Urban Development Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Urban Development Department - JUIDCO Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date29 Jul 2024
Closing Date10 Aug 2024
Tender Amount₹ 4,60,782
Costs
EMD
₹ 9,500Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDD_88880_5Tender No
UDD/AMC/04/2023-24 2ND CALLTender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[5.6.3]
103.89
34319
330.34
... More
Supplying 300 mm dia NP2 RCC Hume pipe with collar …..do…do…direction of E/I.
98.33
57670
586.5
... More
Providing labour for fitting and fixing 300 mm dia NP2 RCC Hume pipe …..do…do…direction of E/I.[3.3.6.4]
98.33
35585
361.9
... More
Earthwork in back filling the trench after laying different types and sizes of R.C.C. spun pipes …do..do..E/I.[3.3.2]
20.75
1949
93.93
... More
Disposal of excavated earth in borrow area of lead 1km(k) +2km(p)
72.22
11993
166.07
... More
Providing and laying PCC M-20 with nominal mix (1:1.5:3)in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :[5.3.1.1]
6.79
33690
4961.73
... More
Providing designation 75 B brick work with c.m (1:6) in foundation ......... do ........ do ...........E/I. [5.2.6]
13.55
69244
5110.26
... More
Plastering of 12 mm thickness with c.m [1:6] ......... do ........ do ...........E/I. [5.7.3]
60.68
10060
165.8
... More
Providing 1.5 mm cement punning ......... do ........ do ...........E/I. [5.7.11]
60.68
3302
54.43
... More
Providing precast rcc slab of m - 20 with nominal mix (1:1.5:3) on prepared chamber ......... do ........ do ...........E/I. [5.3.4]
2.37
12436
5247.64
... More
Providing TMT reinforcement bar ......... do ........ do ...........E/I.
-
-
-
... More
12MM DIA Main bar
0.14
11048
80879.07
... More
10mm dia bar
0.09
7774
82096.54
... More
making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete for pipes 100 to 250mm dia do……………do………as per direction of E/I.[dsr-19.21.2]
38
25086
660.16
... More
Carriage of Materials
-
-
-
... More
Sand 1Km(K) + 5Km(P)
16.23
5800
357.4
... More
Cement 5 K,(P)
5.24
2389
456.1
... More
Chips 1Km (K) + 34 Km (P)
7.85
5842
744.28
... More
Bricks 1Km(K) + 7 Km(K)
8876
15843
1.79
... More
Hume Pipe 5 Km(P)
98.33
6144
62.49
... More
Reinforecement bar 5 KM(P)
0.23
105
456.1
... More
Add 18% GST
1
69583
69583.63
... More
Adding Labour Cess @ 1%
1
4561
4561.59