Military Engineer Services Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Mar 2024
Closing Date9 Apr 2024
Tender Amount₹ 49,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All as per Item No 3 hereinbefore but capacity 2 ton capacity.

1

-

-

... More
M&L for rewinding of the blower motor 1/6,1/5,&1/8 HP of AC any type /capacity with same gauge super enamelled copper wire complete including taking out old unserviceable winding kit complete all as specified and as directed.

10

-

-

... More
M&L for rewinding of the outdoor fan any type /capacity ((upto 1/13 HP, 800 rpm, 57 watt) thermally protected with same gauge super enamelled copper wire complete including taking out old unserviceable winding kit complete all as specified and as directed.

10

-

-

... More
Supply and fixing in replacement of outdoor fan Blade for AC upto 2 ton as per site, complete as directed. Note: Sample shall be checked at site before procurement to match the existing models.

10

-

-

... More
Supply and fixing in replacement of starting relay of existing makes and capacity duly ISI marked for AC W/T and split type 1.5/2 Ton capacity as per site requirement, complete all as specified and as directed.

30

-

-

... More
Supply and fixing in replacement of starting capacitor of existing make and capacity (40/60 & 80/100mfd) duly ISI marked for window type A/C 1.5 ton and split type AC 2 ton complete all as specified and as directed.

30

-

-

... More
Supply and fixing in replacement of three state running capacitor of existing make and capacity (50/6, 45/5 & 36/6mfd) duly ISI marked for window type A/C 1.5 ton and split type AC 2 ton complete all as specified and as directed.

30

-

-

... More
Supply and fixing in replacement of refrigerant tubing for suction /discharge of (5/8, 1/4, & 1/2 ) including insulation tubing complete all as specified and as directed.

70

-

-

... More
Supply and fixing in replacement of of capacitor 10 Mfd blower motor ISI marked complete all as specified and as directed.

18

-

-

... More
S&F in replacement of PCB card, board type/box type (2 PCB cards fabricated in one box) suitable for existing split type AC 1.5/2 Tone AC of any make/model complete all as specified and as directed.

18

-

-

... More
Supply and fixing in replacement of allen key type hand shut valve suction for split AC 1.5/2 Ton complete all as specified and as directed.

10

-

-

... More
All as per item No 14 hereinbefore but allen key type hand shut valve discharge for split Ac 1.5/2.0 ton complete all as specified and as directed.

10

-

-

... More
S&F in replacement of cooling coil of indoor split type AC 1.5/2.0 Ton capacity as per existing make and model complete all as specified and as directed.

8

-

-

... More
Supply and fixing in replacement of Split AC Remote (for any make AC) as per model on site complete all as specified and as directed. Note: Sample shall be checked at site before procurement to match the existing models.

10

-

-

... More
M&L and T&P (any type) for shifting of Split AC of any capacity both indoor, outdoor & its connected accessories (like drain out pipe, copper tubing, frame etc.) by properly demounting from one location and re-fixing it in other location as per user requirement including cutting hole and removing old copper pipes and using same for the new location and testing/commisioning after making proper connections by deploying sufficient labour and tool, complete all as specified and as directed. Note:- (i) Any type of civil work involve in shifting is deemed to included in quoted rate. (ii) Shifting can be on same floor or to higher floors or any other location, no extra payment will be made for labour and transportation. (iii) Cost of refrigerant gas charging of unit (full or top up) is deemed to be included in quoted rate. (iv) Any extra item required at site due to difference in location will be measured in relevant item.

12

-

-

... More
Taking down old u/s indoor unit along with connected accessories and Supply, intallation, testing and commissionging of new indoor unit of split type AC of capacity 1.5Ton including all connections complete all as specified and as directed. Note: Base frame of indoor unit, remote as per new unit PCB card, gas refilling if leaked during installation, intallation charges and other connected work is deemed to be inclucive of rates.

1

-

-

... More
All as per Item No: 19 hereinbefore but capacity 2 ton capacity.

1

-

-

... More
Supply and fixing in replacement of Industrial socket sheet metal enclosure with socket plug top and MCB single pole and neutral with a two pin and earth plug and socket with one single pole MCB of 20 Amp complete all as specified and as directed.

58

-

-

... More
M&L for servicing/detection/rectification of leakage of gas in the system and gas charging in the system with appropriate quantity of gas including testing for smooth functioning of water cooler of capacity 80/40 ltr, 120/40 Ltr, & 150/150 Ltrs complete all as specified and as directed. Note:- (i) Unserviceable condensing coil if required shall be measured and paid separately. (ii) Refilling and toping up of refrigerant (type and quantity) as required on site is deemed to be included in quoted rate.

10

-

-

... More
Supply and fixing in replacement of compressor reciprocating type (hermetically) sealed suitable for capacity 80/40, 120/40, 150/150 litre water cooler complete all as specified and as directed. Make: Emerson/Hitachi/LG.

2

-

-

... More
Supply and fixing in replacement of thermostat switch suitable for existing water cooler any make and capacity complete all as specified and as directed. Make: Renutrol/Indofos/Annapurna/Totaline

6

-

-

... More
Supply and fixing starting relay and overload relay suitable for existing size and make water cooler complete all as specified and as directed.Make: Epcos/Asian

5

-

-

... More
Supply and fixing in replacement of starting capacitor for water cooler suitable for existing size & make water cooler complete all as specified and as directed.

5

-

-

... More
Supply and fixing running capacitor suitable for existing size & make water cooler complete all as specified and as directed.

5

-

-

... More
Supply and fixing drier/filter of suitable capacity, complete all as specified and as directed.

4

-

-

... More
Dismantling of old defective condenser fan motor of water cooler of any make and capacity and refixing and testing the same after rewinding with super enameled copper wire of existing gauge or gauge as approved by Engineer-in-Charge including replacement of shaft/ bush etccomplete all as specified and as directed.

2

-

-

... More
S&F in replacement of of fan blade of condenser motor of any make and capacity of water cooler complete all as specified and as directed.

3

-

-

... More
M&L for servicing of deep freezer any capacity and size including cleaning greasing including detecting the cause of leakage by nitrogen flash method in any type/capacity and ensuring the complete system leak proof and charging full or top up with refrigerant gas with appropriate quantity as per site including testing for smooth functioning complete all as specified and as directed.Note : (i) Refilling and toping up of refrigenrant (any type and any quantity) as required on site is deemed to be included in quoted rate. (ii) Fixing of Anti freeze, drier/filter, brass nut, bolts, thimble, wiring, valves etc are deemed to be included in quoted rate.

1

-

-

... More
Supply and fix in replacement of starting relay of deep freezer of any size & make complete all as specified and as directed.

1

-

-

... More
Supply and fix in replacement/ thermostat switch for deep freezer any make & capacity complete all as specified and as directed.

1

-

-

... More
M&L for Repair and maintenance of refrigerator of any capacity capacity including replacement of following unserviceable parts starting relay - 01 No., over load relay-01 No, capacitor 20 mfd -01No, Door opening handle - 01 Set, freezer chamber - 01 No, Door panel complete - 01 set, thermostate switch - 01 No, vegetable tray-01 No, Door rubber beeding set - 01 Set, ice tray - 02 Nos. Testing and commissioning of refrigerator after repair in its original locating all as specified and as directed.

6

-

-

... More
Supply and labour for charging of Refrigerant gas R-22 in cooling appliances of any type and capacity, complete all as specified and as directed. Note: Labour cost for charging is deemed to be included in quoted rate. Since R-22 is flammable & exposive gas, contractor has to make sure for the safety and take adequate safety measure for technicians/ labour during charging gas. Deptt will not be responsible for any accident nor liable to pay any compensation to victim or contractor.

35

-

-

... More
Supply and labour for charging of Refrigerant gas R- 410a in cooling appliances of any type and capacity, complete all as specified and directed. Note: Labour cost for charging is deemed to be included in quoted rate. Since R-410a is high pressure & exposive gas, contractor has to make sure for the safety and take adequate safety measure and suitable tools for technicians/ labour during/for charging gas. Deptt will not be responsible for any accident nor liable to pay any compensation to victim or contractor.

15

-

-

... More
All as per item No 36 hereinbefore but Refrigerant gas R- 32 in inverter type Split AC and any capacity complete all as directed.

