Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date29 Jun 2024
Closing Date5 Jul 2024
Tender Amount₹ 41,74,426 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Use rate of 10 H.P diesel pump with diesel, mobile oprator during execavation work as per specification and direction of E/I .(PM-29 ) .

309.34

899239

2906.96

... More
E / W in execavation of foundation trenches of toe wall , spillway , head regulator, 0utlet , intel well etc. as per designed section in all kinds of soil including moorum soil, soil mixed with kankar ,pebbles and boulders upto 300 mm size and disposal of the same ( beyond 50 m away from the edge of the trenches ) with initial lead of 150 m and initial lift of 1.5 M as per specification and direction of E / I ( 5.18)

3.12

18977

6082.45

... More
Providing and laying P.C.C. or R.C.C. M-150 with nominal mix of (1:2:4) in various components of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened exlcuding cost of shuttering or form work as well of reinforcement, its cutting, bending, binding and placing but including necessary tools and plants and vibrating , curing ,royality all taxaes etc. complete job as per specification and direction of E/I/. BCD(5.3.1.3)

8.46

53373

6308.87

... More
providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation with approved quality of coarse sand of requisite F.m. (2.5 to 3.0) washed and screened with raking out joints, curing, scaffolding and its removal wherever required including royality and all taxes etc. complete job as per specification and direction of E/I ( 5.4.8)(5.2.28A).

0.63

50953

80879.07

... More
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in superstructure with approved quality of coarse sand of requisite F.M. (2.5 to 3.0) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specification and direction of E/I. (5.4.11)(5.2.31A)

377.12

97625

258.87

... More
Providing 25mm thick Cement Plaster (1:4) with approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened including curing, scaffolding, wherever required and its removal royalty and all taxes etc. complete job as per specification and direction of E/I. (5.5.5)(5.7.12A)

206

34290

166.46

... More
Supply of NP2 R.C.C Hume Pipe with 300 mm Dia. With Collar ( Chapter -1 , S.No. M-215(IV)

17.57

10357

589.51

... More
Supplying and labour charge for laying ,fitting and fixing Np2 hume pipe with collors in line, level and grade .as well as providing approved jointing materils and joints properly filling to make them water proof , all complete , as per specification and direction of E/I (7.6.1.3 )

143.47

16427

114.5

... More
Supplying and labour charge for laying ,fitting and fixing Np2 hume pipe with collors in line, level and grade .as well as providing approved jointing materils and joints properly filling to make them water proof , all complete , as per specification and direction of E/I (7.6.1.3 )

53.13

10352

194.85

... More
Supplying and labour charge for laying ,fitting and fixing Np2 hume pipe with collors in line, level and grade .as well as providing approved jointing materils and joints properly filling to make them water proof , all complete , as per specification and direction of E/I (7.6.1.3 )

36.73

17093

465.38

... More
Supplying and labour charge for laying ,fitting and fixing Np2 hume pipe with collors in line, level and grade .as well as providing approved jointing materils and joints properly filling to make them water proof , all complete , as per specification and direction of E/I (7.6.1.3 )

20.16

8786

435.82

... More
Supplying and labour charge for laying ,fitting and fixing Np2 hume pipe with collors in line, level and grade .as well as providing approved jointing materils and joints properly filling to make them water proof , all complete , as per specification and direction of E/I (7.6.1.3 )

501.03

76066

151.82

... More
Supplying and labour charge for laying ,fitting and fixing Np2 hume pipe with collors in line, level and grade .as well as providing approved jointing materils and joints properly filling to make them water proof , all complete , as per specification and direction of E/I (7.6.1.3 )

501.03

7770

15.51

... More
Carriage of Materials Cement

150.66

96738

642.1

... More
(ii) Sand :

395.02

325101

823

... More
(iii) Stone Chips :

59.19

56128

948.28

... More
(iv) Stone Boulder

622.36

612860

984.74

... More
(v) Steel

0.63

404

642.1

... More
GST 12%

3502622.63

630472

1

... More
Labour Cess1%

4133094.7

41330

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.