Central Coalfields Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Repairing Of Electrical System Of Idm30 Drills Sl.no. 857,745, 755, Ck 300d Shovels Sl.no. 763 ,743 And Be1000 Shovel Sl.no. 10145 Deployed At Karma Ocp, Kuju Area.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCL_321356_2Bid Award Id
ViewTender No
GM(K)/Excv-61/24-25/T-86Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Repairing of electrical system of IDM30 drills Sl.no. 857,745, 755, CK 300D shovels Sl.no. 763 ,743 and BE1000 shovel Sl.no. 10145 deployed at Karma OCP, Kuju Area
Repairing of electrical system of IDM30 drills Sl.no. 857,745, 755, CK 300D shovels Sl.no. 763 ,743 and BE1000 shovel Sl.no. 10145 deployed at Karma OCP, Kuju Area.
BOQ Items
... More
Un-Skilled
12
-
-
... More
Supervisor
6
-
-
... More
LT wire (8mm)
2
-
-
... More
LT wire (6mm)
2
-
-
... More
LT wire (4mm)
2
-
-
... More
LT wire (2.5mm)
2
-
-
... More
Battery Cable (70sqmm.)
2
-
-
... More
Fuse Box with all accessories
2
-
-
... More
Battery cut off switch
2
-
-
... More
Battery isolated power switch 24V 100A
2
-
-
... More
Ferrule and Lugs
2
-
-
... More
Flexible fire resistance corrugated conduit
90
-
-
... More
Replacement of light holder and bulbs
12
-
-
... More
Repairing of control panel with indicating meter
4
-
-
... More
Replacement of defective light switch 24V
4
-
-
... More
replacement of head light assly. 24V
12
-
-
... More
Repair name of Machine: Drill: IDM#30(Sl.no.:745), IDM#30(Sl.no.:755), shovel BE1000(Sl.no. 10145) & shovel CK 300(sl.no. 743). Name of Sub-Assemblies:Electrical system (Labour and Material Cost)
-
-
-
... More
Highly Skilled
12
-
-
... More
Skilled
24
-
-
... More
Un-Skilled
24
-
-
... More
Supervisor
6
-
-
... More
LT wire (8mm) (1 roll=25 mtr)
4
-
-
... More
LT wire (6mm) (1 roll=25 mtr)
4
-
-
... More
LT wire (4mm) (1 roll=25 mtr)
4
-
-
... More
LT wire (2.5mm) (1 roll=25 mtr)
4
-
-
... More
Battery Cable (70sqmm.)
4
-
-
... More
Battery cut off switch
3
-
-
... More
Battery isolated power switch 24V 100A
4
-
-
... More
Ferrule and Lugs
4
-
-
... More
Flexible fire resistance corrugated conduit
180
-
-
... More
Reapiring of control panel with indicating metre
8
-
-
... More
Replacement of defective light switch 24V
8
-
-
... More
Replacement of head light assly. (LED light)
24
-
-
... More
Battery Relay switch
2
-
-
... More
MCB 06 Amp
10
-
-
... More
MCB 10 Amp
4
-
-
... More
MCB 16 Amp
4
-
-
... More
MCB 32 Amp
4
-
-
... More
PVC Tape
30
-
-
... More
Wire tie belt 300mm
2
-
-
... More
10% Contractor's profit
1
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements