Military Engineer Services Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MES_605255_2Bid Award Id
ViewTender No
3015/A/EP/03/E3Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(a) 150 mm diameter bore holes Depth Eight Mtr as per IS specification.
-
-
-
... More
(i) For Soil Investigation = One Nos boreholes.
-
-
-
... More
(ii)For CBR value= NIL Nos places.
-
-
-
... More
(iii)For K value= NIL Nos places. If applicable marked in site plan
-
-
-
... More
(b) Collection of disturbed and undisturbedsoil sample at interval of 1.00 mtr or at change of strata or as per relevant IS Code.
-
-
-
... More
(c) Conduction lab test on disturbed soil samples as considered necessary according to relevant specification of IS 2720:-
-
-
-
... More
(i) Sleve analysis & Grain size distribution by sieve analysis & hydrometer test.
-
-
-
... More
(ii) Atterberg limits.
-
-
-
... More
(iii) Natural moisture content.
-
-
-
... More
(iv) Particle size analysis test.
-
-
-
... More
(v) Bulk density/Dry density.
-
-
-
... More
(d) Conduction lab test on disturbed soil samples as considered necessary according to relevant specification of IS 2720 and detailed result showing all relevant calculations, inferences, indices and parameters shall be given in the soil report:-
-
-
-
... More
(i) Sieve analysis.
-
-
-
... More
(ii) Atterberg Limits.
-
-
-
... More
(iii) Natural moisture content.
-
-
-
... More
(iv) Particle size analysis test.
-
-
-
... More
(v) Bulk density.
-
-
-
... More
(vi)Specific gravity.
-
-
-
... More
(vii) Free swell index and swelling properties of soil.
-
-
-
... More
(viii)Organic matter in soil if any.
-
-
-
... More
(ix) Consolidation test (Compressed index value).
-
-
-
... More
(x) Triaxial compression test and deternination of shear parameters (c & ϕ test) as per relevant IS.
-
-
-
... More
(xi) Harmful salts (complete investigation as already ref.)
-
-
-
... More
(e) Ground Water Table:-
-
-
-
... More
(i) Maximum and minimum levels of Ground Water in the area with source of information
-
-
-
... More
(ii) Ground Water Table during the investigation.
-
-
-
... More
Submission of Six copies of ink signed test report with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size distribution curves, compressive index curves, site plan etc.
-
-
-
... More
The SBC of the soil is required to be given as per following table. Calculation of bearing capacity will be governed generally as IS 8009 (Pt-I)-1976, IS 2720 (Pt-II)-1980, IS 6403-1981, IS 1904-1986 & IS 1080-1985 and other relevant IS codes and detailed calculations duly showing the various soil parameters/ indices shall be given in the Soil Report:-
-
-
-
... More
Depth of SAFE BEARING CAPACITY OF SOIL IN T/M2 FOR FOOTING SIZES Remarks foundation
-
-
-
... More
1.2mx1.2m 1.5mx1.5m 2.0mx2.0m 2.5mx2.5m
-
-
-
... More
1m
-
-
-
... More
1.5m
-
-
-
... More
2.0m
-
-
-
... More
2.5m
-
-
-
... More
Determination of K-value (Soil subgrade modulus) of soil at various depth (as above) in field as relevant IS Code.
-
-
-
... More
With every site's Soil Investigation Report, a detailed site plan showing the approx Location of each bore duly numbered as per log of bore hole should be enclosed. Location of foundation of adjacent structures especially those that might be impacted by the proposed construction.
-
-
-
... More
Every page of the Soil Investigation Report should have the Name of the Job for which Soil Investigation is being carried out. In case of multiple sites of a single Job are being investigated name of each site be put on each page of report pertaining to the site.
-
-
-
... More
All pages of the Soil Investigation Report shall be serially numbered, stamped and signed by the Agency carrying out the Soil Investigation. Report should be scrutinized by GE & CWE for correctness & endorsed.
-
-
-
... More
Transportation charges including loading and unloading of heavy girders, T & P technician etc complete from laboratory to work site and back shall be deemed included in rates quoted by bidders.
-
-
-
... More
Photographic record of geo-explorations as well as testing shall also form part of the report.
-
-
-
... More
The GE shall intimate the approximate type of construction, utilization and dimensions of proposed building to the consultant, who based on Geotechnical investigations should recommend type of foundation (viz isolated/ combined footing, raft, pile etc.)
-
-
-
... More
In case of underground buildings/basement construction, or if requirement of temporary/permanent deep excavation support measures during construction of building are envisaged necessary, excavation support measures to be given by the consultant based on geotechnical investigation.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements