Agricultural Produce Market Committee Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Costs
EMD
₹ 1,12,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
APMC/2020-21/OW/WORK_INDENT4771/CALL-3Bid Award Id
ViewTender No
APMC/2020-21/OW/WORK_INDENT4771/CALL-3Tender Authority
Agricultural Produce Market Committee ViewPurchaser Address
-Website
http://www.arthapedia.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of granular sub-base Grading-V as Sub-base and drainage layer by providing coarse graded crushed stone aggregates of granite/trap/ basalt material, mixing by mix in place method by rotavator at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the 98 % proctor density, complete as per specifications. Clause 401 of MORTH V Revision. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
331.49
-
691952.23
... More
KSRRB M600-1. Providing and Constructing dry lean cement concrete h1 mix CC 1:5:10 base with OPC 25mm and down size graded granite metal coarse aggregate at 0.86cum and fine aggregates @o.58cum over a prepared sub-base, coarse and fine aggregate conforming to IS: 383-2016, aggregate cement ratio not to exceed 15:1, Aggregate gradation after blending to be as per Table 600-1,optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per specifications. Clause 601of MORTH V Revision and IS 456 Table-5 with OPC at 150 kg/cum and coarse aggregate 0.86cum, fine aggregate 0.58cum using Concrete Batch mix Plant at 75 cum/hr capacity with fixed form paver The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
220.99
-
936279.38
... More
Constructing un-reinforced, plain cement concrete for pavements using Grade concrete M30 over a prepared base with OPC coarse aggregate at 0.69 cum, fine aggregates at 0.46 cum,Coarse and fine aggregate conforming to IS:383-2016, with Superplastizer at 3 Its conforming to IS 9103-2008. mixed in a concrete mixer of not less than 0.6 cum capacity and appropriate weigh batcher as per approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing). & Spreading the concrete with shovels, rackers compacted using needle, screed and plate vibrator and finished with floaters in a continuous operation including provision of contraction, expansion, construction and longitudinal joints,including groove cutting charges, joint filler, separation membrane of impermiable plastic sheet of 125 micron, sealant primer, joint sealant, admixtures as approved, curing compound, finishing to lines and grades, textured with texturing machine, and curing including cost of all materials, labour,hire charges of machineries,all lead & lift charges etc., complete as per specifications. with OPC at 360 kg/cum and coarse aggregate 0.69cum, fine aggregate 0.46cum The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
441.98
-
2379333.03
... More
Vaccum de-watering with vaccum pump and suction mat and compaction with skin floater clubbed with floating disc including cost of generator, HOM of machinery, Screed Vibratory, Power Floater, blade and disc etc., with all lead and lift The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
2209.91
-
157787.57
... More
KSRRB M800-13.Road Marking with Hot Applied Thermoplastic Compound with Reflectrising Glass Beads on Bituminous Surface/concrete surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per specifications. MORTH Specification No. 803 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
40.2
-
18108.09
... More
Providing and fixing pre cast solid cement concrete kerb stones made out of C.C. 1:2:4 with top and bottom width 114 and 165 mm respectively, 400mm high and 450mm in length finished with CM 1:3 plastering and finishing cutting, including form work, curing, including cost of all materials, labour, hire charges of machinery, loading, unloading, lead and lift, transportation etc., complete. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
780
-
344799
... More
KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
204.3
-
17590.23
... More
KSRRB M300-Horticulture KSRRB M300-Spreading of sludge farm yard manure or/ and good earth KSRRB M300-1. Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm yard manure or/and good earth to be paid for separately) complete as per specifications. MORTH Specification No. 307 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
60.3
-
6521.44
... More
KSRRB M300-2.2. Grassing with Doobs grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed complete as per specifications. MORTH Specification No. 307 ii) In rows 7.5 cm apart in either direction The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
150.75
-
13454.44
... More
KSRRB M300-Making lawns including ploughing and dradding with ‘swagha’ breaking of clod KSRRB M300-3. Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm complete as per specifiifications. MORTH Specification No. 307 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
201
-
3376.8
... More
KSRRB M300-7.1. Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart complete as per specifications. A) Planting permanent hedges including digging of trenches MORTH Specification No. 307 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
201
-
62470.8
... More
KSRRB M300- Planting and Maintaining of Flowering Plants and Shrubs KSRRB M300- 8.1. Planting and Maintaining of Flowering Plants and Shrubs - A) Planting flowring plants and shrubs in central verge MORTH Specification No. 307 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
201
-
9708.3
... More
KSRRB 300-Supply at site of work/ store-deoiled neem cake KSRRB 300-12. Supply at site of work/ store-deoiled neem cake duly packed in used gunny bags complete as per specifications. MORTH Specification No. 308.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
5
-
5775
... More
KSRB 2-2 Earthwork excavation by manual means for foundation of buildings, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications.in ordinary soil. No. KBS 2.1(a)/2.3.5 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
47.9
-
15038.2
... More
KSRB 4-1.2 Providing and laying in position plain cement concrete of Mix 1:3:6 with OPC @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregates @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM curing complete as per specifications. Specification No. KBS 4.1, 4.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
6.05
-
35154.74
... More
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design Mix M20 with OPC @ 320kgs, with 20mm down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
17.12
-
108772.78
... More
KSRB 4-6.4 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth cills and string courses cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
106.56
-
40055.9
... More
KSRB 4.9.2 Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per specifications. Specification No. KBS 4.6.3 TMT bars Fe 500 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
1.4
-
103351.29
... More
KSRB 6-1.3 : Providing and constructing burnt brick masonry with CM 1:6 for basement and superstructure with approved quality of non-modular bricks of standard size of class designation 3.5Newton per sqmm with cement mortar1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
14.08
-
91468.61
... More
KSRB 4-1.6 ; Providing and laying in position plain cement concrete of mix 1:2:4 with OPC @ 240kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregtes @ 0.53cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills, including cost of all materials, labour, HOM curing complete as per specifications. Specification No. KBS 4.1, 4.2 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
0.62
-
3836.34
... More
KSRB15-3.8 : Providing 18mm thick cement plaster in single coat with cement mortar 1:4, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
175.5
-
48648.6
... More
Providing and fixing M.S. Gate as per Chief Architect Drawing, using 50mm x 50mm 14 guage M.S. hollow pipe frame work bent to ornamental shape as shown in the drawing and 35mm x 6mm and 16 x 16mm Square rods for verticals alternatively spaced at 4cms c/c in two halves and 40mmx6mm M.S. flats for horizontal member and at the top cast iron spikes are provided at alternate vertical members asshown in the drawing etc., complete. All the steel surface should be thoroughly cleaned free of rust and painted with anti corrosive paint (shop paint) etc., complete. The work includes cost of all materials, labour charges for all items of work, hire charges for welding, cutting and grinding equipment, and electricity charges, with lead and lift, loading and unloading charges, etc., complete as per specifiocation. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
20
-
67200
... More
Providing and finishing external walls in two coats over one coat 100% acrylic silicon glazed primer with antifungal paint for top coat of approved brand and shade to give an even shade after thoroughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, complete as per specifications. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
175.5
-
33169.5
... More
KSRB 15-18.2 : Providing and applying enamel metal paint two coats (excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications. The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
20
-
2052
... More
Providing and fixing of wall cladding using 20mm thick gang saw water cut Shiva gold granite, grey granite in CM 1:3 proportion cut to required shape, pattern with paper joints, finished with cement mortal using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mmx12mm grooves in joints including curing etc., complete The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
16.08
-
61581.25
... More
KSRRB M2900- PCC M10 in Foundation KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 408 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
1.8
-
8399.16
... More
KSRRB M2100-17.2. Plain / Reinforced Cement Concrete design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70cum and fine aggregates @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008,Open Foundation complete as per Drawing and Technical Specification Case - II : With Batching Plant, Transit Mixer and Concrete Pump MORTH Specification No. 1500,1700 & 2100 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
10.05
-
57342.28
... More
KSRRB M2200-6. Providing T. M.T. steel reinforcement for R.C.C. work including straightening, cutting, bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per disign (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per specification. MORTH Specification No.1600 & 2200 TMT Bars Fe 500 The Rates Inclusive of cost of all materials,Labour,Including, all lead & lifts,loading & unloading charges, hire Charges of Machinery & equipments & the work should be carried out as per specifications & as per the directions of the Engineer Incharge of the work.
1
-
70920.15
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements