Military Engineer Services Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 70,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_702979_1Tender No
GE/GUR-/NIT-74/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Running capacitor 36 MFD Make: Bentex/Delcon
15
-
-
... More
Running capacitor 45 MFD Make: Bentex/Delcon
15
-
-
... More
Starting capacitor 100-120 MFD Make:- Bentex/Delcon.
15
-
-
... More
Starting capacitor 120-150 MFD Make:- Bentex/Delcon.
15
-
-
... More
Starting Relay 1022/ 1622 Make::- Renutral / Epcas/Asian
15
-
-
... More
Starting Relay 2000 Make:- Renutral/Epcos/Asian
15
-
-
... More
Overload Relay Make:- Renutral/Epcos/Asian
15
-
-
... More
Thermostat switch 2059/2064/2054 Make:- Indfos/Danfoss fan blade for spilt Type A.C Cap 2/1.5 Ton
15
-
-
... More
Condenser fan blade for spilt Type A.C Cap 2/1.5 Ton
15
-
-
... More
Wiring kit for A.C split Type 1.5/2 TR
15
-
-
... More
Remote control for split AC Cap 1.5/2 TR of make as per site requirement directed by Engr-in-Charge.
15
-
-
... More
S&F in replacement main printed circuit board (PCB) with electric accessories and sensors suitable for split AC capacity 1.5/2 TR as directed by Engr-in-Charge.
12
-
-
... More
S & F in replacement suction and discharge valve set for Split AC 1.5/2 TR capacity of make as per exisiting at site as directed by Engr-in- charge.
12
-
-
... More
S&F in replacement of unsv PCBs from existing split type AC of 1.5/2TR capacity, and re-fixing with new proper functioning of the AC complete all as specified and directed.
15
-
-
... More
M&L for disconnecting from mains and taking out existing unserviceable sealed compressor unit from the split type Air Conditioner of Capacity 1.5 Ton of any modelmake/type from any location and Supply, Installing and testing (in replacement) existing company made new sealed compressors with one year warantee including cleaning and rernoving dust/dirt from the cooling coil condenser coil with necessary modification capillary tube etc including Charging of Gas R-22 and commisioning complete all as specified & directed by Engg-in-Charge.Make Kirloskar Voltas/Blue star
5
-
-
... More
Description all as per item No. 03 above but spilt type Air Conditioner of Cap. 2 Ton Make-Kirloskar/Voltas/Blue star
5
-
-
... More
Disconnecting from mains and Taking of unserviceable fan motor blower motor of split tyce AC 1.5/2 ton capacity of any make and type from any location and supply, installing and testing new motor of 1/4 HP or 1/2HP 920 RPM, 230 Volts or as per existing capacity and model complete all as specified & directed by Engr-in-Charge Make: AUE/Crompton Greaves Speed King/Cool Master Note Transportation Charges From site to trade workshop and back to original location after repair shall be deemed to be included in unit rate quoted
10
-
-
... More
Material and labour for disconnecting from mains and taking out unserviceable condenser copper coil of split Type AC of Cap 1.5 Ton/2 Ton Capacity of any make and type from any location and supply, installing and testing in repairs new condenser coil as per existing capacity and make complete all as specified and directed by Engr-in-Charge.Make Voltas/CarmenitG
8
-
-
... More
S & F in replacement evaporator/cooling coil of split type AC of capacity 1.5/2 TR of existing make and size as specified and directed.
8
-
-
... More
M&L for taking down unserviceable outdoor unit of split AC of any make type any capacity & supply & fixing new outdoor unit suitable for 1.5/2TR capacity complete all as directed by Engr-in-Charge.
3
-
-
... More
Taking down unserviceable indoor unit of split AC of any make and type and capacity & supply & fixing new indoor unit suitable for 1.5/2TR E capacity complete all as directed by Engr-in-Charga. Make- LG//Voltas/Crompton/Godrej
3
-
-
... More
Taking down unserviceable copper pipe of size 1/4" and supply & fixing new copper pipe refrigerant tubing 1/4" for suction /discharge including insulation tubing 1/4" complete including brazing, welding, with bolts and screws reqd size complete all as directed by Engr-in- Charge
35
-
-
... More
Taking down unserviceable copper pipe of size 1/2" and supply & fixing new copper pipe refrigent tubing 1/2" for suction/discharge including insulation tubing 1/2 complete including brazing, welding, with bolts and screws of reqd size complete all as directed.
35
-
-
... More
M&L for taking down unserviceable PVC drain pipe and supply & fixing new PVC drain pipe 15 mm dia for Split/window AC all as specified and directed.
50
-
-
... More
M&L for detecting the leakages of gas of split type AC of capacity 1.5/2 TR at any location and rectifying the defect to stop the leakage by gas welding or charging of refrigerant gas R-22/R-134A in window type /Split Type AC unit of capacity 1.5/2TR including testing and commissioning complete in satisfactory working condition by any other means and making it fully functional as specified and directed.
30
-
-
... More
Taking down unserviceable contactor and supply and fixing new contactor single phase suitable for Split AC 15 to 2.0 TR all as specified as directed.
10
-
-
... More
Supply and Fix Metal clad socket outlet with single pole and neutral enclosure with two pin and earth plug socket complete with one single pole MCB 20-32 Amps including taking down old/unsv Metal clad socket of approved make as directed by Engr-in-Charge.
15
-
-
... More
Supply and fix MCB single pole, 240 volts, 5 to 40 Amps 13 KA complete including taking down old unservicable MCBs of any type/capacity.
15
-
-
... More
Supply & Fixing in replacement Metal clad Plug 240 V AC, 32 Amp, 50 Hz ISI Marked Make C&S/Legrand/Havells
12
-
-
... More
S&F in replacement Metal clad Socket 240V AC 32 Amp, 50Hz ISI marked Make-C&S Legrand/Havells
12
-
-
... More
M&L for shifting of split AC 1.5/2 00 TR including dismantling all accessories, indoor outdoor unit and copper insulation, voltige stablizer and reinstalling the all accessories at new location as directed the coat of new copper pipe suction and discharge including insulation and electrical cable 3 core 4 Sqmm as per site requirement is included in the quoted rate complete all as specified and as directed at site by Engineer-in- charge.
10
-
-
... More
M&L for 3 core flexible PVC insulated cord sheathed 4.00 Sqmm including connection all as directed.
90
-
-
... More
VOLTAGE STABLIZERS
-
-
-
... More
M&L for taking down for servicing unserviceable voltage stabilizer of capacity 4 to 5 KVA from the site and transporting to contractors workshop for locating the fault including checking the servicibility of electrical electronic circuits relays and replacement of defective spare parts, reassembling after making connections, testing by applying low and high voltage input to get the 230 volts correct output and transporting back the same to site complete all as specified and directed by Engr-in-charge.
Note 1. Replacement of defective spares and rewinding of transformer of voltage stabilizer will be measured & paid separately under:-
30
-
-
... More
Supply only following defective spare parts of Voltage stabilizer of Cap 4 to 5 KVA
-
-
-
... More
Voltmeter (Analog) 0 to 330 volts any type shape single phase 50 Hz AC supply
15
-
-
... More
Digital type Voltmeter 0 to 300 volts any type shape single phase 50 Hz AC supply
15
-
-
... More
Printed input circuit control card suitable for 4 to 5 KVA
15
-
-
... More
Input/cutput switch Maka AE/Rishabh/Mico
15
-
-
... More
Push on switch Make AE/Rishabh Mico
15
-
-
... More
Indicator complete with bulbs Make Renutrol/Technomac
15
-
-
... More
Trigger Transformer for 4 to 5 KVA
15
-
-
... More
Relay for 4 to 5 KVA voltage stabilizer Make Renutral/Technomac
15
-
-
... More
Time delay switch 230Volt AC 6 Amp 50 Hz range 1 sec to 10 min (adjustable)
15
-
-
... More
Material and labour for taking out the burnt winding of transformer of voltage stablizer and prepairing core after cleaning by suitable cleaning agent and rewinding the transofrmer of voltage stablizer with super enameld copper wire of existing gauge including varnishing, heating and refiting of capacity 4 KVA voltage stablizer, complete all as specifies & directed by Engr-in-Charge.
10
-
-
... More
Desctription all as per item No 23 above but 5 KVA
8
-
-
... More
WATER COOLERS, DEEP FREEZERS & REFRIGERATORS
-
-
-
... More
Dismantling and removing defective compressor and replacing the same with new sealed compressor of approved make cotained from authorised dealers for 190 Ltrs capacity rafrigerators all as specified and directed,
2
-
-
... More
Dismantling and removing defective compressor and replacing the same with new sealed compressor of approved make cotained from authorised dealers for 300/310 Ltrs capacity rafrigerators all as specified and directed,
2
-
-
... More
Dismantling and removing defective compressor and replacing the same with new sealed compressor of approved make cotained from authorised dealers for 40/80 Ltrs capacity rafrigerators all as specified and directed,
2
-
-
... More
Dismantling and removing defective compressor and replacing the same with new sealed compressor of approved make cotained from authorised dealers for 60/120 Ltrs capacity rafrigerators all as specified and directed,
2
-
-
... More
Dismantling and removing defective compressor and replacing the same with new sealed compressor of approved make cotained from authorised dealers for 150 Ltrs capacity rafrigerators all as specified and directed,
2
-
-
... More
Note FOR ITEM No. 25 to 29 here as above-
(1) Warranty certificate from manufacturer/authorised dealers shall be submitted alongwith compressor unit. ( Supply and charging of gas will be measured and paid separately under relevant item
-
-
-
... More
Supply and charging refrigerant gas non CFC based compatible to F-22/134 in refngerators of capacity 180/300/310 Ltrs capacity including cutting and brazing of copper tubes complete all as specified and directed.
5
-
-
... More
Supply and charging refrigerant gas non CFC based compatible to F-22/134 in water coolers of capacity 40/80 Ltrs capacity including cutting and brazing of copper tubes complete all as specified and directed.
5
-
-
... More
Supply and charging refrigerant gas non CFC bared compatible to F-22/134 in water coolers of capacity from 60/120 Ltrs to 150 Ltrs capacity including cutting and brazing of copper tubes complete all as specified and directed.
3
-
-
... More
S&F in replacement capilary tube of existing size including necessary brazing suitable for 180 to 315 Ltrs capacity refrigerator
2
-
-
... More
S&F in replacement over load protector relay suitable for 180/300/310 Ltrs capacity refigerator all as directed
2
-
-
... More
S&F in replacement thermostat suitable for 180/100/310 Ltrs cap water refrigerators all as directed.
2
-
-
... More
S&F in replacement over load protector relay suitable for 40/80 Ltrs capacity water cooler all as directed.
2
-
-
... More
S&F in replacement of thermostat suitable for 40/80/120/150 Ltr capacity water coolers all as directed.
2
-
-
... More
S&F in replacement of condensor motor fan blade suitable for 40/80/120/150 Ltr capacity water coolers all as directed.
2
-
-
... More
S&F in replacement of new condensor motor 1/2 HP with fan blades complete suitable for 40/80/120/150 Ltr capacity water coolers complete all as specified and directed.
2
-
-
... More
Supply and fix in replacement PVC drain pipe 25mm dia with suitable standard clip complete to fix with water cooler of any capacity including dismantling the old unserviceable one all as directed.
20
-
-
... More
Supply and fix in replacement PVC connecting pipe 20mrt dia and 1.5 Mtr length for inlet to water cooler with both side threaded socket type complete all as specified and directed.
20
-
-
... More
S&F in replacement drain water tray complete suitable for 40/80/120/150 Ltr capacity water coolers all as directed.
5
-
-
... More
Supply and fix in replacement chromium plated bib cock push type outer/inner threaded suitable for 40/80/120/150 Ltr capacity water coolers all as directed.
10
-
-
... More
Supply and fix in repairs PVC float valve of size 15mm dia complete suitable for socket of same size all as directed.
10
-
-
... More
S&F in replacement of freezer door with spring of refrigerators of any capacity & make all as specified and directed.
10
-
-
... More
S&F in replacement vegetable basket with glass suitable for 183/300/310 Ltrs capacity refrigerators
5
-
-
... More
S&F in replacement PVC defrost tray as per sample suitable fan 180/300/310 Ltrs capacity refrigerators.
5
-
-
... More
S&F in replacement door gasket for refrigerators of capacity upto 180 to 310 Ltrs completa all as specified and directed.
5
-
-
... More
Dismantling of existing repairable deep freezers of any make and size from its position after disconnecting electric connections, transporting from site to contractor's workshop for carrying out repairs and renewal/replacement of parts, reassembling and transporting back to the site including installation of the same on the same location and making electric connection etc, all as specified and directed by Engineer-in Charge. Note Parts renewed shall be measured and paid separately under appropriate iterns.
2
-
-
... More
Supply only starting relay upto 300/320 ltrs capacity deep freezer all as specified and directed
1
-
-
... More
Supply only overload protector suitable for upto 300 Ltrs capacity deep freezer all as specified and directed
1
-
-
... More
Supply only running capacitor for upto 300/320 Ltrs capac ty deep freezer all as specified
1
-
-
... More
Supply only thermostat suitable for upto 300/320 Ltrs capacity deep freezer all as specified and directed
1
-
-
... More
Supply only starting capacitor for upto 300/320 Ltrs capacityy deep freezer all as specified and directed.
1
-
-
... More
Taking down defective compressor of capacity 300/320 deep freezer of any make and supplying and fixing now sealed unit compressor a specified here under including brazing and with necessary nuts and bolts, copper filter, capilary and supply & charging of refrigerant gas or equivalent to Non CFC gas in required qty and testing complete all as specified and directed by Engineer-in-Charge
1
-
-
... More
DESERT COOLER
-
-
-
... More
M&L for taking down desert cooler of any type/size/mode from any height / floor for servicing like changing of wood wool pads, kit motor submersible pump, fan blade, front grill, wiring, capacitor, cleaning or any other repair work is specified and re-fixing to existing place after repair work/overhauling complete all as specified and directed.
Note (1) The rates quoted by the contractor shall deemed to include the cost of T&P. The items required to be replaced shall be measured and paid separately under relevant items.
40
-
-
... More
Supply only wood wool pad of suitable size for 24 sweep desert cooler complete all as specified and directed 01 Set comprising of 3 Nos of pad As per sample
30
-
-
... More
All as per item No 57 above but 20 sweep approximate weight 700-800 grams As per sample
10
-
-
... More
S&F in replacement of submersible pump (tullu pump) motor 230 Volts, single phase, AC Make-Little/ Cromptor/Khaitan
40
-
-
... More
S&F in replacement of New fan motor with cooper winding including suitable fan blade of existing capacity and size for desert coolers complete all as specified and as directed
30
-
-
... More
S&F in replacement of PVC front grill for desert cocier of approved make complete with 5 Amp switch, three speed regulator including indicating samp all as specified and directed (As per Samole)
15
-
-
... More
Supply & fixing wire mesh for desert cooler pad (Set of Thee) complete all as specified and as directed.
20
-
-
... More
Supply & fixing PVC pipes for connecting pump and water distributor of size 15 mm dia as per sample complete all as specified and as directed.
10
-
-
... More
Supply & fixing PVC elbow for desert cooler. As per sample
10
-
-
... More
Supply & fixing PVC 4 Way distribution cross for desert cooler. As per sample
10
-
-
... More
S&F in repairs & replacement flexible copper conductor cable PVC insulated & PVC sheathed of size 14/76 complete al as specified and directed (Make-Flaza/Kalinga)
90
-
-
... More
S&F in replacement desert coolers fan blade of 18" (inch) sweep make out of Plastic/Aluminum complete all as specified
40
-
-
... More
S&F in replacement desert coolers fan blade of 20" (inch) sweep make out of Plastic/Aluminun complete all as specified.
20
-
-
... More
Supply and fixing in repairs side panel of desert cooler of 20" (inch) sweep made out of 20 SWG, GI sheet suitable for fixing with the existing desert coolers, duly painted with synthetic enameled paint over a coat of red oxide primer complete all as specified and directed.
10
-
-
... More
S&F in replacement switch piano flush type single pole one way 5Amp 230 V for desert cooler all as directed (Make-Anchor/Kingal/Havells)
25
-
-
... More
S&F replacement 3 pin plug top 5 Amp, 230V for desert cooler complete all as specified and directed (Make-Anchor/Kinjal/Havells)
25
-
-
... More
S&F in replacement desert cooler body of size 26 inch x 26 inch x 32 inch (height) with side panels (03 Nos) fabricated out of 20 SWG PGI Sheet alongwith PVC front grill, distribution switch 5 Amp piano switch and depth of water tank not less than 7" (inch) complete all as per sample.
5
-
-
... More
M&L for evacuation of Gas from the system feeding the dry nitrogen by separating the low and high side of the system and leak testing the same arresting the leaks including S&F in replacement of Teflon sealing of all refrigerant line valves of compressors, gland packages of all angle valves flaring of all connections framing welding angle valves flaring of all connections framing welding etc complete including gas charging of Central Type AC plant of capacity 3X 35 TR complete all as specified and as directed.
3
-
-
... More
Supply and charging refrigerant R-22 Gas of approved make in new sealed cylinder complete all as specified and as directed.
220
-
-
... More
Repair/maintenance/servicing complete unit of AHU’s of AC plant 3X35TR Capacity system and cleaning of metallic filters and cooling coils, with cleaning agent followed with pressurized water jet at AFSSR including repair to nozzle and spraying pipe , clamps and tie rod replacement , cleaning at FRB shuts and fixing HW FRP cover to air motor complete all as specified and as direcetd.
1
-
-
... More
Dismantling the existing water cooled condenser of Cap 3x35TR of shell and tube type from its pipe line and gas connection repairing the same by replacing the defective copper tubes by new one with existing size and dia, Cleaning the shell complete assembly the new and serviceable tubes charging testing for 350 PSI pressure all as specified by Engineer-in-Charge
Note :- Rate mentioned included copper tubes.
3
-
-
... More
S&F in replacement of thermostatic expansion valve suitable for existing AC Plant 3X35 TR including cutting, welding, brazing, replacement nut, bolt, washer of existing make etc all as specified & directed by Engineer-in-Charge, Note for Item :- Before disconnecting the existing expansion valve from the system the refrigerant has to be pump down or taken in empty cylinder by help of ICE etc.
2
-
-
... More
S&F in replacement of temperature gauges of the chiller and condenser lines operates by mercury liquid of range 0-50⁰C Make:Fiebig.
8
-
-
... More
S&F in replacement of pressure gauges of the chiller and condenser lines of range 0 - 250 Psi. Make:Fiebig.
12
-
-
... More
M&L for replacement of worn bearing No. 6308 for compresser motor 40 HP including replacement of coupling plate, bush nuts bolts complete accessories for smooth functioning and testing complete all as specified and as direcetd.
3
-
-
... More
M&L for repair to control panel with replacement of contractor , relay timer switch starting switch complete wiring of panel and connection, Replacement of imported controls pressure, switches gauges, modulating valves, modulating motors, microprocessor and BMS components of compressor unit 1 to 3 at 3x35R NTS complete all as specified and as direcetd.
3
-
-
... More
Supply and fix in replacement butterfly valves suitable for GI pipe complete including dismantling the old and nuts , bolts and socket size 100mm as per site reqd and all as directed by Engineer-in-Charge
4
-
-
... More
M&L for rewinding of Induction Electric Motor upto 7/10/15HP Capacity of any Make and size complete with super enameled copper wire of existing gauge including Varnishing and replacement of insulated material and replacement of ball Bearing complete all as specified and as directed.
2
-
-
... More
M&L for rewinding of compressor Electric Motor upto 50 HP Capacity of any Make and size complete with super enameled copper wire of existing gauge including Varnishing and replacement of insulated material and replacement of ball Bearing complete all as specified and as directed.
2
-
-
... More
M/L for repairing the cooling tower of AC Plant 3x35 TR at NTS by Strip opening of the parts such as CT fan motor, fan, fan blades, PVC fins, sprinkler, tie rod ,eliminator, electric connection complete and removing silt deposited inner part of the cooling tower by wire brush, PVC branch pipe and applying solvent as applicable and refixing the same after repairs/modification etc all as specified and as directed at site by Engineer in charge.
1
-
-
... More
Supply and fix in replacement of ON Load changeover switch confirming to IEC 947-3, EN-60947-3, AC-23A, Front operated, 4 pole 415 volts, 50 Hz 400 Amps, in sheet metal encloser complete all as specified and as directed.
1
-
-
... More
Disconnecting/removing the old unserviceable burnt parts from the FASD starters and supply and fix the new items as per exiting the model for AC 415 V,50 HZ 3 phase suitable for the motors all as directed
4
-
-
... More
S&F in replacement of Power Contactor MNX-8 with Aux contacts 1 NO +1 NC of range AC1-32 A & AC3-18 A of Make-L&T complete all as specified and as directed.
4
-
-
... More
S&F in replacement of Power Contactor MNX-25 with Aux contacts 1 NO +1 NC of range AC1-45 A & AC3-25 A of Make - L&T complete all as specified and as directed.
4
-
-
... More
S&F in replacement of Power Contactor MNX-40 with Aux contacts 1 NO +1 NC of range AC1-55 A & AC3-40 A of Make L&T complete all as specified and as directed.
3
-
-
... More
S&F in replacement of Timer Electronic type 240/415 volts -L&T complete all as specified and as directed.
3
-
-
... More
S&F single phase preventer suitable for 3/5 HP pump sets complete all as specified and as directed.
3
-
-
... More
Supply and fix in replacement MCCB 125 A 4 pole, 35/36 KA with adjustable thermal & fixed magnetic setting with bus bar spreader links for connecting both incoming and outgoing cables with suitable connections with suitable size of glands etc complete including testing & commissioning all as specified and as directed
4
-
-
... More
Comprehensive maint of HVAC including VRV, PAC, water chiller
-
-
-
... More
Comprehensive, preventive and periodically maintenance of the HVAC VRV Unit Make- Hitachi, Model : RAS-10HNBCMQ1- Qty-2 No's and RAS 14GNBCMQ1 Qty-01 No's total 34 HP along with respectively Indoor units Qty -11 No's of different rating (4.5 HP ductable unit-02 no's, split- 02 HP-Qty-02, Cassette uni 3HP -7No's. By inspecting the all units and carry out monthly as a part of preventive maintenance, with relevant PM checklist. Checking the refrigeration system, motor arıd starters and ensuring healthy condition of the plant. Checking the system for any leaks and rectification of leaks found Taking set of readings and evaluating to ensure satisfactory performance of the plant, Checking the Refrigeration control system for operation and adjusting the settings, Checking the functioning of compressors and its accessories, Cleaning the IDU evaporator, ODU condenser coil monthly, Lubricating the bearings of motors, & fans when found necessary, monthly inspection of belts adjusting the tension and replacing the worm out belt as and when found required, Replenishment of refrigeration gas as a result of wear and tear or any other means, Overhauling the components of the equipment at site or in service station as and when required. Checking of the microprocessors PCBs and sensors of IDU/ODU units for its proper functioning and repair/ replacement of the same if found necessary to make the overall system serviceable.
11
-
-
... More
Attending to complain breakdown calls whenever required. Carrying out external cleaning (chemical or with water) of condensor coils of outdoor unit. Reporting the healthiness of the plant and make improvements if any, all as directed and specified by Engr-in-charge. Replacement of all unserviceable items are included in this item and replacement of unserviceable item with OEM items only. Cost of items/materials are included in this item and no other extra payment to be done. Refrigerant 410 as and when required is also included in this item.
-
-
-
... More
Comprehensive, preventive and periodically maintenance of the Chiller Plant Make- Blue box/ Swegon, Model : ZP182KCE-1FD-477-Qty-3 No's and total Capacity 22X3-66 TR along Primary pumps-5HP/2.5KW, Qty -3 No's including 4 No's AHU, including chiller LT panel & RO Plant , By inspecting the all units and carry out monthly as a part of preventive maintenance, with relevant FM checklist. Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. Checking the system for any leaks and rectification of leak found. Taking set of readings and evaluating to ensure satisfactory performance of the plant. Checking the Refrigeration control system for operation and adjusting the settings. Checking the functioning of compressors and its accessories, Cleaning the IDU evaporator ODU condenser coils monthly. Lubricating the bearings of motors & fans when found necessary, monthly inspection of belts adjusting the tension and replacing the worn out belt as and when found required. Replenishment of refrigeration gas as a result of wear and tear or any other means, overhauling the components of the equipment at site or in service station as and when required. Checking of the microprocessors PCBs and sensors of IDU/ODJ units for its proper functioning and repair/replacement of the same if found necessary to make the overall system serviceable.
11
-
-
... More
Attending to complaint breakdown calls whenever required. Carrying out external cleaning (chemical or with water) of condenser coils of outdoor unit. Reporting the healthiness of the plant and make improvements if any, all as directed and specified by Engr-in-charge. Replacement of all unserviceable items are included in this item and replacement of unserviceable item with OEM items only. Cost of items/materials are included in this item and no other extra payment to be done. Refrigerant 410 as when required is also included in this item.
-
-
-
... More
Comprehensive, preventive and periodically maintenance of the Precision air condition (PAC) Unit: Make Blue box/ Swegon, Model :DATATEC VEDA10-1CH-Qty-3 No's and total Capacity 5X3-15 TR including PAC LT Panel by Inspecting the plan system and carry out preventive maintenance as par the standard practice monthly in contract period with relevant PVM checklist. Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. Checking the system for any leaks and rectification of leak. Ensure drain is not clogged. Taking set of readings and evaluating to ensure satisfactory performance of the plant, Checking the Refrigeration control system for operation and adjusting the settings, Checking the functioning of compressors and its accessories, Cleaning up of units & all air filters, check the proper functioning of controllers, Lubricating the bearings of motors, & fans when found necessary. Replenishment of refrigeration gas as a result of wear and tear. Attend all breakdown within 2-4 hours. Replaced worn out parts within 24 hours subject to normal working days, Overhauling the components of the equipment at site or in service station as and when required to make the overall system serviceable. Checking of the microprocessors PCBs and sensors of IDU/ODJ units for its proper functioning and repair replacement of the same if found necessary.
11
-
-
... More
Attending to complain breakdown calls whenever required, Reporting the healthiness of the plant and make improvements if any, all as directed and specified by Engr-in-charge. All unserviceable items are included in this item and replacement of unserviceable item with OEM items only and cost of items/materials are included in this item and no other extra payment to be done. Any Refrigerant as and when required is also included in this item.
-
-
-
... More
Comprehensive, preventive and periodically maintenance of the Fire Pumps: Capacity 450 LPM at 3.5 Kg/Cm2 delivery pressure for fire hydrant. Motor rating- 5KW/ 7.5 HP Qty-01 No's.Attending to complain breakdown calls whenever required, Reporting the healthiness of the plant and make improvements if any, all as directed and specified by Engr-in-charge. All unserviceable items are included in this item and replacement of unserviceable item with OEM items only. Cost of items/materials are included in this item and no other extra payment to be done. Any Rewinding if required is also included in this item and there will be no other extra payment made to the contractor.
11
-
-
... More
Comprehensive, preventive and periodically maintenance of the HVAC Panel: Main I/C -2 Nos. 100 A FP MCCB 16 kA, Buscoupler-1 No 100 A TPN MCCB, outgoing 5 Nos. 40 A FP MCCB, and other, EM, relay and PLC for auto control.All unserviceable items are included in this item and replacement of unserviceable item with OEM items only. Cost of all items/materials are included in this item and no other extra payment to be done.
11
-
-
... More
Comprehensive, preventive and periodically maintenance of the Fire Fighting panel: Main I/C-1 No 63 A Manual changeover, 1 Nos. 63 A FP MCCB, Busbar connection on the other side, and Outgoing -2 Nos. 32 A TP MCCB with DOL Starter. All unserviceable items are included in this item and replacement of unserviceable item with OEM items only. Cost of all items/materials are included in this item and no other extra payment to be done.
11
-
-
... More
Note for item 95.00 to 100.00:- (i) The tenderer shall have to replace the U/s material with OEM material only. The cost of replaced all spare parts will be included in quoted rate including refrigerant. Old material will be contractor property and credit included in the rate quoted. (ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same.
(iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000/ per hour to be imposed and amount of penality will be deducted from RAR. (iv) The cost of transportation (to and fro) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically ,so contractor to specify the telephone no who will receive the complaint round the clock. After attending the complaint contractor will obtain the signature from rep of User/AGE/GE every day as a token of complaint attended.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%