Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 3,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Erection Of 3.3 Kv Overhead Line About 350 Mtr From Kopa To Out Source Sump Mine Main Road Junction And Partial Rearrangement Of Existing Line For Supply Of 3.3 Kv Power From 3 Mva, 11/3.3 Kv Mine Ckt For Mine Dewatering Purpose, Kabribad Mine, Grd P
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCL_299241_1Bid Award Id
ViewTender No
pe(enm)/grd/e-nit/23-24/96Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection of steel tubular or rail pole strut in cement
concrete 1:3:6(1cement : 3 coarse sand: 6 graded
stone aggregate 40mm nominal size) foundation
including excavationand refilling etc. as required.
6
39216
6536
... More
Dismantling of pole/ street light standard/ strut
embedded in cement concrete foundation etc as
required.
6
11166
1861
... More
Dismantling of over head lines comprising of
copper/ aluminium over head conductor, G.I. wire,
cross arms, insulators etc. as
required.((0.145kg/m*(40*3)m/span*6 span
)+10%)
114.84
114.84
7349
64
... More
Erection of all aluminium conductor of 7/1.96 mm
to 7/3.10 mm diameter including binding etc. as
required.
226.2
42751
189
... More
Supply and erection of pin insulator complete with
large steel head GI pin, nuts, washers etc as
required
18
4518
251
... More
Supply and erection of 11KV disc insulator for 11KV
overhead lines with galvanized insulator fittings,
ball and socket type and complete with galvanized
strain clamps, bolts, nuts, washers etc
9
7497
833
... More
Supply and erection ofgalvanized "D" iron clamps
complete with shackle insulator (75mmX90mm) GI
bolts, nuts and washers, coach screws etc as
required
6
1206
201
... More
Supplying and erection of stay set complete
(galvanised) with 19/ 20 mm dia X 1.8 metres long
stay rod, anchor plate of size 45 cm X 45 cm X 7.5
mm, thimble, stay clamps, bow tightener, 7/ 3.15
mm dia G.I. stay wire and strain insulator etc in
cement concrete 1:3:6 (1 cement : 3 coarse sand : 6
graded stone aggregate 40 mm nominal size )
foundation including excavation and refilling etc. as
required
4
16896
4224
... More
Supplying of two lengths of channel iron 75mm X
40 mm X 6 mm (7.14 kg per metre) double pole
cross arm for three wire 11KV over head line
conductors complete with through bolts and nuts
for clamping to the poles, 50 mm X 6 mm M.S. flats
welded on one side to the channel iron and with
bolts and nuts on the other side for tying the cross
arms together, including drilling holes for insulator
pins/ fittings, bolts, nuts and washers etc (as per
drawing) and painting with primer and finish paint
as required
2
6376
3188
... More
Supply of angle iron bracket (50mm x 50mm x
6mm)65 cm long as required(4ft bracket-9nos)
17
3094
182
... More
Erection of angle iron/ channel iron cross arm on
wood/ RCC/ PCC/ steel tubular/ rail pole etc. as
required. (2 angle in 10 poles and 18 angles in 18
poles)
14
3122
223
... More
Nut Bol
20
2600
130
... More
Transportation of pole from Giridih RStore
5
1750
350
... More
Cradling (As required across the roads)
3
18861
6287
... More
Supply of 8 SWG GI Wire for fourth/earth wire
94.25
9990
106
... More
Supply of angle iron bracket (50mm x 50mm x
6mm)65 cm long as required(1.5ft bracket-13nos)
for fourth/earth wire
9
1638
182
... More
Total impact of GST for the purpose of CTC