Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 49,39,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCL_308319_1Bid Award Id
ViewTender No
GM(ENM)/E-TENDER/24/778 DATED 17.05.2024Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Design Engineering Cost
-
-
-
Preparation and submission of system engineering drawings as per system requirements.
1
-
-
GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works (Complete details of the system)
1
-
-
G.A. & detailed engineering designs and drawings including working and maintenance manuals of (Complete details of the system) : i) all individual equipment ( Mechanical & Electricals) ii) Dust Control & Pressurisation system. iii) Fire-fighting and plant cleaning system. iv) Chutes & Liners v) Communication system vi) Power Supply System
vii) Illumination system.
viii) Plant control system ix) Any other system/unit to match the scope of work & requirement
1
-
-
Documentation as per tender specification, complete as per scope of works
1
-
-
B. CIVIL, STRUCTURAL, INFRASTRUCTURAL AND DEVELOPMENT WORK
-
-
-
Receiving Pit Complex including receiving hoppers, platform, ramp and retaining walls
1
-
-
Conveyor Gantry/Gallery with supporting structures
1
-
-
Transfer Houses, Drive Houses
1
-
-
Switching room
1
-
-
Internal approach roads, drains and culverts
1
-
-
Water supply arrangement: Ground water reservoir, water supply pipeline, pump houses.
1
-
-
Sewerage system & ETP
1
-
-
Lighting Mast
1
-
-
Site Development, Arboriculture & Miscellaneous Items required to complete the work as per NIT
1
-
-
C. PLANT & MACHINERY ( SUPPLY)
-
-
-
C.(a) SUPPLY : MECHANICAL
-
-
-
CONVEYORS
1
-
-
BELTING
1
-
-
EQUIPMEMT
-
-
-
Mechanical Equipment Receiving Pit & Bunker
1
-
-
Mechanical Equipment at Transfer houses
1
-
-
Other mechanical equipment
1
-
-
Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system, Plant cleaning, drinkng water , and other misc. equipment/utility for any more item required to complete the project
1
-
-
C.(b) SUPPLY : ELECTRICAL
-
-
-
Major Electrical Equipment in Switchroom (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
i) 415 V sectionalized Motor Control Centre (MCC) at substation A comprising of 2 nos. of Incomer ACBs, 1 no. of Bus-Coupler ACB and required nos. of SFUs, MCCBs, MCBs for supply of power to LT equipment like Vibro feeder, Electrical Hoist, Metal detector & Magnetic separator, Dust Suppression/ Extraction, Fire fighting system, Conveyor Brake, Flap gates etc. complete with metering and protection system- 1 No.
ii)Lighting Transformer 63 kVA, 415 V/230 V (L-L)- 1 No..
1
-
-
PLC-SCADA (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
PLC-SCADA system, Condition Monitoring System, Local Control Station, Fault Annunciation System, hard wiring, integration of the PLC-SCADA system of Alternate Arrangement with the PLC-SCADA system of the NTPC Conveyor System. Other parameters as defined in Scope.
1
-
-
Cables (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
A.Power cables:
i)3.3 kV grade, XLPE, three core, armoured Copper conductor, FRLS cables of different sizes for supply of power to Conveyor Drive C1 from 3.3 kV VCP at “NTPC Conveyor System” substation as per technical specification.
ii)1.1kV grade, PVC insulated, PVC sheathed single wire armoured copper conductor FRLS cables of different sizes for power supply to 415 V Switchboard panel to be stationed at Switch-room from 415 V Switchboard at “NTPC Conveyor System” substation and from 415 V Switchboard panel to be stationed at Switch-room to other LT equipment as per technical specification.
B.Lighting cables:
i)1100/660 V grade, PVC insulated, PVC sheathed, single wire armoured, Copper conductor, FRLS cables of different sizes as per technical specification.
C.Control and Signalling cables:
1100/660 V grade, single/multi core PVC insulated and sheathed, Copper conductor, FRLS, control and signalling cables of 2.5 sq. mm cross-section having different no. of cores as per technical specification.
D.Cable trays/cable racks Cable trays/cable racks (separate trays shall be used for power and control cables), cable trenches & cable vaults etc as per technical specification
1
-
-
Illumination system(Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
A.230 V (L-L) Main Lighting Distribution Board with incoming MCCB and outgoings MCCBs/MCBs as per technical specification
B.Lighting Distribution Boards with incoming and outgoing MCCBs / MCBs as per technical specification
C.Luminaires:
i) Supply of distribution boards, luminaries, ceiling fans, exhaust fans etc. including junction boxes, conduits, switches sockets etc. for indoor illumination as follows: a) For Switch room
1) The illumination system must be designed to ensure minimum illumination lux level of 100 Horizontal and 50 Vertical inside the substation building (Control room). 2) Ceiling fan, 48" sweep-Required Nos. b) Exhaust Fan Battery room - 2 no 12" sweep Toilet - 1 no 9" sweep
ii)11 m high steel tubular poles along with LED street light luminaries of required wattage with min. 100 lumen/watt along with control gear, brackets etc for service road lighting and general area lighting.
iii)8 Nos. of LED flood light luminaries of required wattage with min. 100 lumen/watt along with control gears, brackets etc. with 18 m high tower
iv)Inverter cum battery charger along with battery for emergency lighting suitable for operation at 230V AC inside substation building v)Miscellaneous items like junction boxes complete with fuse, terminal block and other necessary accessories, cable glands, lugs, conduits, receptacles etc
1
-
-
Welding System (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
i)Transformer welding set 400 A complete with cables and accessories-2 Nos.
ii)1.1kV grade, PVC insulated and sheathed single layer armoured, FRLS, Aluminium conductor cables for power supply to welding sockets.
iii)Dust proof plug sockets complete with switches, holder set etc throughout the plant-Lot
1
-
-
Earthing System & Lightning Protection System (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
i. Earthing system (Safe Earth Electrode type) including earth pits, required galvanised strips/flats for inter connection etc.- Lot. ii. Lightning protection system consisting of spikes, earth pits, galvanised strips /flats etc.-Lot
1
-
-
Communication system (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
i. Project administrative communication system complete with automatic pushbutton type telephone sets at various strategic locations such as Receiving Pit- Traffic Control Room-1 No.,Vibro Feeder Floor. - 1 No.,Receiving Pit Switch room- 1No. , Transfer House- 1 No., Conveyor Gantary- 1 No. etc. including wiring of all sets up to a common junction box and connected to main auto exchange for external connection - lot ii. Visual communication system with industrial type CCTV- lot
1
-
-
Miscellaneous Equipment comprising of the follwing (Refer Section 4.4, Part-II of Vol-II/Sec-7.3 & Annexure-III.2 of Vol-II/Sec-7.3 & Tender Drawings)
-
-
-
i. Water cooler with water purifier- 2 Nos.(min.) at suitable Locations. ii. Miscellaneous items such as Local control, stations, testing equipment, electrical portable fire fighting equipment for Switch-room and other safety equipment as per relevant Indian Standard & CEA Guidelines. Furniture for Switchroom building.-Lot iii. Exhaust and ceiling fans - lot iv. Insulating mats per IS for sub-stations, MCC rooms and control rooms - lot v. Air conditioners 1.5/2 Ton Capacity - lot vi. Mandatory Spares electrical installation-Lot
vii. Testing equipment electrical system-Lot
1
-
-
Any other equipment specifically not mentioned but necessary for efficient operation of plant under this package- lot
1
-
-
C1. ERECTION, INSTALLATION & COMMISSIONING
-
-
-
Erection of mechanical equipment
1
-
-
Erection of electrical equipment
1
-
-
Trial run, and commissioning of the plant
1
-
-
C2 . OTHERS ITEM
-
-
-
Any other item left out for completion of the project
1
-
-
C3 . MAINTENANCE AND TRAINING
-
-
-
Operation of the plant for five year after commissiong
1
-
-
Maintenance of the plant for five year after commissiong
1
-
-
Training of the employer personnel as per tender document
1
-
-
Total impact of GST for the purpose of CTC