Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Military Engineer Services - MES Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date15 Jan 2025
Closing Date11 Feb 2025
Tender Amount₹ 85,97,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Description all as per Srl item No 1 here-in-before but for transformer of capacity 500 KVA.

1

-

-

... More
Notes for ser item No 1 to 4 :- (a).Taking down old existing transformer and placing new one as mentioned in above item. The same will be shifted to MES store yard as per direction by Engr-in-Charge. (b). The rate of above work will be deemed in quoted rate in respective items of BOQ. (c) The transformer oil shall be fresh and approval certificate from manufacturer shall be obtained by contractor and furnished to GE. the copper shall be 99.97% purity and approval certificate from manufaturer shall be obtained by contractor and furnished to GE. (d) Pre -commisioning, inspection of transformer shall be carried out by rep of Accepting offr and T&P for the inspection shall be arrange by contractor, cost of the T&P etc for testing shall deemed to be included in the unit rate.

-

-

-

... More
M&L for earthing complete with Galvanized earth plate electrode 600 mm x 600mm x3.15mm thick buried directly in ground ( earth pit not less than 2.25 mtr below normal ground level ) with top edge plate not less than 1.5 metre below normal ground level and covered with alternate compact layer of comen salt and charcol dust, connected to Galvanized earth strip of size 20x3mm as earthing lead by means of bolts, nuts, chuck nuts and washers of Copper earth lead including PCC pit in PCC 1:2:4 type B-1 RCC cover made out of cement concrete 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate) reinforced with TMT steel bars 8 mm dia @150 mm c/c both ways with suitable handle and angle iron 40x40x5mm frame, GI medium grade watering pipe 20mm bore and funnel with wire mesh light grade protection pipe 40mm bore up to main board complete as shown on electrical plate No 3 of MES Sch 2009 (Part-I) and connected to earthing test point all as specified and directed by Engr-in-charge. Note: On testing after completion of earthing, if desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk & cost to the entire satisfaction of Engineer-in-charge. Note :-1. Cost of following items are deemed to be included in unit rate:-

12

-

-

... More
Srl item No 6 Contd … (a) 15 mm nominal bore light grade GI protection pipe 7.5 mtr long for protection of earthing lead from mechanical injury or tempering. (b) Requisite quantity of common salt and charcoal. (c) Testing of earthing. Note : On testing after completion of earthing, if the desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk and cost to the entire satisfaction of the Engineer-in-Charge.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.