Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Ministry Of Defence

  • Opening Date

    07 Oct 2019

  • Closing Date

    17 Oct 2019

  • Tender Amount

    Refer document

  • EMD

    -

Reminder

Follow

Download
Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Prefab Shelters With Puf Panel Of Size : 7.620 M X 18.491 M (as Per Gem Drawing)

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

Bid Number: GEM/2019/B/379551 Dated: 07-10-2019 Bid Document Bid Details Bid End Date/Time 17-10-2019 20:00:00 Bid Life Cycle (From Publish Date) 90 (Days) Bid Offer Validity (From End Date) 30 (Days) Ministry/State Name Ministry Of Defence Department Name Department Of Defence Organisation Name Border Road Organisation Office Name 16 Brtf Total Quantity 2 Item Category Prefab Shelters With PUF Panel of Size : 7.620 M X 18.491 M (As Per GeM Drawing) MSE Exemption For Years Of Experience And Turnover No Startup Exemption For Years Of Experience And Turnover No Bid to RA enabled Yes Prefab Shelters With PUF Panel Of Size : 7.620 M X 18.491 M (As Per GeM Drawing) ( 2 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC Type and Size of Prefab Shelter TYPE B8 having Outside size 7.620 M x 18.491 M with PUF Insulated Panel of 80 mm including Full length Verandah and without Toilets. TYPE B8 having Outside size 7.620 M x 18.491 M with PUF Insulated Panel of 80 mm including Full length Verandah and without Toilets. Structure of Shelter As per layout drawings conforming to GeM Drg. No. 1 to Drg. No. 12 and Perspective As per layout drawings conforming to GeM Drg. No. 1 to Drg. No. 12 and Perspective 1 / 13 view of roof with arrangement of Purlins and Columns for shelter - Floor structure - Steel footings - roof - doors - windows - Ventilators - Base frame - Floor panels with constructional details of the main structural members - as per GeM drg. uploaded at QR SPCN DOCUMENT. view of roof with arrangement of Purlins and Columns for shelter - Floor structure - Steel footings - roof - doors - windows - Ventilators - Base frame - Floor panels with constructional details of the main structural members - as per GeM drg. uploaded at QR SPCN DOCUMENT. Design / Drawing of TYPE B8 As per GeM DRAWING DOCUMENT uploaded. * Scope of supply (Offer Price to include all cost components) Supply - Installation - Testing and Commissioning of Prefab Shelter - including Electrical wiring & Fittings as well as Plumbing and Sanitary fittings. Supply - Installation - Testing and Commissioning of Prefab Shelter - including Electrical wiring & Fittings as well as Plumbing and Sanitary fittings. Transpotations / Freight charges Offer Prices are on Free Delivery at Consignee site basis. Offer Prices are on Free Delivery at Consignee site basis. Approval of Advance sample before Bulk Supply After award of contract - Seller shall have to get Advance sample approved from Buyer before manufacturing / starting Bulk supplies - Buyer shall approve / provide list of modifications required within 10 days of offer of advance sample - If there is delay in approval of advance sample from Buyer side - the delivery period shall be regularized for the period of delay in sample approval. After award of contract - Seller shall have to get Advance sample approved from Buyer before manufacturing / starting Bulk supplies - Buyer shall approve / provide list of modifications required within 10 days of offer of advance sample - If there is delay in approval of advance sample from Buyer side - the delivery period shall be regularized for the period of delay in sample approval. Foundation for Prefab Shelter No Foundation required - can be erected on any flat surface. No Foundation required - can be erected on any flat surface. Time Period for Completion of Erection work at site by Seller Within 45 days of the date of receipt of consignee's confirmation regarding Readiness of site for erection Within 45 days of the date of receipt of consignee's confirmation regarding Readiness of site for erection 2 / 13 Payment Terms Bill / invoice to be submitted in two parts by seller (80% and 20%). Payment for initial 80% to be made within ten (10) days of receipt of goods by consignee. Bill for balance 20% to be raised by sell

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.