WAPCOS Limited Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

WAPCOS Limited - WAPCO Tender

Works
Eprocure
Opening Date25 Nov 2021
Closing Date18 Dec 2021
Tender Amount₹ 1,60,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Core drilling in rock including overburden using hydraulic feed rotary drill and double/triple tube core barrel with DIAMOND CORE bit including collection of core samples, maintaining continuous record of core recovery / RQD, keeping the cores in wooden core boxes, transporting to laboratory, providing cap on top on completion of the same, all complete as per the BIS specification and instructions of the Engineer- in Charge (150-200m)

100

-

-

... More
Core drilling in rock including overburden using hydraulic feed rotary drill and double/triple tube core barrel with DIAMOND CORE bit including collection of core samples, maintaining continuous record of core recovery / RQD, keeping the cores in wooden core boxes, transporting to laboratory, providing cap on top on completion of the same, all complete as per the BIS specification and instructions of the Engineer- in Charge (200-250m)

100

-

-

... More
Core drilling in rock including overburden using hydraulic feed rotary drill and double/triple tube core barrel with DIAMOND CORE bit including collection of core samples, maintaining continuous record of core recovery / RQD, keeping the cores in wooden core boxes, transporting to laboratory, providing cap on top on completion of the same, all complete as per the BIS specification and instructions of the Engineer- in Charge (250-300m)

100

-

-

... More
Core drilling in rock including overburden using hydraulic feed rotary drill and double/triple tube core barrel with DIAMOND CORE bit including collection of core samples, maintaining continuous record of core recovery / RQD, keeping the cores in wooden core boxes, transporting to laboratory, providing cap on top on completion of the same, all complete as per the BIS specification and instructions of the Engineer- in Charge (300-350m)

60

-

-

... More
Core drilling in rock including overburden using hydraulic feed rotary drill and double/triple tube core barrel with DIAMOND CORE bit including collection of core samples, maintaining continuous record of core recovery / RQD, keeping the cores in wooden core boxes, transporting to laboratory, providing cap on top on completion of the same, all complete as per the BIS specification and instructions of the Engineer- in Charge (350-400m)

30

-

-

... More
Tests in Drill holes Conducting field permeability test in soil/over burden at various locations in boreholes/pits Pump in test in borehole by constant head method/falling head method

20

-

-

... More
Tests in Drill holes Conducting field permeability test in soil/over burden at various locations in boreholes/pits Percolation test in pits

20

-

-

... More
Tests in Drill holes Conducting field permeability test in rock in drill holes at various depths Single Packer method

260

-

-

... More
Tests in Drill holes Conducting field permeability test in rock in drill holes at various depths Double Packer Method

110

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.