Urban Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date5 Aug 2024
Closing Date17 Aug 2024
Tender Amount₹ 5,34,398 
Notes
Download

Costs

Summary

Construction Of 300mm Np2 Rcc Hume Pipe Drain From House Of Buddhinath Kansari, Shankar Kansari To House Of Naro Kansari At Adityapur Basti Near Hydt In Ward No.20

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying 300 mm dia NP2 RCC Hume pipe with collar …..do…do…direction of E/I.

158.75

93106

586.5

... More
Providing labour for fitting and fixing 300 mm dia NP2 RCC Hume pipe …..do…do…direction of E/I.[3.3.6.4]

158.75

57451

361.9

... More
Earthwork in back filling the trench after laying different types and sizes of R.C.C. spun pipes …do..do..E/I.[3.3.2]

45.65

4287

93.93

... More
Disposal of excavated earth in borrow area of lead 1km(k) +2km(p)

64.85

10769

166.07

... More
Providing and laying PCC M-20 with nominal mix (1:1.5:3)in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :[5.3.1.1]

2.74

13595

4961.73

... More
Providing designation 75 B brick work with c.m (1:6) in foundation ......... do ........ do ...........E/I. [5.2.6]

15.69

80179

5110.26

... More
Plastering of 12 mm thickness with c.m [1:6] ......... do ........ do ...........E/I. [5.7.3]

70.26

11649

165.8

... More
Providing 1.5 mm cement punning ......... do ........ do ...........E/I. [5.7.11]

70.26

3824

54.43

... More
Providing precast rcc slab of m - 20 with nominal mix (1:1.5:3) on prepared chamber ......... do ........ do ...........E/I. [5.3.4]

2.74

14378

5247.64

... More
Providing TMT reinforcement bar ......... do ........ do ...........E/I.

-

-

-

... More
12MM DIA Main bar

0.16

12795

80879.07

... More
10mm dia bar

0.11

9005

82096.54

... More
making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete for pipes 100 to 250mm dia do……………do………as per direction of E/I.[dsr-19.21.2]

44

29047

660.16

... More
Carriage of Materials

-

-

-

... More
Sand 1Km(K) + 5Km(P)

18.84

6733

357.4

... More
Cement 5 K,(P)

3.96

1806

456.1

... More
Chips 1Km (K) + 34 Km (P)

4.7

3498

744.28

... More
Bricks 1Km(K) + 7 Km(K)

10002

17853

1.79

... More
Hume Pipe 5 Km(P)

158.75

9920

62.49

... More
Reinforecement bar 5 KM(P)

0.27

122

456.1

... More
Add 18% GST

1

80706

80706.29

... More
Adding Labour Cess @ 1%

1

5290

5290.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.