If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Comprehensive Maintenance Of 1.7 Mw Solar Power Plant
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_669377_3Tender No
CWE/TKD/GUR/TOKEN-42 OF 2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
(1) PVModule Cleaning-fortnightly basis
(2) Module InterconnectsTightness–Visual Check Monthly
(3) Integrity of Cable Terminations in Junction Box by Visual Check- Monthly
(4) Visual Inspection of Cracked,Chipped and Broken Modules- Monthly
(5) Visual Inspection of Rodent Attacks onCable Conduits- Monthly
(6) Visua lInspection of Junction bo x&Combiner Box enclosures-Monthly
(7) Hardware on Structures-Monthly
(8) Vertical Post Structures Rigidity–Visual Check Quarterly
(9) Earthing Strip Check-visual check- Half Yearly
(10) DC and AC terminations checks and retightening as required in Inverters–Visual Check- Half Yearly
(11) Cleaning of Filters in Suction Side of Inverters- Monthly
The proposed bidg and SPV generation shall be as Appx 'A' Attached Guaranted CUP of the plants : The plant shall produce minimum generated electricity of 25,65,000 units per year Depriciation 6% of the total generated unit is to be accepted. Difference in generation produce in KWH after depriciation unit of 6% will be recovered from contractor due as per rate of works order amount per unit of plant.
Note No.3: Comprehensive maintenance of solar power plant shall start from the day of handing over of site. The scope of comprehensive maintenance shall be as under:-
Terms & Conditions:
• Any spares & material required during O&M of plant shall be provided by Contractor.
• Payment:100% of total contract sum after completion of each Year.
• Cost of plant Insurance shall be borne by contractor.
• Permanent dedicated Technical staff shall be provided by contractor.
-
-
-
Supply & Fixing of Solar PV Module* Poly Crystalline 330 Wp with Make of module as pre latest Approved List Of Module Manufacturer (ALMM) issued by MNRE, with allied hard ware including Nut Bolt, Clamps complete in all respect.
a) The Module used to be of 72 cells with efficiency 16% .
b) The module shall confirm to IS 14286/IEC61215,IS/IEC61730-PART-1, IS/IEC61730-PART-2
c) The module used must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 Year& 80% at end of 25 Years. d) The solar module shall have anti-reflective coating to help & absorb more light in all weather conditions
30
-
-
Supply & Fixing of Solar String Inverter 20 KW of 160-1000V DC Input Voltage range and 400 V AC , Three phase , 4 wire , 50Hz+/- 2.5 Hz, Output voltage suitable to generate AC power with efficiency not less than 97%, total Harmonic distortion less than 3% & suitable for ambient temperature from -25 to +65 Degree C. The PCU Shall adjust the voltage & frequency level to suit the grid voltage & frequency.
a) The Inverter shall compliance the standard as per EN 61000-6-1/-3, EN 61000-3-11/-12, IEC62109-2, IEC 61727, IEC 62116, IEC 61683, IEC 60068, EN 50530
b) Topology: Transformer less
c) Cooling: Smart Forced air cooled d)Mounting Method: Wall Mounted
e) Make: Sungrow
3
-
-
Supply & Fixing of Solar String Inverter 33 KW of 160-1000V DC Input Voltage range and 400 V AC , Three phase , 4 wire , 50Hz+/- 2.5 Hz, Output voltage suitable to generate AC power with efficiency not less than 97%, total Harmonic distortion less than 3% & suitable for ambient temperature from -25 to +65 Degree C. The PCU Shall adjust the voltage & frequency level to suit the grid voltage & frequency.
a) The Inverter shall compliance the standard as per EN 61000-6-1/-3, EN 61000-3-11/-12, IEC62109-2, IEC 61727, IEC 62116, IEC 61683, IEC 60068, EN 50530
b) Topology: Transformer less
c) Cooling: Smart Forced air cooled d)Mounting Method: Wall Mounted
e) Make: Sungrow
3
-
-
Supply & Fixing of Solar String Inverter 50 KW of 160-1000V DC Input Voltage range and 400 V AC , Three phase , 4 wire , 50Hz+/- 2.5 Hz, Output voltage suitable to generate AC power with efficiency not less than 97%, total Harmonic distortion less than 3% & suitable for ambient temperature from -25 to +65 Degree C. The PCU Shall adjust the voltage &frequency level to suit the grid voltage & frequency.
a) The Inverter shall compliance the standard as per EN 61000-6-1/-3, EN 61000-3-11/-12, IEC62109-2, IEC 61727, IEC 62116, IEC 61683, IEC 60068, EN 50530
b) Topology: Transformer less
c) Cooling: Smart Forced air cooled d)Mounting Method: Wall Mounted
e) Make: Sungrow 33/50 kW 1 SET 162000 162000
3
-
-
Supply & Fixing of Solar String Inverter 60 KW of 160-1000V DC Input Voltage range and 400 V AC , Three phase , 4 wire , 50Hz+/- 2.5 Hz, Output voltage suitable to generate AC power with efficiency not less than 97%, total Harmonic distortion less than 3% & suitable for ambient temperature from -25 to +65 Degree C. The PCU Shall adjust the voltage &frequency level to suit the grid voltage & frequency.
a) The Inverter shall compliance the standard as per EN 61000-6-1/-3, EN 61000-3-11/-12, IEC62109-2, IEC 61727, IEC 62116, IEC 61683, IEC 60068, EN 50530
b) Topology: Transformer less
c) Cooling: Smart Forced air cooled d)Mounting Method: Wall Mounted
e) Make: Sungrow 33/50 kW 1 SET 162000 162000
3
-
-
S&F 4 Sqmm single core stranded PVC insulated copper conductor FR cable for connection of fittings, complete all as specified and directed by Engr-in-Charge.
160
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%