Urban Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Eprocure
Opening Date24 Jun 2024
Closing Date6 Jul 2024
Tender Amount₹ 21,04,478 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying of 200 mm dia x 3 mtr long UPVC casing pipe …... Do …....... Do ….......... E/I.

105

174326

1660.25

... More
Supplying labour, cement and calcium chloride or bentonite solution and equipment's for grouting to casing pipe after lowering in the bore etc. all complete as per specification and direction of E/I

3

539

179.77

... More
Supplying all tools, equipments and labour and doing washing Flushing and development of drilled TW to give clean and clear water all complete as per direction of E/I

1.5

6128

4085.76

... More
COST OF MATERIALS : Supplying Submersible pump sets with confirming to IS 8034 and motor confirming to IS 9283. Pump shall be suitable for various delivery head and discharge with stainless steel pump shaft and polypropylene/noryl impeller. motor suitable for working on 415 V + 10%, 3HP, 50 Hz, A.C.supply with cable guard, thrust carbon fiber bearing to withstand entire hydraulic thrust water proof winding shall be provided. The pump set shall be suible for direct coupling Pump shall have suitable outlet as per manufacturers design. Anti thrust stream lined non return val shall be provided with pump. 3 meter submersible copper conductor cable in single/ double run shall be provided with each pump. (Submersible pump set of 2 HP up to 20 stages)

3

63791

21263.8

... More
Cost of 32 mm dia medium quality PVC pipes in lengths of 3.0 m with long seamless sockets at one end including all taxes and transportation to work site etc. as per specification and direction of En.

504

98280

195

... More
Cost of PVC insulated copper submerssible cable of 3 core 4 sq mm including all taxes and transportation to work site etc. as per specification and direction of E/I.

504

70106

139.1

... More
Supplying clamp, band adopter, bore cover, rope etc as required.

3

9600

3200

... More
GI Fitting and Fixing

-

-

-

... More
20mm GI Nipple

12

1125

93.79

... More
20mm GI socket

24

2137

89.08

... More
20mm Union Socket

6

760

126.67

... More
20mm GL Elbow

18

1793

99.65

... More
20mm GI bends

15

1442

96.15

... More
20mm Reducing Socket

15

1258

83.89

... More
20mm Tee

6

643

107.3

... More
25mm dia HDPE pipe

45

1174

26.11

... More
Polythene water storage tank of ISI mark (e.g. Sintex/Sinter/Himgiri.Gangotri etc.) with cover and locking System

9000

69570

7.73

... More
5KVA Voltage Stabliser

3

45000

15000

... More
Supplying and fixing following way horizontal type 3 pole and neutral sheet steel MCB distribution board 415 volts on surface resist complete with …........... Do …....... Do …....... E/I

3

6360

2120

... More
SOAK PIT " Making soak pit 2.5 M diameter 3 mtr. Deep with 45x45 cm dry brick honey comb shaft with bricks of class designation 75 and S. W. drain pipe 100 mm diameter 1.8 mtr long complete as per standard design with FPS bricks

3

74333

24777.77

... More
Supplying all material, labour and equipment for constructing P.C.C (1:2:4) drain as per UNICEF design etc.

30

15354

511.82

... More
PANEL BOX : Site clearance and disposal of over burden soil ------- do ---- do ---- all direction of E/I.

15

5136

342.43

... More
Earthwork in excavation in foundation trenches in all kinds of soil and disposal of excavated earth as obtained to a distance upto 50M including all lifts, leveling, ramming the foundation trenches removing root of trees, shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1 + 5.1.2)

20.6

3447

167.33

... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) (5.1.10)

2.19

723

330.34

... More
Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. (5.6.3)

9.72

3210

330.34

... More
Providing RCC M-200 in nominal mix (1:1.5:3) in foundation & plinth with approved quality of stone ------- do ------ do ---- complete job as per building specification and direction of E/I. (5.3.9.1)

8.94

46648

5218

... More
Providing RCC M-200 in nominal mix (1:1.5:3) in roof slab with approved quality of stone ------- do ------ do ---- complete job as per building specification and direction of E/I.

4.92

31039

6308.87

... More
Providing TOR Steel of dia 8mm(stirrup) to 16mm (main bar)@200mm c/c @ 100Kg/M3 (5.5.5(a))

1.39

113785

82096.54

... More
Providing designation 75A brick work in C.M. (1:4) in foundation and plinth------- do ------ do ---- complete job as per building specification and direction of E/I. (5.2.2)

18.73

105206

5618.23

... More
Providing 12mm thick cement plaster (1:4) ------- do ------ do ---- complete job as per building specification and direction of E/I. (5.7.2)

204.04

35517

174.07

... More
Earthwork in back filling the trench after laying different types and sizes of R.C.C spun pipes ------- do ------ do ---- complete job as per building specification and direction of E/I. (5.1.7)

15.45

854

55.28

... More
Disposal of excavated earth in borrow area SOR-P-44 carriage-2 ------- do ------ do ---- complete job as per building specification and direction of E/I. Add 50% extra for loose volume) 1Km(K) + 3Km(P)

7.71

1280

166.07

... More
Providing two costs of snowsem over new surface ------- do ----- do ------ all complete job as per specification and direction of E/I. (5.8.24)

204.03

22253

109.07

... More
Supplying, Fitting and Fixing M.S. grill gate made of 20x6mm M.S. plate as per design------- do ----- do ------ all complete job as per specification and direction of E/I.(5.5.30)

380.7

45295

118.98

... More
Providing two coats of syntheics enamel paints ------- do ----- do ------ all complete job as per specification and direction of E/I.

16.2

1957

120.82

... More
Carrige of Materials

-

-

-

... More
(i) Sand 1 KM (k)+4 KM (P)

23.13

8266

357.4

... More
(ii) Chips 1Km(K) + 29Km(P)

10.5

7814

744.28

... More
(iii) Bricks 1 KM (k)+7KM (P)

7917

14092

1.78

... More
(iv) Reinforcement 5Km (P)

1.22

558

456.1

... More
Add 18% GST

1

317088

317088.2

... More
Adding Labour Cess @ 1%

1

20786

20786.89

... More
Signboard

1

5000

5000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.