintaining of Flowering Plants and Shrubs -A) Planting flowring plants and shrubs in central varge MORTH Specification No. 307 B) Maintenance of flowering plants and shrubs Km 1,54,837.00 in central yerge for one year.(Item No.19.87 Page No.149 of PWD SR for 2018-19)

0.29

-

66607.24

... More
KSRRB M300-9. Planting of trees by the road side (Avenue trees) in 0.60 �.Each 781.00 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year complete as per specifications. MORTH Specification No. 307(Item No.19.88 Page No.149 of PWD SR for 2018-19)

25

-

27562.5

... More
Making Lawns including ploughing and breaking of cold,removal of rubbish,dressing and supplying doobs grass roots and planting at 15cm apart,including supplaying and spreading of farm yard manure at rate of 0.18 cum per 100sqm complete as per specification MORTH Specification No 307 and maintainance of lawns or turfing of slopes(rough grassing) for a period of one year including watering etc complete as per specification. MORTH Specification No 307 (Item No.19.80+19.81 Page No.148 of PWD SR for 2018-19)

7549.97

-

126839.5

... More
Maintaing Lawns

7550.84

-

816623.35

... More
Point View: KSRB 2-1.1 : Earthwork in surface excavation in ordinary soil for levelling and lowering the ground manually (other than foundation of buildings, culverts, road drains and trenches of pipe lines and cables) and removing the excavated stuff to a distance not exceeding 50m and lift upto 1.5m excavated surface levelled and neatly dressed, disposed earth to be levelled including breaking of clods and neatly dressed as per specifications. Specification No. KSRB 2-1.1( Item No.2.1, Page No.6 PWD SR 2018-19,)

230.58

-

60285.14

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1 :3:6 with ope cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @O.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery,� curing complete as per specifications.( Item No.4.2, Page No.13 PWD SR 2018-19,)

17.2935

-

95366.74

... More
KSRB 4-1.5 : Providing and laying in position plain cement concrete of mix M20mm with OPC cement @300kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregates @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation and plinth, and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specification. Specification No. KBS 4.1, 4.2.( Item No.4.5, Page No.13 PWD SR 2018-19,)

96.4744

-

550150.09

... More
KSRB 4.2.1 : Providing and laying in position reinforced cement concrete of of design mix M25 with OPC cement @340kgs with 20mm and down size graded granite metal coares aggregats @0.70cum and fine aggregates @0.47cum with superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, vibrated for all works in foundation footings, pedastals, retaining walls, return walls, walls(any thickness including attached pilasterspillars, posts, struts, buttreswses, bec blocks, anchor blocks, & plinths etc., including cost of all materials, labour, HOM of curing , complete but excluding cost of reinforcement asper specifications. Specification No. KBS 4.1, 4.6 .( Item No.4.10, Page No.14 PWD SR 2018-19,)

298.94

-

1863861.01

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

23.82

-

1758448.38

... More
KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of mattar cost of materials labour, complete as per specifications. (Item No.15.53.1 Page No. 120 of PWD SR for 2018-19)

1562.14

-

145981.98

... More
Providing and fixing of clay tiles for cladding tiles of size 230x75x10mrr. thick on 12mm thick cement mortar 1 :3 & jointed with Adhesive I cement slurry over rough plaster suriace excluding cost of rough plasterd suriace and the surface is painted with red apex paint and black apex paint into the groves. Including cost of all materials, mortar, labour, curing etc., complete as per specification (Item No.14.68 Page No.113 of PWD SR for 2018-19)

113

-

177975

... More
2 Nos Construction of Arch and gate:- Earth work excavation for foundation of structures soil in Soft Rock/ Ordinary Rock (Without Blasting) upto 3mtrs by mechanical means as per drawing and technical specification including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilizing/ transporting the remaining earth upto 1.00Km lead. including cost of labour, materials and HOM etc., complete.( Item No.2.23.2, Page No.8 PWD SR 2018-19,)

13.9392

-

995.26

... More
Earth work excavation for foundation of structures upto 3 mtrs. by mechanical means as per drawing and technical specification, . including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilising / transporting the remaining earth upto 1.00km lead. including cost of labour, materials and HOM of machineries etc., complete.( Item No.2.23.1, Page No.8 PWD SR 2018-19,)

3.4848

-

190.27

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1 :3:6 with ope cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @O.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery,� curing complete as per specifications.( Item No.4.2, Page No.13 PWD SR 2018-19,)