10

-

-

... More
Supply and labour for charging of Refrigerant gas R- 134 a in cooling appliances of any type and capacity,refrigerater,water cooler & deep frizer complete all as specified and as directed. Note: Labour cost for charging is deemed to be included in quoted rate. Since R-134 a is high pressure & exposive gas, contractor has to make sure for the safety and take adequate safety measure and suitable tools for technicians/ labour during/for charging gas. Deptt will not be responsible for any accident nor liable to pay any compensation to victim or contractor.

10

-

-

... More
M&L for visiting of Technician on site and checking, inspecting & detecting fault in AC's, Deep Freezers, Water coolers & refrigerators of any capacity, type, any make & model by technicians and rectifying minor defects on site and noting down material required to make cooling appliance functional in next visit complete all as specified and as directed. Note: (i) Spare required will be measured saperately. (ii) Servicing visit will not be measured under this item.

99

-

-

... More
M&L for servicing of room desert cooler of any make size by cleaning, oiling & greasing, checking of defects and rectifying unserviceable switches, control switch etc adjusting and setting for work including complete electric wiring with 3 core flexible cable plug top and testing complete all as specified and as directed.

210

-

-

... More
M&L for rewinding of fan motor of desert cooler with super enamelled copper wire of existing gauge or gauge as approved by Engineer-in-Charge complete all as specified and as directed. Note: replacement of bush bearing is deemed to be included in quoted rate.

40

-

-

... More
M&L for replacement of tullu pump submersible type for desert cooler having, 2mtrs head, 500l/h discharge rate, 25 watts, single phase, complete all as specified and as directed.

140

-

-

... More
Supply and fix in replacement of New fan motor of 100watts, copper winding, Class E insulation, 1500 rpm, steel shaft, including capacitor of 4 mfd for desert coolers complete all as specified and as directed.

100

-

-

... More
Supply and fixing in replacement of capacitor 4 Mfd blower motor & desert cooler motor ISI marked complete all as specified and as directed.

100

-

-

... More
M&L for plastic distributor 3 way of superior quality as per site requirement complete all as specified and as directed.

80

-

-

... More
M&L for PVC pipe 15 mm dia for desert cooler for inside connection of superior quality complete all as specified and as directed.

100

-

-

... More
S&F desert cooler grasspad suitable for cooler of capacity 4000 cum/hrs & dimension of pad not less than complete all as sepcified and as directed.

210

-

-

... More
M&L for painting of cabinet body of room cooler with one coat of red oxide paint and two coats for desert cooler water tank with black enameled paint and outer body with smoke grey paint after preparation of surface complete all as specified and as directed.

210

-

-

... More
S & F in replacement of Flat solar plate collector panels suitable for 100LPD solar water heater, free stand type, with copper tubings of suitable size enclosed in toughed glass from top and metal sheet base with back ground painted with black colour and PUF insulated of size as per site requirment, complete all as specified and as directed. NOTE: (1) Panel should be BIS and CEC approved. (2) All accessories required at site for installation is deemed to be included in quoted rate. (3) Contractor must check size of panel as per existing before procurement.

1

-

-

... More
M&L for Comprehensive Annual Maintenance Contract of central Air conditioning Plant of Capacity 3 x 55 TR including Sundays & Holidays for respective equipments as listed below:- (a) Periodical, preventive and comprehensive maintenance complete package chiller units each consisting of 3 x 55TR chiller units along with motor and its condenser,microprocessor based control panel complete system including submission of preventive periodical service reports. Total no of package chiller units -03 Nos. (b) Preventive, Comprehensive and routine maintenance of following equipments:- (i) Primary Chiller pump sets along with motors -03 Nos. (ii) Secondary Chiller pump sets along with motors -03 Nos. (iii) Chiller water pipe lines and its control valves – lot. (iv) Electrical operated hot water generator complete with automatic and safety controls such as safety valve, purge valve, high limit cut out, automatic and manual reset, low level cut out stop controller, thermostat, heaters including its control panel-03 No. (v) Hot water pump set along with motor and control valves controls provided at each pump set-02 Nos. (vi) Hot water piping, insulation, fittings control valves connected between hot water unit to pump set and pump set to various AHUs-Lot.

9

-

-

... More
(vii) AHUs complete with accessories such as casing, chilled water coil, hot water coil, any type of air filters, drive motors control panel etc complete 3 Nos AHUs. (viii) Controls for AHUs comprising of three way mixing valves with modulating motor, thermostat and humidistat-Lot. (ix) Cubical type floor mounted main LT panel consisting control switch gear, starters of pump sets, cooling towers and its single phase preventers, no volt and under volt protection system, meters indication lamps complete-01 No. (x) Sub control panel provided for AHUs including controls starter meters and protection system -03 Nos. (xi) Central control console panel comprising of ON/OFF push buttons and ON/OFF indication lights -01 No. (xii) Condensor Pump - 03 Nos (xiii) Hot water generator - 01 No (xii) Chiller /condenser control units/ display unit, Contactors, MCCB/MCB, filters, stainers, drier filters, valve, thermometers, NRV, wiring or other any defect related to units. (xiii) Repair to AHU's induction motors, belts, fan, relays, actuators, motoried valve or any other type defects including abnomal sounds from AHU's. (xiv) Cleaning/washing of chiller/condenser unit, AHU Pre filters with pressuriezed water and detergent etc. periodically to remove dust and scale formation due to natual calamities.

-

-

-

... More
(xv) Repair to pin hole in scroll compressor and topping up with compressor oil and refigerant gas is deemed to be included rate. Rates are deemed to be inclusive of Gas charging as per OEM specification, compressor oil, cutting of copper tube or any other items like thermometer, heating belt, any fittings, rubber cushions, pressure gauge, Manpower and T&P required at site.

-

-

-

... More
M&L for Comprehensive and Running maintenance of central Air conditioning Plant of Capacity 3 x 25 TR including Sundays & Holidays for respective equipments as listed below:- (a) Periodical, preventive and comprehensive maintenance complete package chiller units each consisting of 3 x 25TR water cooled screw chiller units along with motor and its condenser,microprocessor based control panel complete system including submission of preventive periodical service reports. Total no of package chiller units -03 Nos. (b) Preventive, Comprehensive and routine maintenance of following equipments:- (i) Chiller pump sets along with motors -03 Nos. (ii) Condenser water pump sets along with motors -03 Nos. (iii) FRP cooling towers complete with motor, fan, gear box (iv) Condenser water pipe lines and its control vales complete-Lot. (v) Chiller water pipe lines and its control valves – lot. (vi) AHUs complete with accessories such as casing, chilled water coil, drive motors control panel etc complete 3 Nos AHUs. (vii) Controls for AHUs comprising of three way mixing valves with modulating motor, thermostat and humidistat-3 Nos.

9

-

-

... More
(viii) Cubical type floor mounted main LT panel consisting control switch gear, starters of pump sets, cooling towers and its single phase preventers, no volt and under volt protection system, meters indication lamps complete-01 No. (ix) Sub control panel provided for AHUs including controls starter meters and protection system -03 Nos. (x) Central control console panel comprising of ON/OFF push buttons and ON/OFF indication lights -01 No. (xi) Chiller /condenser control units/ display unit, Contactors, MCCB/MCB, filters, stainers, drier filters, valve, thermometers, NRV, wiring or other any defect related to units. (xii) Repair to AHU's induction motors, belts, fan, relays, actuators, motoried valve or any other type defects including abnomal sounds from AHU's - 04 Nos (xiii) Cleaning/washing of chiller/condenser unit, AHU Pre filters with pressuriezed water and detergent etc. periodically to remove dust and scale formation due to natual calamities water chiller pump.

-

-

-

... More
NOTE For Item No 50 & 51- (1): The Annual Maintenence contract shall cover following scope of work. a) Compressor oil, lubricant grease, replacement of defective bearings of pumps and motors, solenoid valves, v-belts, contactors, relays, cable lugs, electrical measuring meters, selector switches, fuses, rewinding of motors, repairs to pumps,chilled water piping system, cooling towers, panels/ starters/ refregerant controls /lubricant oil/refregerant as and when required and all as directed by lthe Engineer-in-Charge. b) Checking the functioning of Chiller unit/Air Handling unit/Pumps/Controls and all such equipment covered under the contract. c) Free replacing of defective/worn out parts with new or repaired parts for compressor/thermostat/ cut outs based on requirement is also including in quoted rate. d) Repairing of equipment at site/service station as per requirement. e) Descaling of condensers/chemical cleaning of evaporator coils based on Rep of OEM assessment and working parameters of the plant. f) Refill refrigerant gas and compressor oil in the system excluding sealed compressor is also including in quoted rate. as and when required. g) Checking of compressor for its proper working. i) Annual pumping-down and restarting as and when required.

-

-

-

... More
j) Checking of Microprocessor control panel, control boards, transducers of packaged chillers/condensing unit for their correctness and replace if necessary. k) Replacing of parts due to wear and tear. (2): (a) All the spares and major items are included in the comprehensive maintenance cost . (b) Contractor shall inspect the servicebility of all Machinery during taking over and make serviceable if required (All costs are included in quoted rates) submit the servicebility/defect rectification report in writing within reasonable time frame. After getting the servicebility of all plant and equipment only Annual maintenance will start commencement. After commencement of AMC incase of failure of operation of plant Penality clause as per CA will be applied. (i) The tender shall have to replace the U/S material with OEM materials only. The Cost of replacement major/minor spare parts not to paid separately, old materials will be contractor property & included in the rate quoted (ii) In Case any accident occur of any indl like mechanic/helper/user during maintenance of above mentioned Air conditioner/Unit. The Contractor is liable to pay compensation to the indl as decided by the contractor authority. Principal employer will not be responsibile for the same.

-

-

-

... More
(iii) If complaint not attended by the contractor with in 5 hrs the penalty of Rs 1000/- per hrs to be imposed & amt of penalty will be deducted from RAR. (iv) The cost of transportation (to & fro) for all kind of necessary equipment T & P shall be arranged/brought by the conractor to complete the job at site, stationery for maintenance of record. No extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically, so the contractor to specify the telephone No who will receive the complaint round th clock, After attending the complaint contractor will obtain the signature from rep of users/AGE/GE every day on a token of Complaint attended. (vi) The item no 50 and 51 consist of comprehensive, preventive and periodical maintenance of Bluestar 55 x 3 and 25 x3 Ton) centralised AC Plant at 2003 Stn Mohammadpur under GE (AF) Gurgaon. The work under this contract shall be carried out through authorised dealer/ repairer of M/s Bluestar Ltd only all as described in item No 50 and 51 special conditions,

-

-

-

... More
particular specification, MES SSR and as directed by GE. All the Bidders shall upload a letter of 'Intent of MOU' through OEM i.e. Buestar Ltd in Cover-1 reagrding the willingness of MoU to be done between Bidder & OEM post acceptance of the Tender. The letter of declaration shall be as per format given hereinafter in PS of Tender Documents. Failing to which Bidders shall be rejected for bid opening of Cover-II. The contracor will also submit the physical copy of MOU along with their application and DD in the office of tender inviting authority prior to bid opening date (Cover no 1) failing which bid submitted by the contracor will be summarly rejected. The successful L1 Bidder shall submit MOU as per format within 07 days from date of issue of Work Order No 1, failing which late charges @0.5% OF CA amount per week from date of acceptance shall be imposed on contractor. The contract shall be liable to be cancelled without any notice under condition 54 of IAFW 2249 if MoU not submitted by L1 bidder within 5 week of acceptance. On occassion to this Performance Security @ 5% shall be forfeited by Department and work may be get executed under other means. Any Condonation of delay will be adjudicated by the Accepting Officer only. No extension will be granted on the part of OEM causing delay in signing the MoU with L1 bidder.

-

-

-

... More
Dismentaling & Reinstallation of Compressor. Dismentaling & Reinstallation of EXV, Dismentaling & Reinstallation of Drier, Leak Testing, N2 Pressure Testing, Flashing, Vaccumization, Refregrent Charging and commisioning of (XWCS2026AR2) Chiller Units complete all as specified and as directed.

2

-

-

... More
Supply & Charging of Refrigrent for compressor of centralised AC plant complete all as specified and as directed.

24

-

-

... More
Supply & Installation of Contactor 16 A complete all as specified and as directed.

1

-

-

... More
Supply & Installation of Contactor 63 A complete all as specified and as directed.

1

-

-

... More
Descaling or Wet wash Service with chemical of Condenser complete all as specified and as directed.

6

-

-

... More
Wet Wash Service with Chemical Of AHU complete all as specified and as directed.

7

-

-

... More
Supply & Installation of Motorized Valve complete all as specified and as directed.

2

-

-

... More
Supply & Installation of Analog Temp. Meter complete all as specified and as directed.

6

-

-

... More
Supply & Instalation of Digital Volt meter complete all as specified and as directed.

8

-

-

... More
Supply and instalation of Insullation for Chilled Water Pipe Line complete all as specified and as directed.

50

-

-

... More
Supply and instalation of Insullation for Hot Water Pipe Line complete all as specified and as directed.

40

-

-

... More
Supply of Compressor SZ185 for (XWCS2026AR2) Chiller Units HSN 84148011 complete all as specified and as directed.

1

-

-

... More
Supply of FILTER DRIER 023Z0014 DCL 305 5/8 For (XWCS2026AR2) HSN( 84213920 ) complete all as specified and as directed.

2

-

-

... More
Supply of EXP VALVE-HFES-10 For (XWCS2026AR2) HSN (848180500) complete all as specified and as directed.

1

-

-

... More
Supply of DX CONTROLLER(LCD)3COMP AC (TANDEM) for (XACYS2060R2) HSN (85381010) complete all as specified and as directed.

1

-

-

... More
M&L for Annual Maintenance ,Repair and making serviceable to fire fighting system including rewinding induction motor upto 75 HP and repair to pump upto 85 HP ,LT panel wiring ,pumpset strater contractors,replacing foot valve ,pressure switch ,hydrants,,pipe line ,sprinkler,etc and refiling of all the fire extinguisher ,installed at Auditorium cum cinema Hall including functioning of all components ,cleaning all devices ,replacing all defective spares/components ,comprising of the following installed and all as specified and directed . Note- a) Contractor shall give the Demo and training for all staffs about the fire fiting System the quoted rate is deemedto be included in the same. (b) T&P ,saftey belts ,ladder toolsetc required for working at hight of 80 ft are deemed to be included in quoted rate.

9

-

-

... More
Supply and fixing fire Hydrant valve single headed of size 63mm dia with reel locking and CI wheel, complete all as specified and as direceted.

5

-

-

... More
S&F Hose box made of 18 gauge MS Sheet 800mm X 600mm X 250mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet painted fire red out side and brilliant white inside yard, complete all as specified and as directed. Note: 1) Painting and changing new locks and glass of exiting serviceable boxes (20 Nos) as per required is deemed to be included in quoted rate.

16

-

-

... More
S&F pump CI stainers for suction, flange/threaded as per site, complete all as specified and directed of size upto 100mm dia complete all as specified and as directed.

1

-

-

... More
M&L for Maintenance and servicing of 3 phase Online UPS of capacity 40 KVA make Sukam at Auditorium. AMC include following scope of work: (i) Repair replacement of worn out parts. (ii) Checking and rectifying/replacing PCB boards, logical units, LED light, LED display, logic control units, push button, switches, voltmeter, ammeter, cooling fan and motor, MCCB, MCB, transformer, insulators, bus bars, voltage stablizing unit, battery lugs and terminals and internal and external wiring. (iii) Servicing, oiling, greasing and checking periodical or as when required. (iv) Periodically checking and performing test like earth test, battery checking, battery backup checking and maintaining battery back up of 45min at any instant.

1

-

-

... More
Supply only Altoch GP granuals complete all as specified and as directed.

360

-

-

... More
Testing of Water Samples for Chemical, bacteriological & metal analysis as mentioned below from User end and from the nearest point of OHT tank complete all as specified and as directed for the following test:-.

11

-

-

... More
(a)          PH

-

-

-

... More
(b)          Specific Conductivity

-

-

-

... More
(c)          Free Chloride (CL)

-

-

-

... More
(d)          Total Harness as Ca CO₃

-

-

-

... More
(e)          Iron as (FE)

-

-

-

... More
(f)           Arsenic (AS)

-

-

-

... More
(g)          Total dissolved solids

-

-

-

... More
(h) Coliform

-

-

-

... More
(i) E. Coli

-

-

-

... More
(j) Colour

-

-

-

... More
(k) Odour

-

-

-

... More
(l) Taste

-

-

-

... More
(m) Floride

-

-

-

... More
(n) TDS

-

-

-

... More
(o) Turbidity

-

-

-

... More
Note :-

-

-

-

... More
(a) Sample of Water for the above media test are to collected in transparent sterlized container/Jar/bottle (to be arranged by contractor) separately for each test against each pump houses. (Hygienically clean bottles) and proper sealing must be done by contractor.

