Himachal Pradesh Irrigation And Public Health Department Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh Irrigation And Public Health Department - HPIPH Tender
Eprocure
Opening Date29 Jun 2021
Closing Date6 Jul 2021
Tender AmountRefer Documents
Costs
EMD
₹ 39,687Document Cost
₹ 400Tender Fee
Refer Documents
Summary
C/o Lis Gugra Khad To C.v Manjhadesh For Horticulture Land In G.p Chowai In Anni Block Distt. Kullu (h.p)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_HPIPH_49181_1Bid Award Id
ViewTender No
5251-5302(Anni)Tender Authority
Himachal Pradesh Irrigation And Public Health Department ViewPurchaser Address
-Website
http://http://hpiph.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
HDPE Pipe 63mm OD PN-4
1200
-
-
... More
Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of earth work such as pick work, jumper work, situated soil including bailing or pumping out of water, blasting soft or hard rock or chiseling or wedding out of soft/hard rock where blasting is prohibited, in all lifts including trimming and dressing of sides, labeling of beds to correct grade including shoring, strutting, planking, timbering and dewatering wherever required. Stacking usable and unusable material /soil separately and after lying jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed with in all leads/ lifts including restoration of un-metalled surfaces to its original conditions and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. Complete in all respects within all lee\ads and lifts as per direction of the Engineer-in-Charge. ( For C/O Under GroundStorage Tanks)
183.02
-
-
... More
Providing and laying cement concrete 1:4:8(1cement: 4sand: 8 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. a) Foundation and plinth.
16.76
-
-
... More
Providing and laying cement concrete 1:1 ½ :3(1cement:1 ½ sand:3graded stone aggregate of 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge.
-
-
-
... More
Foundation footing , basis of columns and the like and mass concrete.
16.76
-
-
... More
Walls (any thickness) but not less that 0.10 Mtrs. thick including attached pilasters buttresses plinth and string course from top of foundation upto floor two levels.
32.64
-
-
... More
Providing & Laying mild /tor steel reinforcement for RCC. work including bending, binding and placing in position complete up to floor two level complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge.
3706
-
-
... More
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge.
-
-
-
... More
Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like
422.47
-
-
... More
Steel work in single sections including cutting,hoisting,fixing in position and applying a priming coat of red lead paint iIn single stanchions composed of rolled steel joists or channels with caps bases ,splices ,angles ,brackets etc. within all leads and lifts as per the direction of Engineer-in-charge.
6.24
-
-
... More
Providing & fixing of machnined wovened G.I wire fencing SWG-6 ( 5mm thick)of mesh size 50X50mm including straighting,bolting and fixing of M.S staples etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-charge.
80.51
-
-
... More
Providing & fixing of 1.80 metre high fencing with 2.50 metre angle Iron post 50X50X6 mm , 2.50 metre centre to centre with nine horizontal lines and two diagonals of galvanised steel bar bed wire (IS:278-1962 type-I) weighing 9.38 kg/per 100 metre (minimum) strained and fixed to posts with G.I. staples, straining, i/c cost of providing red oxide paint and cost of barbed wire etc. complete within all leads and lifts as per the direction of Engineer-in-charge.
197.72
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements