Aravali Power Company Private Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Aravali Power Company Private Limited - APCPL Tender

Services
Eprocure
Opening Date3 Jun 2021
Closing Date14 Jun 2021
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Battery Bank (110V) Preventive Maintenance

60

-

1896.06

... More
Battery bank Capacity test

29

-

3160.11

... More
HT Motor (3.3 KV) / LT Motor(=30 KW) Preventive Maintenance

500

-

1264.05

... More
LT Motor Preventive Maintenance (= 7.5 kw and 30 kw )

250

-

578.45

... More
LT Motor Preventive Maintenance ( 7.5 kw)

1650

-

96.41

... More
Greasing of motor

30

-

385.63

... More
HT Switchgear Feeder Preventive Maintenance

60

-

948.04

... More
Preventive Maintenance of LT Switchgear Feeder /Hopper Heater Junction Box/ ESP & AHP Blower Heaters/AWRS VFD Panel / HCSD/TAC /Rotary Feeder VFD / Diesel Engine control panel / any other local panel

3860

-

474.01

... More
Preventive Maintenance of Switchgear Board (One section/ Half board)

35

-

3508.21

... More
Preventive Maintenance of Control Panel (BAPCON, RAPCON, STATCON etc.)

700

-

96.41

... More
Preventive Maintenance of Shaft Insulator Heaters of ESP

60

-

192.81

... More
Preventive Maintenance of Support Insulator Heaters of ESP

60

-

771.26

... More
Preventive Maintenance of HVR Transformers

600

-

158

... More
Shifting of material (Misc)

90

-

349.92

... More
Assistance in preventive maintenance of hydrogen plant

8

-

2528.09

... More
Part B: UNSCHEDULED MAINTENANCE

-

-

-

... More
General fault analysis for NTS & Rectifications /Minor Breakdown/ attending minor defects =4hrs /replacement / new installation of switchgear components

920

-

771.26

... More
Motor Shifting & Replacement (=100KW)

2

-

1103.31

... More
Motor Shifting & Replacement (= 7.5kw and 100 kw )

18

-

840.88

... More
Motor Shifting & Replacement ( 7.5 kw)

25

-

560.58

... More
Attending Flash Over in Breaker/ Bus Bar/ Feeder/Motor 4 hrs

3

-

3052.96

... More
HT Motor/Heater power & space heater cable connection/disconnection

13

-

385.63

... More
LT Motor/Heater power & space heater cable connection/disconnection

220

-

192.81

... More
Painting and letter writing

50

-

699.82

... More
Miscellaneous job

920

-

632.02

... More
Part C: PREDICTIVE/ROUTINE MAINTENANCE

-

-

-

... More
Daily checking of hopper heaters of ESP

400

-

192.81

... More
Daily checking of BAPCON & RAPCON of ESP

500

-

192.81

... More
Cleaning of HT/LT switchgear

100

-

192.81

... More
Cleaning of HT/LT motors of V/P, HCSD silo area of unit-1, 2, 3

180

-

385.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.