Military Engineer Services Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Military Engineer Services - MES Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date14 Jan 2025
Closing Soon3 Feb 2025
Tender Amount₹ 48,00,000
Costs
EMD
₹ 96,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_693232_1Tender No
CWE/U(U)-69/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Repair / maintenance of lifts including carrying out daily check and Periodical servicing by rep of OEM of the lift at Ashok Vihar (13 Passenger - 01) to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
11
-
-
... More
Notes for item No 1.00 to 4.00:-
Brake:- Clean if oil and trace source of oil leakage. Adjust clearance between shoes and drum, clean contacts, check tape safety switch, lubricate shaft bearing, Check tape safety switch. Governor: Check that the levers work smoothly, check that electrical contacts opens before the rope gets locked. Ropes:- Check condition of hoist ropes and governor ropes, Check slack rope if too dry. Hoist way: Lubricate guides and guide shoes, check that the buggers are in porper position and measure and record counter weight buffer cleans with car at the top. Retring car and locks: Check operation of car an lock from the top at each landing , check that retiring car solenoid is not getting over heated and that movemnet of car is smooth, check all the locks are functioning properly mechanically and electrically after opening the covers check all sets screws and springs and replace if necessary the lever should lock the brake properly,
-
-
-
... More
Notes(contd....):- check that the retiring car does touch the lock roller at the landing which is being passed, check that car gate switch operated properly, check condition of traveling cable and termination at junction boxes, check guide clamps and adjust, after physical inspection, get the lift to over travel by holding from the controller and see that the switches operate properly, check door closer safety, clean and adjust, if necessary, lubricate top track and door motor and linkage, check that landing doors can be opened by emergency keys. Machine room: Check and adjust overload relay and phase failure relay, check power wiring termination in switch, motor , controller and power switching relays, check lubricants of all equipments.
-
-
-
... More
(i) Notes (contd..): The Lowest Bidder will submit MOU on the stamp paper of Rs 100 as per specified performa given by the deptt from the OEM i.e M/s Thyssenkrupp Elevator India Pvt Ltd within fifteen days of AOC for 11 months, failing which the contract shall be liable for cancellation & further action shall be taken as per the policy in vogue against the defaulter.
(ii) The contractor will conclude AMC with OEM and copy of the Agreement alongwith tax invoice will be submitted to the Engineer-in-Charge and GE before commencement of AMC, no payment will be made to the contractor without submission of valid AMC agreement. (iii) The material likely replace for maint of the lift i.e. Lop/LCU, Cop/CCU, MCV, Landing Door Shoe, Contracts, Car Door Shoe, Coupler Door Motor, Drive Door, Trailing Cable, Buttons, Spring Landing Doorm, Roller, Relays, Main Drive, Rectifier, SMPS, CTU, Alarm PCB, Single PhaseePreventor, VVVF Drawing,COP/Deisplay, Sensor, Limit Switch, Read Switch, Read Switch, Stop Switch, COP/LOP etc. will be measure separately as per respective item of schedule.
-
-
-
... More
Notes (contd..): (iv) The Contractor has to carry out the repair/maintenance of the Lifts through OEM only. (v) The repair/maintenance should cover any/all parts of Lifts if its fucntions found defective the same should be repaired or replaced by the OEM as per the timeline covered under norms.
(vi) One mechanic shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift. (vii) Rewinding of motor if required will be done by the contractor and no extra cost will be given by the department.
(viii) The detailed lift mechanics of the firm shall report to the JE Concerned at the Lift complaint cell for receiving the complaints at round the clock daily including sunday and holiday.
(ix) The detailed lift mechanics shall sign ( Their shift wise) in the attendence register kept with lift cell.
(x) Cost of minor spare parts / routine material required for above mentioned maintenance is deemed to be included in the quoted rate except items mentioned here-in-after. No additional cost of spares is admissible for the above maintenance. Decision of the Accepting Officer shall be final & binding regarding minor spares/ routine material.
-
-
-
... More
Notes (contd..) : (xi) Monthly schedule for proper maintenance of lift and necessary documentation including all spare parts required to be replaced during the period shall be as directed by Engineer-in-Charge.
(xii) All minor spare parts and parts required for repair / replacement for maintenance of lifts to be replaced during repair/maintenance at no extra payment.
(xiii) Bidders are to submit license from Govt. of J&K for maintenace & erection of lifts issued by chief electrical inspector.
-
-
-
... More
Taking down induction Motor(Traction Machine 9 KW,Gear Ratio; 49:1,Traction sheave Spec ɸ 620 x 5x ɸ 13) from foundation to machine room of lift by disconnecting electrically and mechanically, loading / inculding transporting to workshop for repair rewinding with ISI marked copper winding wire of existing gauge /size ISI marked insulating paper, varnish, replacement of bearings two Nos. of DE and NDE etc transporting back the motor after repairs, installing on foundation, aligning the same reconnecting electrically and mechanically and testing on Full load for satisfactory functioning complete all as specified and directed by Engr-in-Charge.
1
-
-
... More
Taking down induction Motor(Traction Machine 5.5 KW,Gear Ratio; 49:1,Traction sheave Spec ɸ 620 x 5x ɸ 13) from foundation to machine room of lift by disconnecting electrically and mechanically, loading / inculding transporting to workshop for repair rewinding with ISI marked copper winding wire of existing gauge /size ISI marked insulating paper, varnish, replacement of bearings two Nos. of DE and NDE etc transporting back the motor after repairs, installing on foundation, aligning the same reconnecting electrically and mechanically and testing on Full load for satisfactory functioning complete all as specified and directed.
1
-
-
... More
S&F in replacement of Landing door shoe of lift, make as per sample complete all as specified and directed.
4
-
-
... More
S&F in replacement of Door motor of lift, make as per sample complete all as specified and directed.
10
-
-
... More
S&F in replacement of Door open drive of lift, make as per sample complete all as specified and directed.
2
-
-
... More
S&F in replacement of Trailing cable of lift, make as per sample complete all as specified and directed.
90
-
-
... More
S&F in replacement of Push button of lift, make as per sample complete all as specified and directed.
45
-
-
... More
S&F in replacement of Spring Landing door of lift, make as per sample complete all as specified and directed.
5
-
-
... More
S&F in replacement of roller of lift, make as per sample complete all as specified and directed.
60
-
-
... More
S&F in replacement of Relays of lift, make as per sample complete all as specified and directed.
12
-
-
... More
S&F in replacement of Rectifier of lift, make as per sample complete all as specified and directed.
14
-
-
... More
S&F in replacement of Cabin Display of lift , make as per sample complete all as specified and directed.
5
-
-
... More
S&F in replacement of Cabin light of 9 watt of lift , make as per sample complete all as specified and directed.
60
-
-
... More
S&F in replacement of Blower fan 300 mm heavy duty suitable for AC 230 Volt of lift , make as per sample complete all as specified and directed.
16
-
-
... More
S&F in replacement of APC/UPS with battery 12 volt 18 Ah, Model 3000 VA, make as per sample complete all as specified and directed.
5
-
-
... More
S&F in replacement of Battery 12 Volt, 18 Ah / 7 Ah of lift , make as per sample complete all as specified and directed.
30
-
-
... More
S&F in replacement of Landing circuit Unit ((LOP/LCU) of lift, make as per sample complete all as specified and directed.
10
-
-
... More
S&F in replacement of Main Circuit Board (MCU) of lift, make as per sample complete all as specified and directed.
9
-
-
... More
S&F in replacement of Main drive of lift, make as per sample complete all as specefied and directed.
2
-
-
... More
S&F in replacement of Car door shoe of lift, make as per sample complete all as specified and directed.
10
-
-
... More
S&F in replacement of Door sensor for cabin as per sample complete all as specefied and directed.
2
-
-
... More
S&F in replacement of Brake liner of lift, make as per sample complete all as specefied and directed.
12
-
-
... More
S&F in replacement of Brake sensor of lift, make as per sample complete all as specefied and directed.
10
-
-
... More
S&F in replacement of tensioning device of lift, make as per sample complete all as specefied and directed.
5
-
-
... More
S&F in replacement of Rope Gripper of lift, make as per sample complete all as specified and directed.
4
-
-
... More
S&F in replacement of Brake coil of lift, make as per sample complete all as specefied and directed.
5
-
-
... More
S&F in replacement of Rope of lift, make as per sample complete all as specefied and directed.
55
-
-
... More
S&F in replacement of Transformer Ratio(TRF) 110 Volt to 230 volt of lift , make as per sample complete all as specefied and directed.
4
-
-
... More
S&F in replacement of door safety relays , make as per sample complete all as specefied and directed.
5
-
-
... More
S&F in replacement of inspection switch of lift , make as per sample complete all as specefied and directed.
3
-
-
... More
S&F in replacement of line choke of lift , make as per sample complete all as specefied and directed.
2
-
-
... More
S&F in replacement of Car door belt , make as per sample complete all as specefied and directed.
10
-
-
... More
S&F in replacement of single phase priventer (SSP), make as per sample complete all as specified and directed.
6
-
-
... More
S&F in replacement of 12 watt LED Bulb for maintenance duct, make as per sample complete all as specified and directed.
65
-
-
... More
S&F in replacement of Switch Mode Power Supply unit (SMPS), make as per sample complete all as specified and directed.
2
-
-
... More
S&F in replacement of Rescue/Emergency alarm system with speeker, make as per sample complete all as specefied and directed.
15
-
-
... More
S&F in replacement of Landing door male female contact, make as per sample complete all as specified and directed.
10
-
-
... More
M&L for carry out Servicing/ Calibration of APC/ UPS with Battery 12 Volt, 18 Ah, Model 3000 VA, make as per sample complete all as specified and directed.
34
-
-
... More
S&F in replacement of electronic CTU card of lift , make as per sample complete all as specefied and directed.
8
-
-
... More
S&F in replacement of electronic ATS, 100 Amps, 415V, 50/60Hz, l closing=3A/230V, l tripping=0.5A/230v for lift , make standard/L&T complete all as specefied and directed.
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%