Urban Development Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Urban Development Department - JUIDCO Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date2 Mar 2024
Closing Date8 Mar 2024
Tender Amount₹ 5,45,469
Costs
EMD
₹ 11,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDD_84588_40Bid Award Id
ViewTender No
UDD/AMC/04/2023-24Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[5.1.10]
5.4
3183
589.51
Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[5.6.3]
88.8
29334
330.34
Supplying 300 mm dia NP2 RCC Hume pipe with collar …..do…do…direction of E/I.
141.06
82731
586.5
Providing labour for fitting and fixing 300 mm dia NP2 RCC Hume pipe …..do…do…direction of E/I.[3.3.6.4]
141.06
51049
361.9
Earthwork in back filling the trench after laying different types and sizes of R.C.C. spun pipes …do..do..E/I.[3.3.2]
41.58
3905
93.93
Disposal of excavated earth in borrow area of lead 1km(k) +2km(p)
66.85
11101
166.07
Providing and laying PCC M-20 with nominal mix (1:1.5:3)in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :[5.3.1.1]
3.11
15430
4961.73
Providing designation 75 B brick work with c.m (1:6) in foundation ......... do ........ do ...........E/I. [5.2.6]
17.82
91064
5110.26
Plastering of 12 mm thickness with c.m [1:6] ......... do ........ do ...........E/I. [5.7.3]
79.85
13239
165.8
Providing 1.5 mm cement punning ......... do ........ do ...........E/I. [5.7.11]
79.85
4346
54.43
Providing precast rcc slab of m - 20 with nominal mix (1:1.5:3) on prepared chamber ......... do ........ do ...........E/I. [5.3.4]
3.11
16320
5247.64
Providing TMT reinforcement bar ......... do ........ do ...........E/I.
-
-
-
12MM DIA Main bar
0.18
14542
80879.07
10mm dia bar
0.12
10229
82096.54
making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete for pipes 100 to 250mm dia do……………do………as per direction of E/I.[dsr-19.21.2]
50
33008
660.16
Carriage of Materials
-
-
-
Sand 1Km(K) + 5Km(P)
16.71
5972
357.4
Cement 5 K,(P)
4.5
2052
456.1
Chips 1Km (K) + 34 Km (P)
5.34
3974
744.28
Bricks 1Km(K) + 7 Km(K)
10123
18069
1.79
Hume Pipe 5 Km(P)
141.06
8814
62.49
Reinforecement bar 5 KM(P)
0.3
138
456.1
Add 18% GST
1
80019
80019.63
Adding Labour Cess @ 1%
1
5245
5245.73