Central Coalfields Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 2,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCL_321893_1Bid Award Id
ViewTender No
GM(PPR)/Civil/24-25 /2775Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Repairing and maintenance of unit store room under CHP CPP Piparwar Area.
BOQ Items
... More
12 mm cement plaster of mix : ( 1 cement : 6 fine sand )
30.78
217
6700.81
... More
Earth work in excavation by mechanical means (Hydraulic
excavator)/manualmeansoverareas(exceeding30cmindepth,1.5min
widthaswellas10sqmonplan)includinggettingoutanddisposalof
excavatedearthleadupto50mandforalllift,asdirectedbyEngineer-in-
charge. All kinds of soil
0.86
128
110.12
... More
Providingandlayinginpositioncementconcreteofspecifiedgrade
excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1Cement:4coarsesand(zone-Ill)derivedfromnaturalsources:8
graded stone aggregate 40 mm nominal size derived from natural sources)
0.14
5167
723.49
... More
Providingandlayinginpositioncementconcreteofspecifiedgrade
excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6(1Cement:3coarsesand(zone-III)derivedfromnaturalsources:6
graded stone aggregate 40 mm nominal size derived from natural sources)
0.72
5524
3977.75
... More
Structural steel work in single section, fixed with or without connecting plate, including cutting,hoisting,fixinginpositionandapplyingaprimingcoatof
approved steel primer all complete.
465.75
77
36305.21
... More
Providingandfixingprecoatedgalvanisedironprofilesheets(size,shapeand
pitchofcorrugationasapprovedbyEngineer-in-Charge)oftotalcoated
thickness0.50mm(basemetalofminimum0.45mmthicknesswithtotal
coatingthicknessof0.05mm)withzinccoating120gramspersqmasperIS:
277,in240mpasteelgrade,5-7micronsepoxyprimeronbothsideofthe
sheetandpolyestertopcoat15-18microns.Sheetshouldhaveprotective
guardfilmof25micronsminimumtoavoidscratchesduringtransportation
andshouldbesuppliedinsinglelengthupto12metreorasdesiredby
Engineer-in-charge.Thesheetshallbefixedusingselfdrilling/selftapping
screwsofsize(5.5x55mm)withEPDMseal,completeuptoanypitchin
horizontal/verticalorcurvedsurfaces,excludingthecostofpurlins,rafters
and trusses and including cutting to size and shape wherever required.
16
571
9136
... More
Paintingwithsyntheticenamelpaintofapprovedbrandandmanufactureof
required colour to give an even shade : One or more coats on old worksqm
9.72
65
638.12
... More
Finishing walls with water proofing cement paint of required shade : Oldwork(oneormorecoatsapplied@2.20kg/10sqm)overprimingcoatof
primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat.
214.94
72
15540.16
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements