Northern Railway Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 2,29,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
OT-321-UMB-2024-25-AMBALA DIVISION-ENGG/NORTHERN RLYTender No
OT-321-UMB-2024-25Tender Authority
Northern Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
I/R For complete construction of natural cricket pitch as per cricket guidelines. including step of 1.5' depth excavation, 1st layer of pitch 2" brick rodi, 2nd layer of pitch with sand 1 filling, 3rd layer bricks laying, 4th layer of 1" sand filling after anti termite of bottom and top of layer, 5th layer of laying and compaction of 8" thick good quality black pitch soil and after burmunda grass on top of pitch. including service of curator etc as a complete job with contractor's own labour, T&P, handling & re- handling, leading, loading, unloading, taxes, GST etc. so nothing extra shall be paid to the contractor except the accepted rates, whatsoever the case may be.
2160
300
648000
... More
Supply of chain link fabric mesh of size 50X50 mm size made of GI wire of 4 mm dia. PVC Coated to outer Dia of 5 mm. including all fittings & fixtures etc as a complete job with contractor's own labour, T&P, handling & re- handling , leading, loading, unloading, taxes, GST etc. so nothing extra shall be paid to the contractor except the accepted rates, whatsoever the case may be.
450
900
405279
... More
I/Rate for topography survey and preparation of Drainage/sewerage Plan by taking levels of the area for designing and planning for surrounding drainage/sewerage system. Ground Levels and Invert Levels of project area to be taken using DGPS and establishing GCPs (ground control points) with the help of DGPS (Differential Global Positioning) including submission duly 3 incorporating the suggested corrections and modifications and supplying the final plot on approved quality & transparent media with Two copy of prints complete and soft copy, as directed by Engineer in-charge Note: (i) Drawings shall be prepared by using latest drawing making softwares and printing shall be done on high end latest plotters as a complete job with contractor's own labour, T&P, handling & re- handling , leading, loading, unloading, taxes, GST, planning etc. so nothing extra shall be paid to the contractor except the accepted rates, whatsoever the case may be.
60
4130
247800
... More
I/Rate for detailed orthographic mapping of area through drone to be done for 4 planning & designing for surrounding drainage/sewerage system. Photo & Survey drawing in hard as weel as soft will be submitted to Engineer incharge as a complete job with contractor's own labour, T&P, handling & re- handling, leading, loading, Planning, unloading, taxes, GST, planning etc. so nothing extra shall be paid to the contractor except the accepted rates, whatsoever the case may be.
60
826
49560
... More
%age above, at par or below on all Chapter of DSR 2021 Edition.
-
-
4379459.99
... More
%age above, at par or below on all items of all chapter appear in all chapter USSOR- 2021 edition.
-
-
51026.79
... More
I/R for construction of Natural Running Track with excavation, compacted earth filling 1 and then 1st layer of 50mm aggregate (Rodi), 2nd layer of 2" thick black soil and 3rd layer of 2" thick moorum, as per decision of site engineer with all materials, T&Ps etc. all taxes, octroi, loading, leading, unloading etc. complete job. Nothing extra shall be paid on this account whatsoever the case may be.
32000
150
4800000
... More
I/R for submission of structural design & detailed drawing of RCC foundation, fabricated column, Girder, catwalk slabs, superstructure, trusses, purlin, Gantry girder and associated structural members, AC sheeting, end sheeting girder of steel, stone masonry structure and any other steel & RCC structure required for construction of infrastructure facilities etc as per railway codes & specifications. Design & drawing of RCC/steel work shall be in the form of report duly proof checked by Govt. Engineering college /NIT's and will be submitted for approval of Railway. Payment shall be made after approval of design and drawing of RCC/Steel work by competent authority.
1100
64
71324
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%