National Highways And Infrastructure Development Corporation Limited Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Eprocure
Opening Date29 Jun 2021
Closing Date4 Aug 2021
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Nhidcl/jk/nh-244/ K-k/ae(p345)/2021-22
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NHIDC_636175_1Bid Award Id
ViewTender No
NHIDCL/JK/NH-244/ K-K/AE(P345)/2021-22Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Bridge/Structural Engineer (1 No)
24
-
-
Senior Quality Cum Material Expert (1 No)
24
-
-
Senior Contract Specialist (1 No)
8
-
-
Road Safety Expert (1 No)
18
-
-
Sub-Professional Staff
-
-
-
Survey Engineer, 3 Nos.
60
-
-
Assistant Highway Engineer, 3 Nos.
120
-
-
CAD Expert
12
-
-
Lab technician (3Nos.)
60
-
-
Assistant Bridge Engineer, 3Nos.
120
-
-
Quantity Surveyor, 3 Nos.
68
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager (1 No)
84
-
-
Accountant Cum Cashier (1 No)
84
-
-
Steno cum Computer operator (1 No)
84
-
-
Office Boy (1 No)
84
-
-
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
-
-
-
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (1 nos during Construction Period and 1 nos during Maintenance Period.)
84
-
-
Bolero or equivalent 4x4 vehicle(not more than 3 years old) (3 nos during Construction Period and 1 nos during Maintenance Period.)
120
-
-
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 24 round trip to Employer's Head Office and 24 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
1
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
-
-
-
One Office of Minimum 200 sqm area shall be rented during Construction Period
24
-
-
One Office of Minimum 50 sqm area shall be rented during Maintenance Period
60
-
-
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
-
-
-
During Construction Period
24
-
-
During Maintenance Period
60
-
-
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs–Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water Coolers and Software, Plotter, Biometric device etc.
-
-
-
During Construction Period
24
-
-
During Maintenance Period
60
-
-
Reports and Document Printing
-
-
-
Monthly reports
252
-
-
Half yearly Reports
42
-
-
Various other reports as provided in the Concession Agreement such as Completion Report
12
-
-
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
-
-
-
Surface defects detection and roughness measurement
using Network Survey Vehicle (45.14 kms x 8 times)
361.12
-
-
Pavement strength measurement using FWD (45.14kms x 4 times)
180.56
-
-
Bridge inspection using Mobile Bridge Inspection Unit (45.14kms x 8 times)
361.12
-
-
Road signs inspection using Retro Reflectometer (45.14kms x 8 times)
361.12
-
-
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements