Central Coalfields Limited Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Central Coalfields Limited - CCL Tender

Eprocure
Opening Date21 Dec 2021
Closing Date3 Jan 2022
Tender Amount₹ 5,24,950 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of library room and boundary wall of high school Karma, under CSR Scheme 2021-22 of Kuju Area.
Construction of library room and boundary wall of high school Karma, under CSR Scheme 2021-22 of Kuju Area.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size)

7.7

-

5177.88

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

9.58

-

6779.43

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

1.47

-

7860.01

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).

16.67

-

8165.5

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation .5 in foundation and plith in: Cement mortar 1:6 ( 1 cement : 6 coarse sand)

12.38

-

4736.07

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of classdesigantion .5 in supersturcture above plinth upto loor V level in al shape and sizes In : Cement mortar 1:6 ( 1 cement : 6 coarse sand)

10.79

-

5732.27

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.: Cold twisted bars

2220.37

-

92.45

... More
Providing and fixing M.S. fan clamp type I or II of 16 mm dia M.S. bar, bent to shape with hooked ends in R.C.C. slabs or beams during laying, including painting the exposed portion of loop, all as per standard design complete.

3

-

174.5

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete

105.53

-

97.95

... More
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using flats 30x6mm for diagonal braces and central cross piece

7.33

-

3823.15

... More
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. 9.48.1 Fixed to steel windows by welding

96.84

-

154.56

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

51.37

-

148.62

... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate

72

-

413.75

... More
12mm cement plaster o mix : 1 : 6 ( 1 cement : 6 fine sand)

239.76

-

192.8

... More
6 mm cement plaster o mix : 1.3 (1 cement : 3 ine sand)

104.56

-

174.71

... More
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)

124.62

-

71.35

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats) over and including water tinnable priming coat with cement primer

219.7

-

121.58

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work

26.11

-

91.22

... More
Cement plaster skirting up to 30 cm height, with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement. 18 mm thick

20.4

-

405.84

... More
Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth.

9.5

-

466.2

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete

61.39

-

209.33

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

68.81

-

538.02

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

69.38

-

411.67

... More
Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform

86.24

-

513.44

... More
Weather shade, Chajjas, corbels etc., including edges

8.7

-

415.55

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand

8.13

-

714.31

... More
Part-B, Boundary wall Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.

5.76

-

191.84

... More
Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete

0.96

-

815.55

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size)

1.92

-

4629.39

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand)

1.93

-

4736.07

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)

0.96

-

5732.27

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 in foundations and plinth in :cement mortar 1:4 (1 cement : 4 coarse sand)

34.81

-

604.15

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 5.00 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand)

17.41

-

714.31

... More
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)

127.04

-

192.8

... More
Colour washing such as green, blue or buff to give an even shade : New work (two or more coats) with a base coat of white washing with lime

127.04

-

23.63

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.