Central Coalfields Limited Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Central Coalfields Limited - CCL Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date25 Nov 2024
Closing Date6 Dec 2024
Tender Amount₹ 2,14,050 
Notes
Download

Costs

Description

lockUnlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

lockUnlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Promotion Banner
Documents
ExclamationReport Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

lockView all details for FREE
... More
12 mm cement plaster of mix : ( 1 cement : 6 fine sand )

30.78

217

6700.81

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manualmeansoverareas(exceeding30cmindepth,1.5min widthaswellas10sqmonplan)includinggettingoutanddisposalof excavatedearthleadupto50mandforalllift,asdirectedbyEngineer-in- charge. All kinds of soil

0.86

128

110.12

... More
Providingandlayinginpositioncementconcreteofspecifiedgrade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1Cement:4coarsesand(zone-Ill)derivedfromnaturalsources:8 graded stone aggregate 40 mm nominal size derived from natural sources)

0.14

5167

723.49

... More
Providingandlayinginpositioncementconcreteofspecifiedgrade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6(1Cement:3coarsesand(zone-III)derivedfromnaturalsources:6 graded stone aggregate 40 mm nominal size derived from natural sources)

0.72

5524

3977.75

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting,hoisting,fixinginpositionandapplyingaprimingcoatof approved steel primer all complete.

465.75

77

36305.21

... More
Providingandfixingprecoatedgalvanisedironprofilesheets(size,shapeand pitchofcorrugationasapprovedbyEngineer-in-Charge)oftotalcoated thickness0.50mm(basemetalofminimum0.45mmthicknesswithtotal coatingthicknessof0.05mm)withzinccoating120gramspersqmasperIS: 277,in240mpasteelgrade,5-7micronsepoxyprimeronbothsideofthe sheetandpolyestertopcoat15-18microns.Sheetshouldhaveprotective guardfilmof25micronsminimumtoavoidscratchesduringtransportation andshouldbesuppliedinsinglelengthupto12metreorasdesiredby Engineer-in-charge.Thesheetshallbefixedusingselfdrilling/selftapping screwsofsize(5.5x55mm)withEPDMseal,completeuptoanypitchin horizontal/verticalorcurvedsurfaces,excludingthecostofpurlins,rafters and trusses and including cutting to size and shape wherever required.

16

571

9136

... More
Paintingwithsyntheticenamelpaintofapprovedbrandandmanufactureof required colour to give an even shade : One or more coats on old worksqm

9.72

65

638.12

... More
Finishing walls with water proofing cement paint of required shade : Oldwork(oneormorecoatsapplied@2.20kg/10sqm)overprimingcoatof primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat.

214.94

72

15540.16

... More
Total impact of GST for the purpose of CTC

1

-

-



Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.