-

-

-

... More
(b) Sample of water to be collected before and after treatment shall be forwarded to Govt Lab approved & NABL accredited Lab for testing within spitulated time frame. No Extra payment will done for transportation charges.

-

-

-

... More
S&F in replacement of gun metal gate valve (heavy duty) with iron wheel head screwed both ends for iron pipe of 20 mm dia bore complete all as specified and as directed.

36

-

-

... More
All as per Item No 74 above , but 25 mm dia complete.

29

-

-

... More
All as per Item No 74 above , but 40 mm dia complete.

13

-

-

... More
All as per Item No 74 above , but 50 mm dia complete.

7

-

-

... More
S&F jointing and testing of cast iron sluice valve ISI mark (PN-1.6) confirming to IS 14846-2000, flanged ends drilled having stainless steel spindle with cast iron wheel at top complete with nuts, bolts washers and gaskets including taking down unserviceable sluice valve complete all as specified of size 80mm complete all as specified and as directed.

8

-

-

... More
All as per Item No 78 above , but 100 mm dia complete.

7

-

-

... More
All as per Item No 78 above , but 150 mm dia complete.

5

-

-

... More
All as per Item No 78 above , but 200 mm dia complete.

2

-

-

... More
S & F in replacement of Non return valve size 80 mm dia , including rubber fibre board gasket joint at both ends with nuts , bolts & washers including necessary earth work complete all as specified and as directed.

4

-

-

... More
S & F in replacement of Non return valve size 100 mm dia , including rubber fibre board gasket joint at both ends with nuts , bolts & washers including necessary earth work complete all as specified and as directed.

2

-

-

... More
S&F GI Tubing , medium grade , 20 mm dia bore in trenches or on wall/ceiling/floor complete all as specified and as directed.

45

-

-

... More
All as per Item No 84 above , but 25 mm dia complete.

60

-

-

... More
All as per Item No 84 above , but 40 mm dia complete.

24

-

-

... More
All as per Item No 84 above , but 50 mm dia complete.

60

-

-

... More
M&L for construction of Valve pit chamber 90 cmx90cm (inner dimension) and 90 cm deep , from the top of MS cover fixed on PCC Base , top cover shall be of 3 mm thick MS Sheet with locking arrangement of pad lock of 50mm size including brick work with sub class"B" bricks in CM 1:4 including 15 mm thick plaster in CM 1:4 (internally and externally) and necessray earth work in anu type of soil including returning filling in and disposal of surplus oil to a distance n exc 50 mtrs and 150 mm thick PCC 1:4:8 , type D-2 , using 40mm graded stone aggregates as in floor complete all as specified and as directed.

12

-

-

... More
M&L for Cast ironpipes with spigot and socket ends centrifugally cast in any length laid in trenches of 100mm bore complete all as specified and as directed.

20

-

-

... More
M&L for Cast ironpipes with spigot and socket ends centrifugally cast in any length laid in trenches of 150mm bore complete all as specified and as directed.

18

-

-

... More
M&L for Bends (any type, radius and angle) tapers any type, (straight, bend, increasing, decreasing or double socket etc.) Tee pieces single branch. "Y" junction, double branch, cross (all sockets or socket and spigot) collars, caps and plugs suitable for CI pipe upto 150 mm dia, complete all as specified and as directed.

185

-

-

... More
M&L of Run Lead joint for spigot and socketed pipes and fittings of 100 dia bore complete all as specified and as directed.

10

-

-

... More
M&L of Run Lead joint for spigot and socketed pipes and fittings of 150 dia bore complete all as specified and as directed.

10

-

-

... More
Excavation in trenches n exc 1.5 wide and n exc 1.5 m in depth for foundation etc or for laying cable etc n exc 10 Sqm on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and as directed.

25

-

-

... More
Returning filling in including spreading, leveling, watering and well ramming in layers n exc 25 cm complete all as specified and as directed.

22

-

-

... More
Removal of excavated material / surplus soil to a distance not exiding 50 m and depositing where directed at a level n exc 50 m above the starting point complete all as pecified and as directed.

3

-

-

... More
M&L for cross arms, bracing supports, claimps and back plates fabricated form structural steel sections including nuts, bolts, washers, welding bending cold or hot, drilling hols for bolts, in any shape or size as incicated and iclusinve of one primer coat one under coat and one finishing coat of paint,complete all as specified and as directed.

1.85

-

-

... More
M&L for Service/Repair for the automation water supply system installed at Master monitoring panel via 1 No Micro processor based Remote Terminal Unit Panel for 2 nos. of Level sensor 3 Nos motor acuated butter fly valve, installaed at Mohammadpur OHT, The Scope of work includes carrying out complete repairs as required to make system full functional of all the sub systems viz.RTU(REMOTE TERMINAL UNIT) based master monitoring audio generator (with all accessories) ,motorised valves, level sensors,level switches ,remote communication panels,GSM modem personel computer, UPS SCADA software for automation system and generate backup of SCADA Data base-01 No. S&F in replacement of unservicable parts, refixing of old servicable parts/new parts if any and preparing the records/register complete for the following places complete all as specified and as directed. Note: rates for the required spares are extra as specified below.

1

-

-

... More
M&L for System monitoring by expert technician round the clock and during fault/faliure of system /services for the automation water supply installed at master monitoring & operating master panel via 1 . No micro processor based remote terminal unit panel for 2 nos Nos level sensor , 3 nos motor actuated motorise valve panel installed at mohammadpur OHT . The scope of work includes carrying out complete monitoring as required of all the sub systems viz. RTU (REMOTE TERMINAL UNIT) based master monitoring and audio generators ,motorised valves,level sensors,personel computer ,ups ,SCADA software for automation system and generate backup of SCADA Database -01 No S&F in replacement of unservicable parts , refixing of old servicable parts/new parts if any and peparing the records /register complete included in quoted rates complete all as specified and as directed.

11

-

-

... More
Supply of internet security anti virus software with one user license for one year complete all as specified and as directed.

1

-

-

... More
Supply for fixing and replacement of old /unsl of UPS of suitable capacity 600VA , 230 V AC FOR MASTER CONTROL STATION complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable of inverter of suitable capacity 1KVA, 230V AC FOR OHT PANEL including each item to make system serviceable complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable inverter battery backup 12v ,42 ah panel including each item to make system serviceable complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable ultra sonic level transmitter for level monitoring for overhead tank with following specification- 12 to 24 DC operated output 4-20 mA.Range 0-5 mtrs including each item to make system serviceable complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable butterfly valves of 150 mm line size along with motorized actuator including each item to make system serviceable complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable actuator for 150 mm line size butterfly valves and actuator can be direct mount/extended shaft mounting type with 2 nos. torque limit and 2 nos. open /close limit siwtches as per site complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable actuator for 250 mm line size butterfly valves and actuator can be direct mount/extended shaft mounting type with 2 nos. torque limit and 2 nos. open /close limit siwtches as per site complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable ARM7 based cpu card with rs-485 ,USB, ETHERNET 2 nos RS-32 port ,SD card socket , Real time clock of model IRTU6000 complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable analog and digitl input output interface unit of model IRTU6000 complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable 16 digital input ,8 analog input module of model IRTU 6000 complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable 16 digital input module of model IRTU 6000 complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable 24 V DC SMPS/5/12 VDC SMPS AMP 2 AMP of model Irtu6000 complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable 5/12 VDC SMPS with battery charging and cutoff module of model iRTU 600 complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable wireless model suitable for GSM based comm. System to be mounted in RTU OR at master control system complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable nos. of GSM SIM card make functional/active during contact period charges including rental/sms charged for the period 1 year complete all as specified and as directed.

2

-

-

... More
S&F in replacement of unserviceable externalhigh gain antenna unit along with extension patch cord complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable relay -2 c/o ,240 V AC /24 VDC for master and slave panel complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable selector switch for valve local /remote and open/close switch complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable suitable rating of MCB complete all as specified and as directed.

1

-

-

... More
S&F in replacement of unserviceable Indication lamp 230 Vac opertaed for panel complete all as specified and as directed.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.