Bharat Petroleum Corporation Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2024/B/5233313Tender No
GEM/2024/B/5233313Tender Authority
Bharat Petroleum Corporation Limited ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Crossing Survey To carry out a detailed survey covering a proposed crossing for Gas Pipeline , Crossing Survey To carry out a detailed survey covering a proposed crossing for Gas Pipeline using survey instruments and giving Planimetry and ground profile Section details and levels at 5m interval scale of 1 ratio 250 1 ratio 500 in drawings in 3 copies along with original tracing as per technical specification tender document and direction of EIC Through a road boundary wall channel major drain embanKMent sewerage tunnel service tunnel and similar obstructions covering at least width as applicable on either side of proposed crossing all complete as per specifications and the direction on Engineeer in charge As per Tender Document
30
-
-
Crossing Survey To carry out a detailed survey covering a proposed crossing for Gas Pipeline , Crossing Survey To carry out a detailed survey covering a proposed crossing for Gas Pipeline using survey instruments and giving Planimetry and ground profile Section details and levels at 5m interval scale of 1 ratio 250 1 ratio 500 in drawings in 3 copies along with original tracing as per technical specification tender document and direction of EIC Through a large carriageway water body railways flyover over bridge subways and similar obstructions covering at least a width of 35m on either side of proposed crossing all complete as per specifications and the direction of Engineer in charge As per Tender Document
40
-
-
On River Water Bodies Bank , On River Water Bodies Bank As per Tender Document
240
-
-
In River Water Bodies Bed including making necessary arrangement for supplying floating plate , In River Water Bodies Bed including making necessary arrangement for supplying floating plate form boring drilling other associated equipment and shifting etc all complete As per Tender Document
375
-
-
On River Water Bodies Bank , On River Water Bodies Bank As per Tender Document
16
-
-
In River Water bodies bed including making necessary arrangement for supplying floating plate , In River Water bodies bed including making necessary arrangement for supplying floating plate form boring drilling other associated equipment and shifting etc all complete Note Measurement should be for actual depth from bed level As per Tender Document
25
-
-
Conducting Standard Penetration Tests in boreholes as specified as decided by EIC , Conducting Standard Penetration Tests in boreholes as specified as decided by EIC As per Tender Document
393
-
-
Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC , Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC As per Tender Document
73
-
-
Collecting Disturbed samples from Bore Holes , Collecting Disturbed samples from Bore Holes As per Tender Document
297
-
-
Atterbergs Limit Liquid Limit and Plastic Limit , Atterbergs Limit Liquid Limit and Plastic Limit As per Tender Document
297
-
-
Natural Moisture Content , Natural Moisture Content As per Tender Document
297
-
-
Bulk and Dry Density , Bulk and Dry Density As per Tender Document
184
-
-
Specific gravity and Void ratio , Specific gravity and Void ratio As per Tender Document
184
-
-
Ground Water level , Ground Water level As per Tender Document
41
-
-
Sieve analysis , Sieve analysis As per Tender Document
297
-
-
Shrinkage Limit , Shrinkage Limit As per Tender Document
297
-
-
Chemical Analysis of Soil and Sub soil water pH Chloride and Sulphate , Chemical Analysis of Soil and Sub soil water pH Chloride and Sulphate As per Tender Document
41
-
-
Core Recovery RQD , Core Recovery RQD As per Tender Document
20
-
-
Point Load Test , Point Load Test As per Tender Document
41
-
-
By Boring of minimum 150 mm dia boreholes as specified in specific requirement through all kinds of soil excluding hard rock , By Boring of minimum 150 mm dia boreholes as specified in specific requirement through all kinds of soil excluding hard rock As per Tender Document
1400
-
-
Drilling through rock boulder strata where SPT value is greater than 100 with minimum Nx size bit as per instruction of Engineer in charge , Drilling through rock boulder strata where SPT value is greater than 100 with minimum Nx size bit as per instruction of Engineer in charge As per Tender Document
90
-
-
Conducting Standard Penetration Tests in boreholes as specified as decided by EIC , Conducting Standard Penetration Tests in boreholes as specified as decided by EIC As per Tender Document
950
-
-
Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC , Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC As per Tender Document
190
-
-
Collecting Disturbed samples from Bore Holes , Collecting Disturbed samples from Bore Holes As per Tender Document
704
-
-
Atterbergs Limit Liquid Limit and Plastic Limit , Atterbergs Limit Liquid Limit and Plastic Limit As per Tender Document
704
-
-
Natural Moisture Content , Natural Moisture Content As per Tender Document
704
-
-
Bulk and Dry Density , Bulk and Dry Density As per Tender Document
365
-
-
Specific gravity and Void ratio , Specific gravity and Void ratio As per Tender Document
365
-
-
Ground Water level , Ground Water level As per Tender Document
44
-
-
Sieve analysis , Sieve analysis As per Tender Document
704
-
-
Shrinkage Limit , Shrinkage Limit As per Tender Document
704
-
-
Chemical Analysis of Soil and Sub soil water pH Chloride and Sulphate , Chemical Analysis of Soil and Sub soil water pH Chloride and Sulphate As per Tender Document
44
-
-
Core Recovery RQD , Core Recovery RQD As per Tender Document
20
-
-
Point Load Test , Point Load Test As per Tender Document
44
-
-
To carry out detailed Topographic Survey at different locations of Plots Area of SV Station CNG Stations etc , To carry out detailed Topographic Survey at different locations of Plots Area of SV Station CNG Stations etc along with survey of the approaches of these stations from the nearest roads using survey instruments and giving complete details in the form of drawings in the scale of 1 ratio 100 and reports in 4 copies on white paper sheets and editable CAD output on CD DVD all complete as per specifications drawings and direction of the Engineer in charge As per Tender Document
100
-
-
By Boring of minimum 150 mm dia boreholes upto a max depth as specified or refusal strata REFUSAL means when N greater than 100 for 30 cms of penetration in all type of soil , By Boring of minimum 150 mm dia boreholes upto a max depth as specified or refusal strata REFUSAL means when N greater than 100 for 30 cms of penetration in all type of soil As per Tender Document
200
-
-
Drilling through rock boulder strata where SPT value is greater than 100 with minimum Nx size bit as per instruction of Engineer in charge , Drilling through rock boulder strata where SPT value is greater than 100 with minimum Nx size bit as per instruction of Engineer in charge As per Tender Document
2
-
-
Conducting Standard Penetration Tests in Boreholes as specified as decided by EIC , Conducting Standard Penetration Tests in Boreholes as specified as decided by EIC As per Tender Document
14
-
-
Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC , Collecting 100 mm dia undisturbed sample form boreholes as specified as decided by EIC As per Tender Document
6
-
-
Collecting Disturbed samples from Bore Holes , Collecting Disturbed samples from Bore Holes As per Tender Document
8
-
-
Atterbergs Limit Liquid Limit and Plastic Limit , Atterbergs Limit Liquid Limit and Plastic Limit As per Tender Document
14
-
-
Natural Moisture Content , Natural Moisture Content As per Tender Document
14
-
-
Bulk and Dry Density , Bulk and Dry Density As per Tender Document
14
-
-
Specific gravity and Void ratio , Specific gravity and Void ratio As per Tender Document
14
-
-
Ground Water level , Ground Water level As per Tender Document
2
-
-
Grain Size Analysis and IS Classification , Grain Size Analysis and IS Classification As per Tender Document
12
-
-
Direct Shear Test , Direct Shear Test As per Tender Document
2
-
-
Chemical Analysis of Soil and Sub soil water pH Chloride and Sulphate , Chemical Analysis of Soil and Sub soil water pH Chloride and Sulphate As per Tender Document
2
-
-
Core Recovery RQD , Core Recovery RQD As per Tender Document
2
-
-
Point Load Test , Point Load Test As per Tender Document
2
-
-
Permission Railway Obtaining permission for laying gas pipeline along with OFC cable from appropriate railways authority for crossings at desired location , Permission Railway Obtaining permission for laying gas pipeline along with OFC cable from appropriate railways authority for crossings at desired location witihn 4 months of intimation given by BPCL to bidder for applying NOC At each crossing location application for permission needs to be seperatey applied for pipeline with carrier pipe and OFC with duct For measurement purpose these 2 application for each location will be counted as seperate one As per Tender Document
1
-
-
Permission NH along Obtaining permission for laying Gas pipeline along with OFC cable from apropriate NH authority for laying along the RoU of National highway , Permission NH along Obtaining permission for laying Gas pipeline along with OFC cable from apropriate NH authority for laying along the RoU of National highway within 6 months of intimation given by BPCL to bidder for applying NOC At each crossing location application for combined permission needs to be applied for pipeline with carrier pipe and OFC with duct For measurement purpose payment against this line item will be paid on per KM length of highway for which approval has been obtained Note This permission should also include permission for any roads which are connecting to or terminating at highway and are within the RoU of the highway even if the permission for these roads is required to be obtained from seperate authority bidder will obtain permission from same without any additional cost As per Tender Document
80
-
-
Permission NH Crossings Obtaining permission for laying gas pipeline along with OFC cable from appropriate NH authority for crossings at desired location , Permission NH Crossings Obtaining permission for laying gas pipeline along with OFC cable from appropriate NH authority for crossings at desired location within 6 months of intimation given by BPCL to bidder for applying of NOC At each crossing location application for combined permissions needs to be applied for pipeline with carrier pipe and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if seperate applications are applied for pipeline and OFC at crossing location As per Tender Document
10
-
-
Permission SH Along Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate SH Authority for laying along the ROU , Permission SH Along Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate SH Authority for laying along the ROU of National Highway within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with carrier pipe and OFC with duct For measurement purpose payment against this line item will be paid on per KM length of highway for which approval has been obtained Note This permission should also include permission for any roads which are connecting to or terminating at Highway and are within the ROU of the Highway Even if the permission for these roads is required to be obtained from separate authority bidder will obtain permission from same without any additional cost As per Tender Document
30
-
-
Permission SH Crossings Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate SH Authority for crossings , Permission SH Crossings Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate SH Authority for crossings at desired location within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with carrier pipe and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location As per Tender Document
10
-
-
Permission Canal Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings , Permission Canal Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with without carrier pipe or as desired by Authority and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location As per Tender Document
10
-
-
Permission River Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings , Permission River Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with without carrier pipe or as desired by Authority and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location B28 ratio B29 As per Tender Document
7
-
-
Permission Water Bodies Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings , Permission Water Bodies Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with without carrier pipe or as desired by Authority and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location As per Tender Document
30
-
-
Permission Major District Roads Obtaining permission for laying Gas pipeline along with OFC cable , Permission Major District Roads Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with without carrier pipe or as desired by Authority and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location As per Tender Document
25
-
-
Permission Gram Panchayat Roads Obtaining permission for laying Gas pipeline along with OFC cable , Permission Gram Panchayat Roads Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 4months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with without carrier pipe or as desired by Authority and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location As per Tender Document
25
-
-
Permission OFC Telephone Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority , Permission OFC Telephone Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 4 months of intimation given by BPCL to bidder for applying for NOC At each crossing location application for combined permission needs to be applied for pipeline with without carrier pipe or as desired by Authority and OFC with duct For measurement purpose at each crossing location permission so obtained for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC at single crossing location As per Tender Document
15
-
-
Permission State PWD Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority , Permission State PWD Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for particular area location as instructed by BPCL within 4 months of intimation given by BPCL to bidder for applying for NOC For measurement purpose permission letter so obtained for the particular area for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC As per Tender Document
30
-
-
Permission Development Authority Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority , Permission Development Authority Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for particular area location as instructed by BPCL within 4 months of intimation given by BPCL to bidder for applying for NOC For measurement purpose permission letter so obtained for the particular area for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC As per Tender Document
10
-
-
Pollution Control Board , Pollution Control Board As per Tender Document
3
-
-
Fire Fighting Board , Fire Fighting Board As per Tender Document
3
-
-
Irrigation Board , Irrigation Board As per Tender Document
2
-
-
PESO NOC of All Kinds Of Pipeline Works STPL Line BPCL Line CNG Station CGS Station Etc , PESO NOC of All Kinds Of Pipeline Works STPL Line BPCL Line CNG Station CGS Station Etc As per Tender Document
15
-
-
Pradhan Mantri Gramin Sadak Yojana , Pradhan Mantri Gramin Sadak Yojana As per Tender Document
4
-
-
Any Other Authority , Any Other Authority As per Tender Document
4
-
-
Permission RoU from Land owner Obtaining permission for laying Gas pipeline along with OFC cable from Private Land Owner , Permission RoU from Land owner Obtaining permission for laying Gas pipeline along with OFC cable from Private Land Owner for particular area location as instructed by BPCL within 4 months of intimation given by BPCL to bidder for applying for NOC For measurement purpose permission letter so obtained for the particular area for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC As per Tender Document
10
-
-
Permission Municipal Obtaining permission for laying Gas pipeline along with OFC cable , Permission Municipal Obtaining permission for laying Gas pipeline along with OFC cable from Municipal Council Municipal Corporation Municipal Committee for particular area location as instructed by BPCL within 4 months of intimation given by BPCL to bidder for applying for NOC For measurement purpose permission letter so obtained for the particular area for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC Rate will be inclusive of preperation & submission of Drawing etc As per Tender Document
4
-
-
Permission Social Forest Obtaining permission for laying Gas pipeline along with OFC cable from Forest Department , Permission Social Forest Obtaining permission for laying Gas pipeline along with OFC cable from Forest Department for Social Forest within 6 months of intimation given by BPCL to bidder for applying for NOC For measurement purpose permission letter so obtained for the particular area for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC 1 All range area will be considered as one As per Tender Document
4
-
-
Permission Protected Reserved Forest Obtaining permission for laying Gas pipeline along with OFC cable , Permission Protected Reserved Forest Obtaining permission for laying Gas pipeline along with OFC cable from Forest Department for Protected Reserved Forest within 6 months of intimation given by BPCL to bidder for applying for NOC For measurement purpose permission letter so obtained for the particular area for pipeline and OFC will be treated as one single Quantity will be treated as one 1 even if separate applications are applied for Pipeline and OFC 1 All range area will be considered as one As per Tender Document
2
-
-
Obtaining Power Connection Bidder will apply and get power connection HT or LT for BPCLs premises station , Obtaining Power Connection Bidder will apply and get power connection HT or LT for BPCLs premises station This includes preapring the file technical details regarding connection load peak load etc will be provoded by BPCL to the bidder submitting the file and getting power connection at site Time line for the job will be 3 months As per Tender Document
5
-
-
Area Survey for MDPE Network To carryout Area survey and propose a feasible route for laying the proposed pipeline network , Area Survey for MDPE Network To carryout Area survey and propose a feasible route for laying the proposed pipeline network and to identify and record all the features of the area surveyed along with building structures drains pavements roads etc and including those likely to have bearing on alignment of proposed pipeline and to propose a pipeline route with respect to plot boundary giving offset from the nearest boundary which will have least obstruction marking obstruction if any identify the type of building type of road back lanes required to be cut to lay the pipelines all the field data to be collected superimposing the same on digitized satellite high resolution image and developing the drawings maps in scale 1 ratio 250 with full details marked check and confirm completeness of data all complete as per specifications drawings and direction of the engineer in charge and giving drawings in 4 copies along with original tracing and CAD output on CD As per Tender Document
130
-
-
Carrying out subsurface utility survey along the proposed pipeline route and or as specified by Eingineer In Charge for 5 m , Carrying out subsurface utility survey along the proposed pipeline route and or as specified by Eingineer In Charge for 5 m corridor using Ground Penetrating Radar GPR for depth upto 5 m below the existing ground level to locate and identify all existing underground utilities buried objects including but not limited to pipelines sewers conduits cables drain manholes appurtenances etc in the proposed corridor along with location DGPS coordinates depth shape and dimensional detals of utilities Four 4 copies of report and drawing incorporating all collected datas shall be submitted as per scope of work and direction of Engineer in charge Scale of drawing shall be Planimetry X axis 1 ratio 1000 Y axis 1 ratio 100 Longitudnal Section Z axis 1 ratio 100 and Transverse section at critical location As per Tender Document
40
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements