Haryana Urban Development Authority Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Haryana Urban Development Authority - HUDA Tender

Works
Eprocure
Opening Date12 Dec 2019
Closing Date18 Dec 2019
Tender Amount₹ 2,00,000 
Notes
Download

Costs

  • EMD

    ₹ 4,000
  • Document Cost

    ₹ 250
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete 1:1 1/2:3 with stone aggregate 20mm nominal size for reinforced concrete work in slabswith inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring & shuttering laid in position complete in all respects. Extra over Item Nos. 10.79 to 10.94 if 1:1:5:3 mix is used, instead of 1:2:4.

9

-

5966.4

... More
Cement concrete 1:2:4 with stone aggregate 20mm nominal size in foundation and plinth

5

-

3385.8

... More
Wrought ironand mild steel (using angales, flates, square bars, teesand channels laddersgrills gratting frames window quards,iron doors openable or fixed staircase or parapet or anyother type of railing gates and tree gaurds etc.including cost of screws and welding roads or bolt and nuts complete fixed in position.

1.5

-

6242.1

... More
Earth work excavation in foundation trenchesetc. in all kinds of soils, net excavated 2Mdepth including dressing of bottom and sidesof trenches stacking the excavated soil clearfrom the edge of excavation sub sequent filling around compaties, including indisposalof all surplus soil as directed with in a lead 0.30 Mtr.

40

-

58.17



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.