Translational Health Science And Technology Institute Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 4,83,440Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_THSTI_479452_1Bid Award Id
ViewTender No
THSTI/Engg./Civil/Fbd/19-20/01Tender Authority
Translational Health Science And Technology Institute ViewPurchaser Address
-Website
http://http://thsti.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Ordinary Rock
834
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
799
-
-
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
4525
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level:
-
-
-
1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
70
-
-
Centring and shuttering including strutting, propping etc. and removal of form for :
-
-
-
Foundations, footings, bases of columns, etc. for mass concrete.
528
-
-
Steel Reinforcement for R.C.C. work, including straightening, cutting, bending, placing in position and binding all complete up to plinth and above plinth level.
-
-
-
Thermo-mechanically treated bars
20079
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to top coping of boundary wall:
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
182.54
-
-
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including removing from ground, lifting, cutting, dressing and carriage of stone available at site etc. complete as per the instructions of Engineer-In-Charge. (The Stone boulders stacked in the cluster premises shall be used free of cost for masonry work).
695
-
-
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) above plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including removing from ground, lifting, cutting, dressing and carriage of stone available at site etc. complete as per the instructions of Engineer-In-Charge. (The Stone boulders stacked in the cluster premises shall be used free of cost for masonry work).
956
-
-
Dry stone masonry / pitching with hard stone in plinth and superstructure upto 2.9 Mtr high including filling soil in stone voids (if required) including removing boulders from the deginated area with in the cluster premises, lifting, cutting, dressing and carriage of stone within the site etc. complete as per design enclosed in the NIT & the instructions of Engineer-In-Charge. (The Stone boulders stacked in the cluster premises shall be used free of cost for masonry work).
5174
-
-
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
-
-
-
With G.I. barbed wire
6789
-
-
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
5609
-
-
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately).
2263
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements