Central Coalfields Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 3,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCL_317970_7Bid Award Id
ViewTender No
SDOCM/PE(EnM)/e.NIT/24-25/09 dt.21.09.2024Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
(A)Extension of 220V Turiyo colony OH line near Turiyo basti upto shiv mandir for lighting purpose. (B) Extension/re-organization of 220V OH line from near CISF barrack A company to Karipani road weigh bridge in r/o SDOCM
BOQ Items
Supplying and erection of stay set complete (galvanised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 mm X 60 cm ), 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
1
-
-
Supplying and erection of 100 mm X 110 mm shackle insulator with G. I. Bolt, nuts and straps etc. as required .
2
-
-
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required.
8
-
-
Supply of 8 SWG GI wire for cradling 04 span x02 side x25 mtr= 200 + 30%(60)= 260 mtrx0.131kg/mt- 34.06 kg
34.06
-
-
Ercetion of cradle wire 06 x 20 nos
120
-
-
Providing of 2 wire system spacer
48
-
-
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as reauired.
8
-
-
Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole as required.
8
-
-
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
4
-
-
Loading & unloading of pole from dismantle place to proposed place (Truck Departmental)
4
-
-
Dismantling of over head lines comprising of copper/ aluminum overhead conductor, G.I. wire, cross arms, insulators etc. as required Conductor 05 span x 25 mtr x 02 wire= 250 mtr x 214 kg/km= 53.50 kg Iron material-channel arm – 08 x 1.2 mtr – 9.6 mtr x 7.14 kg/mtr- 68.54 LT pin insulator- 08 set x 0.5 kg – 04.00 kg LT shackle insulator-02 set x 0.5 kg- 01.00 kg
127.04
-
-
Dismantling of light set from top of the pole
4
-
-
Fitting of light set from top of the pole
4
-
-
Extension/re-organisation of 220V O H line from near CISF barrack ‘A’ company to Karipani road weigh bridge in r/o SDOCM (RATE NOT FILLING)
1
-
-
Erection of metallic pole of following length in cement concrete 1:3:6(1 cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.Above 08 mtr upto 10 mtr long
6
-
-
Erection of all aluminium conductor of 7/1.96 mm to 7/3.10 mm diameter including binding etc. as required 06 span x 25mtr x 02 wire= 300 mtr x 214 kg/km= 64.20 kg
64.2
-
-
Supplying and erection of stay set complete (galvanised) with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle ( 20 mm X 60 cm ), 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
1
-
-
Supplying and erection of 100 mm X 110 mm shackle insulator with G. I. Bolt, nuts and straps etc. as required .
2
-
-
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required.
10
-
-
Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for 2 wire over head line complete with clamps, bolts, nuts and washer etc including drilling of holes for insulator pins etc (as per drawing) and painting with primer and finished paint as reauired.
10
-
-
Erection of pole top/ straight two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/ PCC pole as required.
10
-
-
Dismantling of pole/ street light standard/ strut embedded in cement concrete foundation etc. as required.
6
-
-
Loading & unloading of pole from dismantle place to proposed place (Truck Departmental)
6
-
-
Dismantling of over head lines comprising of copper/ aluminum overhead conductor, G.I. wire, cross arms, insulators etc. as required Conductor 06 span x 25 mtr x 02 wire= 300 mtr x 214 kg/km= 64.20 kg Iron material-chennel arm – 06 x 1.2 mtr – 7.20 mtr x 7.14 kg/mtr- 51.40 (for conductor) LT pin insulator- 10 set x 0.5 kg – 05.00 kg LT shackle insulator-02 set x 0.5 kg- 01.00 kg
121.6
-
-
Dismantling of light set from top of the pole
4
-
-
Fitting of light set from top of the pole
4
-
-
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements