Rural Works Department Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Works Department - RWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date9 Sep 2023
Closing Date20 Sep 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2

919.7

56543

61.48

... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (By Mix in Place Method) With Grading-I Material

2460.83

5649327

2295.7

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

1426.73

3711752

2601.58

... More
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means

9145.68

743726

81.32

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom

18291.36

235775

12.89

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

3711.75

70671

19.04

... More
Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. Bituminous Macadam for Grading II: (19 mm nominal size)

457.28

3886870

8499.98

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading-II (10 mm size)

377.11

4135652

10966.7

... More
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

83.53

301841

3613.57

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days.

2138.65

13830542

6466.95

... More
5th kilometre stone (precast) Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

1

2929

2929.3

... More
Ordinary Kilometer stone (Precast) Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

6

10445

1740.9

... More
Hectometer stone (Precast) Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc)

28

15201

542.9

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area not exceeding 0.9 sqm fixed over back support frame of min 35 x 35 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.

1.08

14800

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

678.94

396704

584.3

... More
Earth work in excavation of foundation in Ordinary Soil by Manual Means of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work.

1226.27

68425

55.8

... More
Construction of dry rubble flooring at cross drainage works for relatively less important works.

61.4

142538

2321.47

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15

183.69

885896

4822.78

... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed)

395.5

1816962

4594.09

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications, Random Rubble Masonry (Coursed/uncoursed)

251.13

1145476

4561.38

... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Square Rubble Coursed Rubble masonry (first sort)

316.73

1491415

4708.79

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Coursed rubble masonry (first sort)

156.91

761529

4853.29

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. Height upto 5m. PCC Grade M15

26

125179

4814.58

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. PCC Grade M20

23.56

124288

5275.42

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications, RCC Grade M25

40.61

234027

5762.81

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

8.8

106164

12064.11

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

5.93

524468

88458.17

... More
Plastering with cement mortar (1:3) on brick work in substructure as per technical specifications

391.7

45315

115.69

... More
Pointing with cement mortar (1:3) on brick work in substrucutre as per technical specifications.

402.5

24488

60.84

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

297

33332

112.23

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications. Sandy material

147.04

160157

1089.21

... More
Goods & Service Tax (G.S.T.) -

44281075.39

7970593

0.18

... More
Labour Cess -

52251668.97

522516

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.