Rural Water Supply And Sanitation Department Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Costs
EMD
₹ 1,37,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Providing Fhtcs To 326 Household In Channal In Habitation Of Channal Village In Mudhol Taluk Through Svs To Channal Village In Bagalkot Dist
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
RWSSD/2021-22/WS/WORK_INDENT35870Bid Award Id
ViewTender No
RWSSD/2021-22/WS/WORK_INDENT35870Tender Authority
Rural Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://eproc.karnataka.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work excavatoin for water Supply & Sanitary lines, Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification, including setting out, construction of shoring, strutting, barricading, danger lighting, bracing, using sight rails & boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench, including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work. in the following strata classifications by Mechanical MeansIn as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge a) In ordinary soil/hard soil - 60%
324.36
-
44275.14
Earth work excavatoin for water Supply & Sanitary lines, Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification, including setting out, construction of shoring, strutting, barricading, danger lighting, bracing, using sight rails & boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench, including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work. in the following strata classifications by Mechanical MeansIn as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge b) Ordinary Rock (not requiring blasting) - 40%
216.24
-
39507.05
Excavation for foundation of buildings, water supply & sanitary lines & electrical conduits etc., either in pits or in trenches 1.50m & above in width in hard rock by chiselling and / or wedging where blasting in prohibited, not excluding 1.50m in depth including stacking the excavated stuff clear from edges of excavation with lead upto 50m including cost of explosives, labour HOM of equipment complete as per specificationshard rock by chiselling and / or wedging -5%as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge b) Ordinary Rock (not requiring blasting) - 5%
108.12
-
231706.57
Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used.as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge 63mm
6256
-
853944
Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used.as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge 75mm
234
-
39803.4
Supplying HDPE pipes conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used.as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge 90mm
136
-
29988
Providing Sluice valve/ scour valve confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any cost of all materials, labour charges etc. complete.as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge 80mm dia
6
-
18270
Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I,II,III class B or IS 779 and IS 2373 with life cycle test certificate from FCRI/ NABL accredited lab. The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointer of the meter shall be as per ISO 4064 class B specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates.80mm dia
2
-
38902
Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. . as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge 63mm dia
111.47
-
629225.86
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
2142.28
-
231687.58
Labour charges for attending to repairs to the PVC pipes by earth work excavation cutting the old pipe installation and jointing of new pipes to the existing old pipe to the depth and line, level and perfect linking at joints including encasing the pipes alround to a depth of not less than 15cms with earth available including cost of all labour, hire charge of equipment,refilling the excavated trenches compacting, finishing neatly by giving satisfactory hydraulic test etc., complete as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
713
-
147484.05
BULK FLOW CHAMBER : Earth work excavation for water Supply & Sanitary lines, Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification, including setting out, construction of shoring, strutting, barricading, danger lighting, bracing, using sight rails & boning rods at every 100 mm whoever necessary removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench, including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work. in the following strata classifications by Mechanical Means as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
4.96
-
677.04
Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892 cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
0.46
-
2550.72
Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columns pillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications.as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
1.98
-
11869.01
Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications TMT bars Fe 500 as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
0.12
-
8858.56
Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons.as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
17.82
-
4771.3
Providing 15mm thick cement plaster in single coat with cement mortar 1:4, to brick masonry including rounding off corners wherever required smooth rendering, Providing and removing scaffolding, including cost of materials, labour, curing complete as per specificationsh ISI mark with its latest amendments as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
7.6
-
1747.62
Supplying and fixing of fixed height surface box H-4057 MD-KU with PP 40% GF Lid, Housing of PA+, Locking clip of PP with Notched bolt M 12 x 130 hexagon head A2-70 for service connection valves, design derived from DIN 4057, Should be suppied with support tile I (FSL, FSS ,SI) ,Should be able to receive class AA traffic loads as per specification,design and drawings including cost of all material, labour charges and hirecharges of machineries with all lead and lift as directed by the Engineer-in-charge
6
-
17230.5