1.089

-

6005.4

... More
KSRB 4.2.1 : Providing and laying in position reinforced cement concrete of of design mix M25 with OPC cement @340kgs with 20mm and down size graded granite metal coares aggregats @0.70cum and fine aggregates @0.47cum with superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, vibrated for all works in foundation footings, pedastals, retaining walls, return walls, walls(any thickness including attached pilasterspillars, posts, struts, buttreswses, bec blocks, anchor blocks, & plinths etc., including cost of all materials, labour, HOM of curing , complete but excluding cost of reinforcement asper specifications. Specification No. KBS 4.1, 4.6 .( Item No.4.10, Page No.14 PWD SR 2018-19,)

20.85

-

129997.67

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

1.668

-

123135.68

... More
KSRB 4-6.1 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specidfication No. KBS 4.6.2(Item No.4.28, Page No.18 PWD SR 2018-19,)

36

-

9941.4

... More
KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for columns, pillars, post and struts, square / rectangular / polygon in plan including cost of all materials, labour complete as per specification No KBS 4.6.2 (Item No.4.32, Page No.16 PWD SR 2018-19,)

77.4

-

37059.12

... More
KSRB 2.3 : Filling available excavated earth (Excluding rock) in sides of foundation upto plinth in layers not exceeding 20 cms. In depth,compacting each deposited layer by ramming after watering with lead upto 50m. and lift upto 1.5m. including cost of all labour complete as per specifications. No. KBS 2.9 (Item No.2.10, Page No.7 PWD SR 2018-19,)

4

-

844.2

... More
KSRB 15.3.1 Providing 20mm thick cement plaster in single coat with cement mortar 1:3, to stone masonry & concrete surface including rounding off corners wherever required smooth rendering,including Providing and removing scaffolding, cost of materials labour, curing etc.,(Item No.15.18 Page No. 116 of PWD SR for 2018-19)

77.4

-

23080.68

... More
KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade with primer to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications.,(Item No.15.53.1 Page No. 120 of PWD SR for 2018-19)

77.4

-

7233.03

... More
Providing ond fixing M.S. Gate as per Chief Architect Drawing, using 50 mm x 50 mm 14 guage M.S. hollow pipe frame work bent to ornamenal shape as shown in the drawing and 35mm x 6mm and 16 x 16mm Square rods for verticals altematively spaced at 4cms clc in two halves and 40mmx6mm M.S. flats for horizontal member and at the top cast iron spikes are provided at alternate vertical members as shown in the drawing etc., complete. All the steel surface should be thoroughly cleaned free of rust and painted with anti corrosive paint (shop paint) etc., complete. The work includes cost of all materials, labour charges for all items ofwork, hire charges for welding, cutting and grinding equipment, and electricity charges, with lead and lift, loading and unloading charges, etc., complete as per specification.(Item No.7.37 Page No. 45 of PWD SR for 2018-19)

45

-

142317

... More
Construction of Foot Bridge: Earth work excavation for foundation of structures upto 3 mtrs. by mechanical means as per drawing and technical specification, . including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilising / transporting the remaining earth upto 1.00km lead. including cost of labour, materials and HOM of machineries etc., complete.( Item No.2.23.1, Page No.8 PWD SR 2018-19,)

39.15

-

2137.59

... More
KSRB 4-1.5 : Providing and laying in position plain cement concrete of mix M20mm with OPC cement @300kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregates @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation and plinth, and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specification. Specification No. KBS 4.1, 4.2.( Item No.4.5, Page No.13 PWD SR 2018-19,)

115.05

-

656078.38

... More
KSRB 4.2.1 : Providing and laying in position reinforced cement concrete of of design mix M25 with OPC cement @340kgs with 20mm and down size graded granite metal coares aggregats @0.70cum and fine aggregates @0.47cum with superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, vibrated for all works in foundation footings, pedastals, retaining walls, return walls, walls(any thickness including attached pilasterspillars, posts, struts, buttreswses, bec blocks, anchor blocks, & plinths etc., including cost of all materials, labour, HOM of curing , complete but excluding cost of reinforcement asper specifications. Specification No. KBS 4.1, 4.6 .( Item No.4.10, Page No.14 PWD SR 2018-19,)

15.54

-

96890.35

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

13.3698

-

986990.06

... More
Construction of Toilet: KSRB 2-1.1 : Earthwork in surface excavation in ordinary soil for levelling and lowering the ground manually (other than foundation of buildings, culverts, road drains and trenches of pipe lines and cables) and removing the excavated stuff to a distance not exceeding 50m and lift upto 1.5m excavated surface levelled and neatly dressed, disposed earth to be levelled including breaking of clods and neatly dressed as per specifications. Specification No. KSRB 2-1.(a)2.3.5( Item No.2.3, Page No.6 PWD SR 2018-19,)

138.384

-

43445.66

... More
KSRB 4-1.3 : Providing and laying in position plain cement concrete of Mix 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coares aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM curing complete as per specification. Specification No. KBS 4.1, 4.2 ( Item No.4.3, Page No.13 PWD SR 2018-19,)

4.8384

-

25980.76

... More
SRB 5.2-3 : Providing and constructing granite / trap / basalt size stone masonry in foundation cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications.( Item No.5.6, Page No.25 PWD SR 2018-19,)

32.256

-

163924.99

... More
KSRB 6-6.1 : Providing and constructing burnt brick masonry with approved quality of modular bricks of standard size of class designation 7.5Newton per sqmm (Machine moulded Wirecut bricks ) with cement mortar 1:6 for basement and superstructure including cost of materials, labour charges, scaffolding, curing complete as per specifications. specification No. KBS 6.2( Item No.6.19, Page No.30 PWD SR 2018-19,)

25.8935

-

293659.48

... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460cum, with superplastisiser @3lts confirming to IS 9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls ( any thickness ) including attached pilasters, columns, pillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6,( Item No.4.11, Page No.14 PWD SR 2018-19,)

15.8175

-

95996.41

... More
KSRB 4-6.3:Providing & removing centering, shuttering, strutting, propping etc., & removal of form work for flat surface such as suspended floors, roofs, landings, balconies & likes, thickness above 200 mm including cost of all materials, labour complete as per specification. specification No. KBS 4.6.2 (Item No.4.30, Page No.16 PWD SR 2018-19,)

122.6953

-

57844.7

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

1.9

-

140262.46

... More
Providing and laying flooring using prepolished, water cut / gang saw 19mm thick granite laid over bed 20mm thick 1:4 cm & jointed with neat cement slurry mixed with pigment to mach shade of granite slabs including laying POP on finished surface and cleaning the surface, including the cost of all materials and labours etc., complete as per specifications. Using silver grey granite / Multy Red / Ruby Red / Black / Hassan green / River Pink granite of width not less than 1200mm (Item No.14.47.1, Page No.109 PWD SR 2018-19,)

54

-

155074.5

... More
Providing skirting, dadioing, rises of steps with white glazed tiles on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using galzed tiles of approved make and size including cost of materials, labour, complete as per specifications. Specification No. KBS 14.16.14.17 colour glazed tiles 30x60 cms 6mm thick with border of size 30 x 10cms.(Item No.14.41.2, Page No.108 PWD SR 2018-19,)

181.636

-

310870.01

... More
KSRB 14-18.1 : Providing skirting, dadoing, rises of steps using marble slabs with machine cut edges upto 25mm thick and not exceeding 30 cms. height on 10 mm. thick cement mortar 1:3 and jointed with white cement slurry over existing rough plaster surface including cost of material, labour complete as per specifications. Specification No.KBS 14.19 (Item No.14.42, Page No.109 PWD SR 2018-19,)

3.04

-

12343.46

... More
KSRB 11-2 Providing and fixing white vitreous china clay, water closet Orissa pattern of size 580 x 440mm with integral type footrests, 100mm S or P tap, 10 liter low level, P.V.C flushing cistern (all are approved make) with fittings, C.I / M.S brackets, 32mm diameter flush pipe fitting and clamps, overflow arrangements with special and 25mm brackets. Cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications. Specification No. KBS 11) (Item No.12.2, Page No.79 PWD SR 2018-19,)

8

-

35481.6

... More
KSRB 11-7.2 Providing and fixing white vitreous china clay, flat back , lipped front urinal basin of 430x260x350mm in the range of two 7.5 liter P.V.C with automatic flushing cistern, C.I / M.S brackets, standard flush pipe and C.P. brass spreaders with brass unions and G.I. clamps painting of fitting and brackets, cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications. Specifications No. KBS 11 (Item No.12.8, Page No.80 PWD SR 2018-19,)

5

-

21866.25

... More
KSRB 11-11.9 Providing and fixing white vitreous china clay, Surgeon type wash basin size 660 x 460mm with single 15mm C.P brass pillar tap with single elbow operated lever, C.I / M.S brackets, cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications. KBS11 (Item No.12.31, Page No.83 PWD SR 2018-19,)

4

-

17144.4

... More
KSRB 7.4 : Providing and fixing 1mm thick M.S. sheet garage door with frame and diagonal braces of size 40x40x6 mm angle Iron, using M.S. flats 30x6 mm for diagonal braces and central cross pieces 3.15mm thick M.S. Gusset plates at the junctions and corners, with handles, stoppers and locking arrangements etc., including applying a priming coat of red lead paint cost of materials, labour, HOM of machinery complete as per specifications. 1 double leaf door of size 2.4x2.4m. Specification No. KBS 7.9 / 7.12

19.4

-

43449.21

... More
KSRB 12-8.1 : constructing brick mansonry inspection chamber 455x610mm, and 450mm depth, ( clear inside dimension) for single pipe line, using table moulded non moulder bricks of class designation 50 in cement mortar 1:5, C.I cover with frame (light duty ) 455x610mm internal dimension, total weight of cover with frame to be not less than 38kg (weight of cover 23kg ang weight of frame 15kg) RCC tp slab with cement concrete M15 mix 20mm and down size granite metal, foundation concrete M5 with 40mm and down size granite metal inside plastering 12mm thick cement mortar 1:3, finish smooth with a floating coat of cement on walls and bed concrete complete as per standard design including cost of materials, labour charges, curing, complete as per specification. Specification No.KBS (Item No.11.50.1, Page No.75 PWD SR 2018-19,)

6

-

44622.9

... More
KSRB 7.8 : Providing and fixing in position in cement concrete 1:3:6 steel glazed windows and ventilators side hung/top hung 2/3 openable 1/3 fixed as per approved drawings using Z angles of 25x33x3mm, weighing 1.419 kg/m both for outer and inner frames and central mullion section of size 25x46x3mm, weighing 2.28kg/m all duly providing T section 19x19x3mm weighing 0.839 kg/m for glazing of windows, not more than 34 cms. c to c including providing and fixing 4mm. thick reeded glass with teakwood beading of required size, all steel sections should confirm to I.S 7452:1990, 4nos. of holdfasts of approved size, section should be cut to length welded and grinded electrically subdividing frames of unit shall be tenonned and revetted into the frames electrically. All the steel surface shall be throughly cleaned free of rust and painted with one coat of anti-corrosive paint and finishing two coats of ready mix paint of approved colour and make including cost of materials, fixtures, labour charges and HOM of machinery complete as per specifications.(Item No.7.8, Page No.34 PWD SR 2018-19,)

1.08

-

3786.43

... More
KSRB 15.1.3 Providing ruled pointing to coursed stone masonry with cement mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost of materials, labour, curing complete as per specifications.(Item No.15.3, Page No.115 PWD SR 2018-19,)

31.59

-

4710.07

... More
KSRB 15.3.1 Providing 12mm thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. (Item No.15.9, Page No.115 PWD SR 2018-19,)

211.92

-

46505.84

... More
KSRB15-13 : Applying of distemper KSRB 15-13.1 : Providing and applying one coat distemper primer of approved brand on wall surface after throughly brooming the surface to remove all dirt, dust, mortar drops and other foreign matter including preparing the surface, even and sand paper smooth, cost of materials, labour, complete as per specifications. wall surface-.(Item No.15.46.1, Page No.118 PWD SR 2018-19,)

259.92

-

9552.06

... More
KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of mattar cost of materials labour, complete as per specifications. (Item No.15.53.1 Page No. 120 of PWD SR for 2018-19)

85.77

-

8015.21

... More
Construction of Securty Room : -KSRB 2-1.1 : Earthwork in surface excavation in ordinary soil for levelling and lowering the ground manually (other than foundation of buildings, culverts, road drains and trenches of pipe lines and cables) and removing the excavated stuff to a distance not exceeding 50m and lift upto 1.5m excavated surface levelled and neatly dressed, disposed earth to be levelled including breaking of clods and neatly dressed as per specifications. Specification No. KSRB 2-1.(a)2.3.5( Item No.2.3, Page No.6 PWD SR 2018-19,)

58.3074

-

18305.61

... More
KSRB 2.6: Providing and filling sand in foundation to required depth for sub soil treatment including watering ramming with all lead & lift complete as per specifications. specification No. KBS 2.10.2.(Item No.2.13 Page No. 7 of PWD SR for 2018-19)

26.991

-

50247.8

... More
KSRB 4-1.3 : Providing and laying in position plain cement concrete of Mix 1:4:8 with OPC cement @ 180kgs, with 40mm and down size graded granite metal coares aggregates @0.85cum and fine aggregates @ 0.57cum machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM curing complete as per specification. Specification No. KBS 4.1, 4.2 ( Item No.4.3, Page No.13 PWD SR 2018-19,)

