Military Engineer Services Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Jan 2024
Closing Date10 Feb 2024
Tender Amount₹ 39,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same. (iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000/ per hour to be imposed and amount of penality shall be deducted from RAR. (iv) The cost of transportation (to and fro) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically, so contractor to specify the telephone number who will receive the complaint round the clock. After attending the complaint contractor shall obtain the signature from rep of User/AGE/GE every day as a token of complaint attended.

-

-

-

... More
(vi) The Schedule 'A' (BOQ) consisting of Comprehensive, preventive and periodical maintenance of VRV AC A&B Group (Make: VOLTAS, of indoor capacity 97.5 TR, outdoor capacity (96 HP) installed at IMAC station Under GE (AF) Gurgaon. Comprehensive and preventive maintenance shall be carried out by contractor through trained certified Engineer only. (vii) The work under item 1.00 to 1.01 above shall be carried out through authorised dealer/repairer of M/s VOLTAS Ltd only all as described in Schedule-'A', Special Conditions, Particular Specifications, MES SSR and as directed by GE/Engr-in-Charge. Comprehensive and preventive maintenance shall be carried out by contractor through trained Engineer of M/s Voltas Ltd only.

-

-

-

... More
The MOU shall be signed by both the parties (i.e.) contractor and OEM on a non judicial stamped paper of Rs. 100/- duly notarized. All the Bidder shall uploaded a letter of 'Intent of MOU' through OEM in M/s Voltas Ltd in cover-1 regarding the willingness of MOU to be done between Bidder & OEM post acceptance of the tender. The letter of declaration will be as per format at ser page No _____ of tender documents, failing to which bidders shall be rejected for bid opening of cover-II. The successful L1 bidder shall submit MOU as pmat whithin 07 days from date of issue of work order No 1, failing which late charges @ 0.50% of CA amount per week from date of acceptance shall be imposed on contractor. The contract shall be liable to be cancelled without any notice under condition 54 of IAFW-2249 if MOU not submitted by L1 bidder within 5 week of acceptance. On occassion to this Performance Security @ 5% shall be forfeited by department and work may be get executed under other means. Any condonation of delay will be adjudicated by the Accepting Officer only. No extension will be granted on the part of OEM causing delay in signing the MOU with L1 bidder.

-

-

-

... More
Supply only following items 2.01 to 2.16 below for replacement not included in the quoted rates against item 1.00 to 1.01 above by the contractor under comprehensive/preventive/periodical maintenance for VRV AC A&B Group. Labour charges, transportaion and testing charges shall be included in quoted rates against item 1.00 above:-

-

-

-

... More
Supply only Fan motor Inverter PCB 8 - 16 HP of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Electronic Expansion Valve wire of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Main IPM Service Pack of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Fan relay control board of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Lightning Proof Board of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Magnetic Contactor A26D-30-01 of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only DC fan motor ZKSP-560-8-1 of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only AC fan YKS-380-4-1 of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Main Control IPM Card of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only inverter PCB of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Inverter Compressor of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Fix Compressor of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Four -way reverse valve of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Refrigerant R410A complete all as specified and as per OEM's instructions.

330

-

-

... More
Supply only Cassette AC Water Tray of existing make complete all as specified and as per OEM's instructions.

2

-

-

... More
Supply only Central Remote Controller (CCM03) of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
M&L for Comprehensive, preventive and periodical maintenance of 3 Nos Precision Air Conditioner of capacity each 23 TR Each (Make: STULZ Chspl INdia, Model No-SEC852A, Microprocessor type C-7000) , by Inspecting the plant system and carry out preventive maintenance as per the standard practice monthly in contract period, Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant, Checking the system for any leaks and rectification of leaks found, ensure drain is not clogged Taking set of readings and evaluating to ensure satisfactory performance of the plant, Checking the Refrigeration control system for operation and adjusting the settings, Checking the functioning of compressors and its accessories, Cleaning up of units & air filters, check the proper functioning of controllers , Lubricating the bearings of motors & fans when found necessary, Replenishment of refrigeration gas as a result of fare wear and tear, attend all breakdowncalls with in 2-4 hours, replaced worn out parts with in 24 hours subject to normal working days,

9

-

-

... More
Overhauling the components of the equipment at site or in service station as and when required, Checking of the microprocessors PCBs and sensors of IDU/ODU units for its proper functioning and repair replacement of the same if found necessary, Attending to complain breakdown calls whenever required, Reporting the healthiness of the plant and suggesting improvements if any, complete all as specified and as directed.

-

-

-

... More
(i) Contractor is responsible for repair/replacement of existing make/model of following components:- (ii) Compressor, main controller of PAC Units, switch gear components in the unit, Fan motor (Indoor), Fan motor(outdoor), filter drier, solenoid valve, expansion valve, microprocessors PCBs and sensors of IDU/ODU units, condensor coil, charging of Refrigerant gas at any time/specified qty, sensors, capacitors, all worn out PCB card, indicators, wiring/connectors, Door, sob components belts,coils and including all minor/major spare parts required for proper functing of PAC unit except the items supplied under Item Nos 4.01 to 4.04 hereinafter.

-

-

-

... More
Supply only following items 4.01 to 4.04 below for replacement not included in the quoted rates against item 3.00 to 3.01above by the contractor under comprehensive maintenance of 03 PAC. Labour charges, transportaion and testing charges shall be included in quoted rates against item 3.00 above:-

-

-

-

... More
Supply only Air Filter for PAC Unit Model SEC 852A of existing make complete all as specified and as per OEM's instructions. Note- 01 set consist of 6 filter.

1

-

-

... More
Supply only charging refrigerant R-407 C after nitrogen testing in new sealed cylinder complete all as per site requirement as directed.

200

-

-

... More
Supply only Humidifier Bottle for PAC of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Supply only Display Controller for PAC of existing make complete all as specified and as per OEM's instructions.

1

-

-

... More
Note for Item No 3.00 to 4.04: (i) The tenderer shall have to replace the unserviceable material with OEM material only. The cost of replacing major spare parts shall be included in quoted rates except items mentioned against Item No 4.01 to 4.04 hereinbefore, which shall me measured and paid seperately as Supply only. Old material retrieved from replacement will be the contractor property and credit of same shall be recovered from RAR. (ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same. (iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000/ per hour to be imposed and amount of penality shall be deducted from RAR.

-

-

-

... More
(iv) The cost of transportation (to and fro) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically, so contractor to specify the telephone number who will receive the complaint round the clock. After attending the complaint contractor shall obtain the signature from rep of User/AGE/GE every day as a token of complaint attended. (vi) The Schedule 'A' consists of Comprehensive, preventive and periodical maintenance of 3 Nos Precision Air Conditioner of capacity each 23 TR Each (Make: STULZ Chspl INdia, Model No-SEC852A, Microprocessor type C-7000) installed at IMAC station Under GE (AF) Gurgaon. The work under this contract shall be carried out through authorized dealer/ repairer of M/s STULZ Chspl INdia LTD only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE.

-

-

-

... More
Comprehensive and preventive maintenance: The work under above item 3.0 to 4.04 shall be carried out through authorized dealer/ repairer of M/s STULZ Chspl INdia LTD only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE/Engineer-in-charge. Comprehensive and preventive maintenance shall be carried out by contractor through trained Engineer of M/s STULZ Chspl INdia LTD only. The MOU shall be signed by both the parties (i.e) contractor and OEM on a non judicial stamped paper of Rs 100/- duly notarized. All the Bidders shall upload a letter of 'Intent of MOU' through OEM ie M/s STULZ Chspl INdia LTD in Cover-1 reagrding the willingness of MoU to be done between Bidder & OEM post acceptance of the Tender. The letter of declaration shall be as per format at Ser Page No _____ of Tender Documents. Failing to which Bidders shall be rejected for bid opening of Cover-II.

-

-

-

... More
The successful L1 Bidder shall submit MOU as per format within 07 days from date of issue of Work Order No 1, failing which late charges @0.5% OF CA amount per week from date of acceptance shall be imposed on contractor. The contract shall be liable to be cancelled without any notice under condition 54 of IAFW 2249 if MoU not submitted by L1 bidder within 5 week of acceptance. On occassion to this Performance Security @ 5% shall be forfeited by Department and work may be get executed under other means. Any Condonation of delay will be adjudicated by the Accepting Officer only. No extension will be granted on the part of OEM causing delay in signing the MoU with L1 bidder.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.