Jharkhand Urja Sancharan Nigam Limited Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand Urja Sancharan Nigam Limited - JUSNL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Feb 2024
Closing Date21 Feb 2024
Tender Amount₹ 30,51,016 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mobilization of Labour Gang (one gang should consists of 40 persons)

4

-

12973

... More
Demobilization of Labour Gang (one gang should consists of 40 persons)

4

-

12973

... More
Supply of Emergency Gang with T&P for work like Conductor snapping of main bus

4

-

30286.81

... More
Replacement of 220kv CB pole

2

-

6342.2

... More
Replacement of 132kv CB pole

2

-

5489.33

... More
Supply of Hydra / Crane(upto 8MT Capacity ) as per requirement

12

-

3506.6

... More
Complete Overhauling with painting of 100 MVA Transformer Cooling Fans with supply of all materials if required

24

-

2756.25

... More
Transportation of materilas & equipments through Truck/Pickup upto 3MT including loading,unloading of the materials

-

-

-

... More
(i)Upto First 50kM

12

-

4754

... More
(ii)50kMDistance500kM

250

-

25

... More
Repair and Overhauling of Sub-mersible pump including materials, lifting & lay down of Sub-mersible pump from Borewell , repair of water supply pipe all complete job & Transporation cost.

3

-

26978.34

... More
Repair of 220 KV SF6 Breaker 1Φ spring charged motor if required

2

-

3114.56

... More
Repair of 132 KV SF6 Breaker 1Φ spring charged motor if required

2

-

3114.56

... More
Testing transformer oil by recognized laboratory including supply of sampling bottle

-

-

-

... More
BDV

3

-

2055.06

... More
DGA

3

-

8222.45

... More
Water content PPM

3

-

2055.06

... More
FURAN Analysis

3

-

8820

... More
Interfacial Tension IFT

3

-

1488.38

... More
Total Acidity

3

-

1488.38

... More
Contingency (To&Fro Charges including fooding & lodging)

1

-

3923.8

... More
Erection of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work ( Excluding Cost of Transportation Charges from Store to Site.)

-

-

-

... More
220 KV Current Transformer, Potential Transformer & CVT including Cable Terminal.

3

-

10615

... More
220 KV Lighting Arrestors

2

-

3302

... More
132 KV Current Transformer, Potential Transformer & CVT including Cable Terminal.

3

-

7549

... More
132 KV Lighting Arrestors

2

-

3302

... More
Dismantling of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work ( Excluding Cost of Transportation Charges from Store to Site.)

-

-

-

... More
220 KV Current Transformer, Potential Transformer & CVT including Cable Terminal.

3

-

4458.3

... More
220 KV Lighting Arrestors

2

-

1386.84

... More
132 KV Current Transformer, Potential Transformer & CVT including Cable Terminal.

3

-

3170.58

... More
132 KV Lighting Arrestors

2

-

1386.84

... More
Supply of Consumables viz. Markin cloth, Distilled water, Grease, Mobil, Nuts & Bolts, Cotton waste, Joute, Paterollium Jelly, Kerosine, mobil, WD-40 rust remover etc. required time to time for O&M works of GSS.

12

-

8268.75

... More
Air Condition

-

-

-

... More
Gas Filling Charge

12

-

4000

... More
Annual Maintenance with all spares

12

-

8000

... More
Filtration of transformer oil (if m/c supplied by firm).

7000

-

7

... More
Preventive and periodic maintenance of DG Set including all necessary consumables used in maintenance.

1

-

24195.7

... More
Assessment of defects of battery charger at GSS Chandil (both 220V & 48V battery Charger)

3

-

27500

... More
Maintenance and replacement of defective parts/ equipments of battery charger at GSS Chandil (both 220V & 48V battery Charger)

3

-

30000

... More
Sub-Total (A)

-

-

-

... More
Contractor profit on Sl. No. 1 {upto maximum @ 10% only} (e.g. For 2.87% fill only 2.87)

-

-

-

... More
Overhead Expenditure for T&P etc on SL. No. 1 {upto maximum @ 3% only} (e.g. For 2.87% fill only 2.87)

-

-

-

... More
EPF contribution of Employer@12% on Sl. No.-01

-

-

-

... More
ESIC contribution of Employer@3.25% on Sl. No.-01

-

-

-

... More
EDLI of EPF@0.5% on Sl. No.-01

-

-

-

... More
Administrative Charges@0.5% on Sl. No.-01

-

-

-

... More
Total on (Sl.No. 19 to 25)

-

-

-

... More
GST @ 18% on Total (Sl. No. 26)

-

-

-

... More
Sub-Total (B) (Sl.No. 26 + 27)

-

-

-

... More
Labour cess @ 1% on Sub-Total (B) (Sl.No. 28)

-

-

-

... More
Grand-Total on (Sl.No. 28+29)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.