6.2982

-

33819.44

... More
KSRB 4-6.3:Providing & removing centering, shuttering, strutting, propping etc., & removal of form work for flat surface such as suspended floors, roofs, landings, balconies & likes, thickness above 200 mm including cost of all materials, labour complete as per specification. specification No. KBS 4.6.2 (Item No.4.30, Page No.16 PWD SR 2018-19,)

158.232

-

74598.48

... More
KSRB 4.2.1 : Providing and laying in position reinforced cement concrete of of design mix M25 with OPC cement @340kgs with 20mm and down size graded granite metal coares aggregats @0.70cum and fine aggregates @0.47cum with superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms. thick, vibrated for all works in foundation footings, pedastals, retaining walls, return walls, walls(any thickness including attached pilasterspillars, posts, struts, buttreswses, bec blocks, anchor blocks, & plinths etc., including cost of all materials, labour, HOM of curing , complete but excluding cost of reinforcement asper specifications. Specification No. KBS 4.1, 4.6 .( Item No.4.10, Page No.14 PWD SR 2018-19,)

26.5778

-

165709.93

... More
KSRB 4.2.10: Providing and laying in position reinforced cement concrete of design mix M 20 with OPC cement @ 24Kgs, with 12mm & down size graded granite metal coarse aggregates @ 0.05175 cum & fine aggregates @ 0.0345 cum with superplastisiser @ 0.225lts, machine mixed, well compacted for plain chajja of 7.5 cms. Average thickness, upto ground floor level, including cost of all materials, labour, HOM finishing, curing, complete but excluding cost of reinforcement as per specifications. Specification NO. KBS 4.1, 4.6.(Item No.4.19 Page No. 15 of PWD SR for 2018-19)

6.525

-

3035.1

... More
KSRB 5.1-3:Providing & constructing granite/trap/basalt rubble stone masonry in foundation with cement mortar 1:6 (uncoursed), bond stones at 2m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.12.(Item No.4.19 Page No. 15 of PWD SR for 2018-19)

15.0315

-

36711.43

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1 :3:6 with ope cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @O.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery,� curing complete as per specifications.( Item No.4.2, Page No.13 PWD SR 2018-19,)

2.1866

-

12058.22

... More
KSRB 6-6.1 : Providing and constructing burnt brick masonry with approved quality of modular bricks of standard size of class designation 7.5Newton per sqmm (Machine moulded Wirecut bricks ) with cement mortar 1:6 for basement and superstructure including cost of materials, labour charges, scaffolding, curing complete as per specifications. specification No. KBS 6.2( Item No.6.19, Page No.30 PWD SR 2018-19,)

14.3057

-

162241.66

... More
KSRB 15-3.7: Providing 18mm thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing, complete as per specifications.(Item No.15.15 Page No. 116 of PWD SR for 2018-19)

171.915

-

49098.92

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

2657.783

-

196197.54

... More
KSRB 14.10-2: Flooring with 20mm thick polished shahabad slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, including cost of materials, labour, curing, polishing complete as per specifications. Specification No. KBS.(Item No.14.16 Page No. 105 of PWD SR for 2018-19)

35.559

-

51300.97

... More
KSRB 15.10.1: Providing white washing to new wall surface in two coats with lime of approved quality, to give an even shade including cost of materials, labour, complete as per specifications.(Item No.15.38 Page No. 117 of PWD SR for 2018-19)

171.915

-

2166.13

... More
KSRB 7.5: Providing & fixing 1mm thick M.S. sheet garage door with frame and diagonal braces of size 40x40x6 mm angle Iron, 3.15 mm thick M.S. Gusset plates at the junctions and corners, with handles, stoppers and locking arrangements etc., including applying a priming coat of red lead paint cost of materials, labour, HOMcomplete as per specifications. Double leaf door of Size 2.4mx2.4m Specification No. KBS 7.9/7.12.(Item No.7.4 Page No. 33 of PWD SR for 2018-19)

8.62

-

19305.78

... More
KSRB 15-18.2: Providing and applying enamel metal paint two coats (excluding priming coat) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications.(Item No.15.74 Page No. 123 of PWD SR for 2018-19)

8.4

-

837.9

... More
Improvement to Tail Channel: Earth work excavation for foundation of structures upto 3 mtrs. by mechanical means as per drawing and technical specification, . including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilising / transporting the remaining earth upto 1.00km lead. including cost of labour, materials and HOM of machineries etc., complete.( Item No.2.23.1, Page No.8 PWD SR 2018-19,)

1501.25

-

81968.25

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1 :3:6 with ope cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @O.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery,� curing complete as per specifications.( Item No.4.2, Page No.13 PWD SR 2018-19,)

22.5

-

124078.5

... More
Providing and laying insitu vibrated M-20(28 days cube compressive strength not less than 20 N/sqmm) grade cement concrete using 40mm downsize approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labours,formwork, cleaning,batching, mixing, placing in position, levelling, vibrsting,finishing,curing etc., complete with initial lead upto 50m and depth of foundation upto 6m from surface.(Cement content 270kg/cum with use of super plasticizer).(Item No. 3.10; Page No. 65 as per MI SR 2018-19).

109.6

-

592388

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

4.384

-

323637.18

... More
Improvements To Feeder Channel : Earth work excavation for foundation of structures upto 3 mtrs. by mechanical means as per drawing and technical specification, . including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilising / transporting the remaining earth upto 1.00km lead. including cost of labour, materials and HOM of machineries etc., complete.( Item No.2.23.1, Page No.8 PWD SR 2018-19,)

40

-

2184

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1 :3:6 with ope cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @O.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery,� curing complete as per specifications.( Item No.4.2, Page No.13 PWD SR 2018-19,)

4

-

22058.4

... More
Providing and laying insitu vibrated M-20(28 days cube compressive strength not less than 20 N/sqmm) grade cement concrete using 40mm downsize approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labours,formwork, cleaning,batching, mixing, placing in position, levelling, vibrsting,finishing,curing etc., complete with initial lead upto 50m and depth of foundation upto 6m from surface.(Cement content 270kg/cum with use of super plasticizer).(Item No. 3.10; Page No. 65 as per MI SR 2018-19).

15.6

-

84318

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

0.624

-

46065.15

... More
Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts. As per WRD(MI) SR for 2014-15 vide item no 3.54. page 76.

156

-

42744

... More
Waste weir Improvements: KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460cum, with superplastisiser @3lts confirming to IS 9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls ( any thickness ) including attached pilasters, columns, pillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6,( Item No.4.11, Page No.14 PWD SR 2018-19,)

15

-

91035

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.

0.75

-

55366.76

... More
2Nos Drilling of Bore well: Sinking of borewell of 165mm dia clear using super fast hydraulic rig of capacity 300/330 PSIG & above 1100/1200 CMF & above in all strata including over burden upto 20M preparing and submitting strata chart/Borelog, Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicals, crew charges and cost of consumable etc., complete including yield testing at the final depth with minimum working of compressor for one hour (Excluding cost of casing pipes, collars and etc., complete., a) 0.00 to 50.00 Mtr

100

-

34700

... More
Sinking of borewell of 165mm dia clear using super fast hydraulic rig of capacity 300/330 PSIG & above 1100/1200 CMF & above in all strata including over burden upto 20M preparing and submitting strata chart/Borelog, Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicals, crew charges and cost of consumable etc., complete including yield testing at the final depth with minimum working of compressor for one hour (Excluding cost of casing pipes, collars and etc., complete., b) 50.00 to 100.00 Mtr

100

-

44200

... More
Sinking of borewell of 165mm dia clear using super fast hydraulic rig of capacity 300/330 PSIG & above 1100/1200 CMF & above in all strata including over burden upto 20M preparing and submitting strata chart/Borelog, Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicals, crew charges and cost of consumable etc., complete including yield testing at the final depth with minimum working of compressor for one hour (Excluding cost of casing pipes, collars and etc., complete., c) 100.00 to 150.00 Mtr

100

-

45600

... More
Sinking of borewell of 165mm dia clear using super fast hydraulic rig of capacity 300/330 PSIG & above 1100/1200 CMF & above in all strata including over burden upto 20M preparing and submitting strata chart/Borelog, Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicals, crew charges and cost of consumable etc., complete including yield testing at the final depth with minimum working of compressor for one hour (Excluding cost of casing pipes, collars and etc., complete., b) 150.00 to 200.00 Mtr

100

-

53600

... More
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.(AS per RWS SR 19-20 item no.10.014.(f) pg no.62)

48

-

59712

... More
Geophysical Investigation of site for sinking Borewell Geophysical Investigation of site for sinking Borewell for supplying drinking water to the habitation either through a hand pump, Mini Water Supply scheme, or Piped Water Supply Scheme by vertical electrical sounding by adopting venner or Schlumberger's method, including reconnaissance survey of geological formation, geophysical investigation of existing ground water in the vicinity, its quality, quantity & acceptability of the users indicating the location of site, recommended depth of casing pipe required to seal the top unconsolidated formation incluing an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instrument and accessories to work site, engaging technical personal and labour required etc., complete (AS per RWS SR 19-20 item no.13.04. pg no.104)

2

-

7530

... More
Out Side Pipe line: Earth work excavatoin for water Supply & Sanitary lines, Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification, including setting out, construction of shoring, strutting, barricading, danger lighting, bracing, using sight rails & boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench, including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work. in the following strata classifications by Mechanical Means. (RWS SR / 2019-20,p.No.3,I.No.2.23.1)

97.2

-

12636

... More
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.90mm KSC (RWS SR / 2019-20,p.No.61,I.No.10.01.1.c)

50

-

10500

... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) Note: Add Rs. 203.00 / cum for earth obtained from borrow pits. (RWS SR / 2019-20,p.No.8,I.No.2.25)

97.2

-

10011.6

... More
Supplying,laying,jointing ,testing and commissioning of G.I. Pipes conforming to IS 1239:1990 with latest amendments, including fixing Collars, Elbows, Tees, bends, Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot, including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) (RWS SR / 2019-20,p.No.64, I.No.10.04.1(g))

1080

-

471960

... More
Pumping Machinary: Supply of Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034 3Phase, SS Bowl & Impeller with Low volt Motor and as per specifications 6.50 HP - 90 LPM @ 132 m = 12 STG Outlet Dia - 2.00" (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.02.4(g) page no: 87)

2

-

81044

... More
IN door type board consists of two unit meter board and panel unit board A. Meter board unit: one number MS box of size 350x380x150 mm fabricated out of 2.0mm thick sheet metal with sealabledoors and arrangement for monting CTS( if any) to connect 3 PRE 4 wire energy meter cable box., complete .A transparent glass piece should be provided for protection where the energy reading could be readout. B.Panel board unit: One number of cubical type of control board of size 350x380x150mm fabricated out of 1.6mm thick sheet metal to operate 3ph/ 4 wire 50hz/400/440volts AC supply. C.Danger board: Danger board confirming to KPTCL standard should be provided on the panel board these two units (A & B) complete should be mounted on extra sheet of 1.6mm thick as screwed on the box as specification above with proper space in between shall be moulded on the MS angle of size 50x50x6mm fabricated pedastal and painted with rust resistance primer and two coats of ash grey/ olive green paints, the two units specified above with a proper space in between the box shall be provided with a cable entry and exit holes at the bottom punched and rubber retained in portion and they could be as and when required complete panel wiring should be done with cable as per IS 694/1990 Part I with its latest amendments. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.07 (b) page no: 89)

2

-

26576

... More
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.03 (c) page no:89) 1x3x4 sqm

440

-

47520

... More
Supply and delivery at site Brand new best make pressure gauge bourdon type as per ISI Mark and as per its latest amendments. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.04 (c) page no:89) 63mm

2

-

600

... More
Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per 88228/ 1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.10 (c) page no:90)

2

-

2050

... More
Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.10 (c) page no:90)

4

-

1800

... More
Supply and delivery galvanized mild steel tubes heavy class (C Class) as per IS 1239 (Part-I) 1990 with latest amendments with ISI Mark (one end fitted with Heavy Duty collar and other end (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.10 (c) page no:90)

400

-

249600

... More
Erection, Electrification and connissioning works of Pump sets including aligning and balancing with all necessary erection of materials and labour including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges etc., involved in the job. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.16 (c) page no:90)

2

-

11300

... More
Erection of indoor type panel board and meter board and meter board units with all necessary materials and labour including providing cement concrete foundation bed etc., complete (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.17 (c) page no:90)

2

-

2254

... More
providing main connection from pole - PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amenments with ISI mark from KPTCL pole to meter board unit. 3� x 16 sqmm (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.19d (c) page no:91)

40

-

9800

... More
Earthing Supplying and fixing and writing earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm holes of 12mm dia. (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.23 page no:91)

2

-

7266

... More
Supply and delivery at site of brand new best make gate valve as per IS 778/ 1984 with ISI Mark and as per its latest amendments (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.05.a page no:89) 50mm

2

-

2380

... More
Supply and delivery at site of brand new best make non-return valve as per IS 778/ 1984 with ISI Mark and as per its latest amendments (RWS SR 19-20 KALABURGI CIRCLE Item no: 12.06.a page no:89) 50mm

2

-

2350

... More
Constructing and Formation of Road embankment using murrum from approved borrow area including excavation of side gutters, spreading collected soil layers of 200 to 250 mm thickness, sectioning the surface to specified chamber and sides to the required slope, including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering, and compaction by power roller to achieve the specified density loading and unloading charges, all lead and lifts etc., complete as per specifications.(Item No. 6.73 Page No. 117-118 of Water Resources Dept -Minor Irrigation- SR for 2018-19)

2100

-

390600

... More
Planting permanent hedges including digging of trenches, 60cm wide and 45 cm deep,refilling the excavated earth mixed with faryard manure,supplied at the rate of 4.65cum per 100 meters and supplying and planting hedge plants at 30cm apart complete as per specifications. a) bs including digging of trenches MORTH specification No 307 b) Maintenance of hedge for 1 year. 50% Consider

225

-

69930

... More
Planting permanent hedges including digging of trenches, 60cm wide and 45 cm deep,refilling the excavated earth mixed with faryard manure,supplied at the rate of 4.65cum per 100 meters and supplying and planting hedge plants at 30cm apart complete as per specifications. a) bs including digging of trenches MORTH specification No 307 b) Maintenance of hedge for 1 year. 50% Consider

225

-

49140

... More
KSRRB M300-8.1. Planting and Maintaining of Flowering Plants and Shrubs -A) Planting flowring plants and shrubs in central varge MORTH Specification No. 307(Item No.19.86 Page No.149 of PWD SR for 2018-19)

225

-

10867.5

... More
KSRRB M300-8.1. Planting and Maintaining of Flowering Plants and Shrubs -A) Planting flowring plants and shrubs in central varge MORTH Specification No. 307 B) Maintenance of flowering plants and shrubs Km 1,54,837.00 in central yerge for one year.(Item No.19.87 Page No.149 of PWD SR for 2018-19)

0.225

-

51678.03

... More
KSRRB M300-9. Planting of trees by the road side (Avenue trees) in 0.60 �.Each 781.00 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year complete as per specifications. MORTH Specification No. 307(Item No.19.88 Page No.149 of PWD SR for 2018-19)

25

-

27562.5

... More
Making Lawns including ploughing and breaking of cold,removal of rubbish,dressing and supplying doobs grass roots and planting at 15cm apart,including supplaying and spreading of farm yard manure at rate of 0.18 cum per 100sqm complete as per specification MORTH Specification No 307 and maintainance of lawns or turfing of slopes(rough grassing) for a period of one year including watering etc complete as per specification. MORTH Specification No 307 Lawns for island area

2800

-

47040

... More
Making Lawns including ploughing and breaking of cold,removal of rubbish,dressing and supplying doobs grass roots and planting at 15cm apart,including supplaying and spreading of farm yard manure at rate of 0.18 cum per 100sqm complete as per specification MORTH Specification No 307 and maintainance of lawns or turfing of slopes(rough grassing) for a period of one year including watering etc complete as per specification. MORTH Specification No 307 Maintaing Lawns

2800

-

302820

... More
Open Gym Area: Providing and fixing Pre cast solid concrete kerb stones made out of CC 1:2:4 of size 450 x 200 x 400mm and finished with CM 1:3 plastering and finishing cutting etc., complete., NO=30+30+20+20=100Nos

100

-

48090

... More
KSRB 14-6.2: Providing and laying heavy duty cobble stones 75mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per sqm over 50mm thick sand bed (average thickness) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of pavar surface joints into its final level, including cost of materials, labour and HOM of machineries complete as per specifications.,(Item No.14.6 Page No. 103 of PWD SR for 2018-19)

600

-

653940

... More
Construction of Sopana for Tank Bund: Earth work excavation for foundation of structures upto 3 mtrs. by mechanical means as per drawing and technical specification, . including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilising / transporting the remaining earth upto 1.00km lead. including cost of labour, materials and HOM of machineries etc., complete.( Item No.2.23.1, Page No.8 PWD SR 2018-19,)

56.68

-

3094.73

... More
KSRB 4-1.2 : Providing and laying in position plain cement concrete of mix 1 :3:6 with ope cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @O.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery,� curing complete as per specifications.( Item No.4.2, Page No.13 PWD SR 2018-19,)

14.502

-

79972.73

... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460cum, with superplastisiser @3lts confirming to IS 9103-1999 Reaffirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls ( any thickness ) including attached pilasters, columns, pillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6,( Item No.4.11, Page No.14 PWD SR 2018-19,)

32.295

-

195998.36

... More
KSRB 4.9.2 : Providing TMT steel reinforcement for RCC work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications. Specification No. KBS 4.6.3.( Item No.4.46.2, Page No.18 PWD SR 2018-19,)

1.6148

-

119208.33

... More
Children play area Detailed Technical Specification Items Enloused

1

-

1100000

... More
Park Equipments for Senior Citizens and adults Detailed Technical Specification Items Enloused

1

-

1200000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.