Western Railway Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Costs
EMD
₹ 1,26,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
DYCE-C-II-BRC-ROB-01-CAO-C-BRC-ENGINEERING/WESTERN RLYTender No
DYCE-C-II-BRC-ROB-01Tender Authority
Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Preparation and submission of detailed structural design and all working/construction drawings of Bridge approaches and various components such as foundation, substructure viz. piers/viaducts, abutments, RE wall/retaining wall & RCC Box etc. and superstructure including carriage way and its accessories for both approaches of the ROB Proper as per requirement of Engineer in charge. Location of abutments, piers ,RE wall retaining wall & RCC Box etc. will be based on GAD approved by the Railway and state authorities. The rate shall be all inclusive of Government Taxes like GST, VAT etc. noting extra shall be payable other than the rates accepted. Note: This item 3 includes : (i) Integrated Key Plan of entire ROB alignment covering railway portion, take off and landing approaches, arrangements of ROB approaches with NHA/other roads department will be developed and included in GAD as per the Technical Requirement mentioned in the SCC. (ii) Preparation of preliminary and detailed design of foundation substructure, Superstructure including staircase, approach slab (wherever applicable) & Good for construction drawings and all other drawing as required for construction of Railway portion of the ROB and both approaches. (iii) Preparation of bill of quantity (BOQ), detailed estimate, technical specifications for Approach portion ROB both side as per preliminary design and drawings. Note : In case BOQ, DE & technical specifications is not operated further deduction @Rs. 20,000/- for ROB will be made.
5
469568
2347840
... More
Major Bridges/ROB : Preparation of the General Arrangement Drawing for all Major Bridge / ROB for Railway Line Corridor through MX Rail/Auto CAD for railway standards/formats based on finalized L-section for the proposed alignment, hydrological investigation & detailed geotechnical investigation carried out by the consultant at proposed bridge locations, on good 4 quality tracing paper and submitting the same to Railway administration for approval and carrying out the corrections as instructed by railway with all consultants own men, material, tools & plants, Computer systems etc., as directed by Engineer incharge. Notes : 1) GAD should incorporate (a) Sub structure details with type of construction, type of foundation (pile/open/well foundation), depth of foundations, footing details/pile founds details, foundation pressure, abutments /pier details duly showing bore log details of sub soil along with SBC details of every soil strata at every abutment & piers locations.
5
9379
46895
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements