Central Coalfields Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 64,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Repair Of Protection Wall For Pond And Damaged Drain Along Protection Wall An Rcc Pillar With G.i. Barbed Wire Fencing Around Wash Coal Or Raw Coal At Chp Cpp Under Chp Cpp Piparwar Area.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CCL_321364_1Tender No
GM(PPR)/Civil/24-25 /2647Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Repair of protection wall for pond and damaged drain along protection wall an RCC pillar with G.I. Barbed wire fencing around wash coal or Raw coal at CHP CPP under CHP CPP Piparwar Area.
BOQ Items
Reinforcedcementconcreteworkinwalls(anythickness),including
attachedpilasters,buttresses,plinthandstringcourses,fllets,columns,
pillars,piers,abutments,postsandstrutsetc.aboveplinthleveluptofloor
five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
8.58
8441
72426.78
SteelreinforcementforR.C.C.workincludingstraightening,cutting,bending,
placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
1933.6
75
146663.56
Centering and shuttering including strutting, propping etc. and removal of form for Walls any thickness) including attached pilasters, butteresses, plinth and string courses etc.
132
538
71115
Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
23.92
5322
127305.83
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
128
284
36448
Cementconcreteflooring1:2:4(1cement:2coarsesand:4gradedstone
aggregate)finishedwithafloatingcoatofneatcement,includingcement
slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate
88
452
39820
ProvidingandlayingNonPressureNP-3class(Mediumduty)R.C.C.pipes
includingcollars/spigotjointedwithstiffmixtureofcementmortarinthe
proportionof1:2(1cement:2finesand)includingtestingofjointsetc.
Complete 600 mm dia RCC pipes.
7.5
2612
19593
Earth work in excavation by mechanical means (Hydraulic
excavator)/manualmeansoverareas(exceeding30cmindepth,1.5min
widthaswellas10sqmonplan)includinggettingoutanddisposalof
excavatedearthleadupto50mandforalllift,asdirectedbyEngineer-in-
charge. All kinds of soil
315
128
40335.75
Filling available excavated earth (excluding rock) in trenches, plinth.
sidesoffoundationsetc.inlayersnotexceeding20cmindepth,
consolidatingeachdepositedlayerbyrammingandwatering,leadupto50m
and for all lift
315
114
36036
Surface dressing of the ground including removing vegetation and in-
equalitiesnotexceeding15cmdeepanddisposalofrubbish,leadupto50m
and lift up to 1.5 m. All kinds of soil
1400
19
27650
Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site.
210
920
193389
Drystonepitching22.5cmthicklaidincoursesandrequiredprofilewith
hammerdressedstoneshavingnosidelessthan15cm,withminimumdepth
of20cmincludingpreparingthebeddingsurfaceetc.allcomplete.(Payment
for Stone to be made separately).
1400
398
557550
PART B Earthworkinexcavationbymechanicalmeans(Hydraulicexcavator)/manual
meansinfoundationtrenchesordrains(notexceeding1.5minwidthor10
sqmonplan),includingdressingofsidesandrammingofbottoms,foralllift,
includinggettingouttheexcavatedsoilanddisposalofsurplusexcavatedsoil
as directed, within a lead of 50 m. All kinds of soil.
312.67
188
58922.66
Providingandlayinginpositioncementconcreteofspecifiedgrade
excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4(1cement:2coarsesand(zone-III)derivedfromnaturalsources:4
graded stone aggregate 20 mm nominal size derived from natural sources)
155.58
6490
1009854.22
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level : 1:1.5:3 (1cement : 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
83.59
7365
615682.15
SteelreinforcementforR.C.C.workincludingstraightening,cutting,bending,
placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
7330
75
555980.5
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
619.2
621
385018.56
FencingwithR.C.C.postplacedatrequireddistance,embeddedincement
concreteblocks,every15thpost,lastbutoneendpostandcornerpostshallbe
struttedonbothsidesandendpostonesideonly,providedwithhorizontal
linesandtwodiagonalsofbarbedwireweighing9.38kgper100metres
(minimum),betweenthetwopostsfittedandfixedwithG.I.staplesonwooden
plugsorG.I.bindingwiretiedto6mmbarnibsfixedwhilecastingthepost
(costofR.C.C.posts,struts,earthworkandconcretetobepaidforseparately)
:-Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wiremetre
21237
10
217679.25
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%