Western Railway Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Western Railway - WR Tender

Works
Civil And Construction
Excavation
Ireps
Opening Date5 Jan 2025
Closing Date5 Feb 2025
Tender Amount₹ 1,49,55,95,675.22 
Notes
Download

Costs

Summary

Execution Work Like Earthwork In Formation, Blanketing, Construction Of Major Bridges, Minor Bridges, Railway Flyover (including Misc. Works Like Pitching, Toe Wall, Floor Protection), Track Linking Work And Other Civil Engineering Works, S & T Works, Electrical And Trd Works Required For The Successful Completion Of The Work From Sabarmati D Cabin (including) To Sarkhej (including) In Connection With Doubling Of Sabarmati - Sarkhej Section Of Bhavnagar Division On Western Railway.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cable location: finding the existing various cables in station yard and along the track by 4 excavating cross/longitudinal trenches, cable finder (Locator) or any other suitable instruments the various cables of signaling, telecom, OFC, electrical or any other department. A line diagram/sketch showing the cables will be prepared & submitted as per the direction of Engineer in charge. The measurement will be made as per actual excavated length of trench.

3000

180

542280

... More
Providing & laying a layer of three dimensional cellularconfinement system GEOCELL made ofultrasonically-welded HDPEstrips, which acts as asubgrade/subbase improving reinforcement mat welddistance of eachcell=356mm, depth of cell =150 mm) between formationand track structure in bridgeapproaches as perspecifications & conditionsattached as per IS-17483.The rate is inclusive of alllabour, materials, leads,,liftscrossing of tracks, transport,including all labour, fuel,tools and plants etc.,complete. No payment for wastages will be made, andrate may be quotedaccordingly.

-

-

5

... More
Providing and fixing 50mm dia medium class M.S. pipe for CHUM test of piles including threading, water proofing jointing, lowering, placing and fixing in position, welding of M.S. plates at ends as a complete Job. (Payment of M.S. plates will be made under relevant USSOR Item)

13104

1244

16311335.04

... More
Dismantling and removing rail of all section & length from track, laid on any type & 1 density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in- charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block. For Through Rail Renewal work

19000

48

866846.03

... More
Insertion of rails of all types & length in track, laid on any type & density of sleeper to 2 the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in-Charge. Note: Rail drilling and cutting to be paid separately. For Through Rail Renewal work

19800

49

931544.95

... More
Through Fitting Renewal (TFR) on PSC track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning 3 of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in-Charge. Note: All the fittings will be supplied at SSE/Stores/Depot.

31540

35

1057137.22

... More
Lubrication of gauge face of rail on curves, cross overs, points & crossings, turn-in curves and at locations as required with contractor's grease graphite grade "O" IS 408 and as directed.

1200

5

6209.73

... More
Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : Rail section of 52Kg and above

500

108

51453.4

... More
Assembling and Laying of Improved Switch Expansion Joint (SEJ) on PSC sleepers of any rail section as per RDSO drawing including leading of SEJ rails, sleepers, fittings for a free lead of 250 6 metres, cutting of rails, drilling of holes as required and lubrication of SEJ, gauging, aligning rails, providing temporary connection with adequate welding gap with adjoining rails, providing reference posts at SEJ, first through packing of SEJ portion to make track geometry fit for 30 kmph speed and making ballast profile as per IRPWM. Note: (1) Rail cutting and hole drilling shall be paid separately.(2) One set comprise complete SEJ on both rails at SEJ. Under Conditions not requiring Traffic Block

8

7261

55157.82

... More
Assembling and Laying of Improved Switch Expansion Joint (SEJ) on PSC sleepers of any 7 rail section as per RDSO drawing including leading of SEJ rails, sleepers, fittings for a free lead of 250 metres, cutting of rails, drilling of holes as required and lubrication of SEJ, gauging, aligning rails, providing temporary connection with adequate welding gap with adjoining rails, providing reference posts at SEJ, first through packing of SEJ portion to make track geometry fit for 30 kmph speed and making ballast profile as per IRPWM. Note: (1) Rail cutting and hole drilling shall be paid separately.(2) One set comprise complete SEJ on both rails at SEJ. Under Traffic Block Conditions

5

7987

37920.99

... More
Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, 8 switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in- charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores. 1 in 12 Turnouts

7

76893

511070.92

... More
Laying and linking of turnouts of all types including diamond crossings & Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on prepared ballast bed for New lines or during total closure of section at indicated location as per standard drawing, duly leading sleepers, rails, 9 switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete as directed by Engineer in-charge. 1 in 12 Turnouts

16

57694

876490.13

... More
Manual deep screening of Plain track/ turnouts under traffic as per procedure prescribed in IRPWM, June 2020 or latest, in other than PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting 10 (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts. Depth of 300 mm below bottom of sleeper of Plain Track

350

488

162211.16

... More
Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to 11 safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge.

1300

191

236563.18

... More
Extra for additional lift over 75mm for every 50mm lift or part thereof up to 275mm for item nos. 083010 for each TRM.

900

29

25380.13

... More
Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM 13 including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge.

20000

28

534378.6

... More
Removing, screening and salvaging ballast from track, duly digging / scarifying ballast by beaters / wire brushes or any mechanical means, leveling and dressing formation with specified 14 cross slope after salvaging ballast, separating muck by screening the salvaged ballast with contractor's 20mm size sieve, stacking of screened ballast for measurement, disposing off muck at specified locations with all lead & lifts as directed by Engineer in-charge. Note: Payment shall be made for quantity of ballast stacked after screening of retrieved ballast from track.

750

331

236040.95

... More
Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre- 15 defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. Under Conditions not requiring Traffic Block:

6000

42

242920.08

... More
25mm gap 'in-situ' welding during traffic block and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by 16 Engineer in charge. Note: 1. Welding shall be carried out only by trained welder having valid competency certificate using RDSO approved Alumino Thermit Welding Portions, 3 piece prefabricated mould (ZIRCON WASHED) manually pressed, Single shot crucible fitted with auto tapping thimble and Compressed Air Petrol/LPG preheating technique as per RDSO Specification No IRST/19-2020 with latest amendment. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Only required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. All other items required shall be supplied by the Contractor. For 60 Kg - 90 UTS Rail

70

5531

367667.1

... More
25mm gap 'in-situ' welding during traffic block and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by 17 Engineer in charge. Note: 1. Welding shall be carried out only by trained welder having valid competency certificate using RDSO approved Alumino Thermit Welding Portions, 3 piece prefabricated mould (ZIRCON WASHED) manually pressed, Single shot crucible fitted with auto tapping thimble and Compressed Air Petrol/LPG preheating technique as per RDSO Specification No IRST/19-2020 with latest amendment. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Only required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. All other items required shall be supplied by the Contractor. For 60 Kg/60EI - R260 grade Rail

60

5723

326043.3

... More
25mm gap Cess Welding and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with Contractor's labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including all required handling and rehandling of rails, marking of 18 welded joint, painting weld collar with anticorrosive paint, as directed by Engineer in charge. Note: 1. Welding shall be carried out only by trained welder having valid competency certificate using RDSO approved Alumino Thermit Welding Portions, 3 piece prefabricated mould (Zircon washed) manually pressed, Single shot crucible fitted with auto tapping thimble and Compressed Air Petrol/LPG preheating technique as per RDSO Specification No IRST/19-2020 with latest amendment. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. For 60 Kg/60EI - R260 grade Rail

500

4482

2128285.26

... More
Shifting & pairing of rails / panels unloaded alongside existing running track to adjoining formation of a new line including crossing of one track, duly lifting & pushing rail / panel without 19 damaging it and taking all necessary precautions, so as not to infringe the running track, as directed by Engineer in-charge. Note: The rail barricading, if disturbed during working, should be restored to its original condition by the agency including re-fixing & concreting as required. Rail length up to 13m - Under Conditions not requiring Traffic Block

76000

17

1253453.94

... More
Shifting & pairing of rails / panels unloaded alongside existing running track to adjoining formation of a new line including crossing of one track, duly lifting & pushing rail / panel without 20 damaging it and taking all necessary precautions, so as not to infringe the running track, as directed by Engineer in-charge. Note: The rail barricading, if disturbed during working, should be restored to its original condition by the agency including re-fixing & concreting as required. For rails/panels of more than 40m length - Under Conditions not requiring Traffic Block

42000

32

1312019.1

... More
Providing Centre Line / Rail Level, reference Pegs on formation at an interval of 30 metres on one side or at centre of proposed / existing track, as directed by engineer in-charge for 21 linking of new track / CTR / Deep Screening / Lifting / Lowering works, duly embedding in formation including marking with contractor's paint. Note: (1) Rails/tie bar of suitable size bar shall be supplied by the Railways from nearest Stores Depot. In case of hard wood peg, the hard wood will be supplied by the contractor. (2) Excavation and concrete work, if required, will be paid separately. With Rail pegs

635

148

89583.71

... More
Installation of reference points for track centre line in main and loop lines, in straight orcurve portion, SRJ for turnouts, heel of crossing (HOC), locations of derailing switches, switch expansion joints etc. away from formation on firm ground at known offset with MS Angles of 50mmx50mmx5mm thick of length 1.80 m each, founded in concrete block of size 30cm x 30cm x 45cm of nominal mix 1:3:6, including painting to reference pegs with two coats of enamel paints on exposed surface, as directed by Engineer In charge. Note: Earth work and Cement concrete will be paid under relevant items.

40

851

32344.15

... More
Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form 23 consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in- charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface.

63000

48

2901795.44

... More
Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, 24 placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. For sleeper density of 1660 sleepers per km

19000

335

6053489.78

... More
Linking of track at level crossing locations as per RDSO drawings with any type of rail section and sleeper on prepared formation including leading free rails/welded panels available along the alignment on to formation, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & 25 alignment, excavating level crossing portion as necessary, fixing check rails to running rails, providing C.C blocks, chairs, anti corrosive painting to running rails and check rails, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: Rail cutting and hole drilling, if required, shall be paid separately under relevant item.

140

480

63847.61

... More
Linking of BG track (with guard rail ) over ballasted deck bridges with any type of rail section and PSC sleeper including leading free rails/welded panels available along the alignment on to bridge, leading and spreading all fittings and fastenings, leading & spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails & guard rails to sleepers with all types 26 of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. 3. This item shall be applicable only when track is with Guard Rail. Linking without guard rail be paid under relevant item for plain track linking.

75

452

32234.34

... More
Shifting / Slewing the existing or newly assembled track of any rail section with any 27 type of sleepers and any density under line block to correct locations & alignment and attending to one round kutcha packing to run safely at 20KMPH speed with all contractors tools and consumables complete and as directed by Engineer in-charge. Maximum Shifting / Slewing up to 1 metre

1200

221

252080.86

... More
Working of the Railway Push Trolley by arranging one Head trollyman along with 3 trollymen as per Railway's rules and stipulations for conducting inspections by Railway officials and as 28 directed by Engineer in-charge. Note: 1) Labourers supplied should be of skilled in case of head trollyman and semiskilled in case of trollymen and capable of pushing trolley in all gradients, and levels duly observing all safety precautions as per the manual. 2) The labour engaged should be physically fit for strenuous work, literate and meeting prescribed medical category. For Full day (8 hrs )

70

3550

236009.9

... More
Working of the Railway Push Trolley by arranging one Head trollyman along with 3 29 trollymen as per Railway's rules and stipulations for conducting inspections by Railway officials and as directed by Engineer in-charge. Note: 1) Labourers supplied should be of skilled in case of head trollyman and semiskilled in case of trollymen and capable of pushing trolley in all gradients, and levels duly observing all safety precautions as per the manual. 2) The labour engaged should be physically fit for strenuous work, literate and meeting prescribed medical category. For Half day (4 hours)

20

2276

43230.74

... More
Preparation of completion drawings of yard in AutoCAD, showing all the details, such as circulating area, approach road, platform shelter, platform, FOB etc., showing relevant particulars to appropriate scale as per IR's Engineering Code on approved quality, transparent media as per details supplied by Railways, including submission of check print for proof checking, duly incorporating the 30 suggested corrections and modifications and supplying the final plot on approved quality & transparent media with six copies of ammonia prints complete and soft copy, as directed by Engineer in-charge Note: (i) Drawings shall be prepared by using latest drawing making softwares AutoCAD, Work station etc. and printing shall be done on high end latest plotters. (ii) Stage Payment - (a) For check print - 40% (b) For Paper tracing - 40% (c) For Ammonia print & soft copy - 20%. Completion drawing of way side station

3

2852

8125.32

... More
Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more

19500

111

2067597.97

... More
First or Second Through Packing of track of all sleeper density including giving a 32 general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. For PSC Sleeper Track with Sleeper Density of 1660

700

147

97969.41

... More
De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out 33 elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any. Without Rail tensor

19000

47

854217.68

... More
Fixing Joggled Fish Plates with bolt / clamp (supplied by Railway from nearest SSE Store) in running track conditions at welds on rail, as directed by engineer in-charge (drilling of holes in rail, if required, shall be paid separately). With 2 bolts

150

117

16716.42

... More
Providing wooden blocks under weld joint duly transporting Railway's released wooden blocks with rail screw / dog spikes and doing packing, as directed under traffic condition. Note: Wooden blocks, rail screws/dog spikes will be supplied free at SSE/P.Way depot.

150

178

25435.68

... More
Maintenance of track on main line & loops, Points & crossings etc. including special attention to section for carrying out various maintenance works listed in Indian Railways P.Way Manual / Bridge Manual for safe running of goods and passenger trains with contractor's tools / labours etc. complete, as directed by Engineer in-charge. Note: Contractor shall arrange one gang at any point of 36 time comprising of minimum specified labours with sufficient experience in P.Way working. One mobile Gang comprising of 15 physically fit labours plus 1 Mate. Note: (1) In case, contractor provides less no. of Labour/Mate or for non availability of vehicle, payment will be deducted for each such person or non- availability of vehicle @ 20% of the accepted item rate, separately for each shortfall. (2) The Contractor shall keep one pick up Truck of minimum 1.5T payload capacity with Driver all the time and all expenditures for running at an average of 80 kms per day shall be born by the Contractor.

30

-

5.05

... More
Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane 37 with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. For 60 Kg Rails

40000

95

3630508.2

... More
Marking, inscribing, painting, writing, bordering etc. on new / old iron surface at various 38 locations of Points & Crossings with details of turn-in / turn-out reference station mark on rail web for one set, duly preparing surface with contractor's wire brush and applying two coats of yellow synthetic enamel paint of approved quality as background and stenciling the details to suitable size, as described for every curve reference station mark / switch / crossing details with black enamel paint of approved quality complete, as directed : Note: Stenciling of letters is only permitted. No hand written letters are accepted. 1 in 12 Turnout

12

1497

17064

... More
Painting 2 coats to various P.Way Reference Post, Structures etc. with enamel paint of approved make with 2 coats of different colours & letters, as directed by Engineer in-charge. LWR / SEJ Board

13

202

2502.52

... More
Painting 2 coats to various P.Way Reference Post, Structures etc. with enamel paint of approved make with 2 coats of different colours & letters, as directed by Engineer in-charge. Level Crossing Boards including Road Sign Boards

70

416

27669.38

... More
Painting 2 coats to various P.Way Reference Post, Structures etc. with enamel paint of approved make with 2 coats of different colours & letters, as directed by Engineer in-charge. Level Crossing Post

14

222

2951.18

... More
Painting 2 coats to various P.Way Reference Post, Structures etc. with enamel paint of approved make with 2 coats of different colours & letters, as directed by Engineer in-charge. Curve Post

16

118

1798.88

... More
Painting 2 coats to various P.Way Reference Post, Structures etc. with enamel paint of approved make with 2 coats of different colours & letters, as directed by Engineer in-charge. Curve Board 44

16

202

3080.03

... More
Curve details, SE, Versine, Station Nos. etc. per station.

240

63

14495.45

... More
Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable 45 with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) 60 Kg - 110/90 UTS - Outside Track

450

242

103631.28

... More
Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings 46 supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re-setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile. New Line Section, not opened for traffic

63000

11

660994.43

... More
Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable 47 with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) 52 Kg - 90 UTS - Outside Track

6900

219

1439834.14

... More
Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) 60 Kg - 110/90 UTS - On Running Line

250

310

73780.9

... More
Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering 49 with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. Outside Track

15150

61

884385.19

... More
Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering 50 with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. On Running Line

640

78

47824.42

... More
Loading of rails of any section and length up to 13 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer.

5000

216

1029352.95

... More
Loading of tongue rail, stock rail, switch assembly and crossings of any section and 52 length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre. In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer.

110

206

21557.45

... More
Unloading of rails of any section and length up to 13 metre, in neat manner for Railway 53 usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner. From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer.

5000

156

744408

... More
Unloading of all type of rails of length 130 metre and beyond from end unloading rake 54 and keep the panels in head-up position at specified distance from centre of track clear from any infringement.. Note: Contractor has to keep Oxygen and Acetylene gas with cutter as standby during the period of work. Not involving traffic block

2500

26

62192.25

... More
Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) 55 or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. In Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer

1020

178

172681.77

... More
Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid-section between stations in a neat 56 manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. In Wagon/Truck / trailer where mechanical handling is possible and traffic block is not required.

225

205

44000.78

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 57 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead up to 5 Km

125

179

21354.26

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 58 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 5 Km and up to 10 km 172043 300.00 MT 281.29 84387.00 (-) 5.05 80125.46

125

222

26462.56

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 10 Km and up to 20 km

-

-

59

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 60 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 20 Km and up to 30 km

10

352

3342.52

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 61 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 30 Km and up to 50 km

10

449

4271.42

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 62 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 50 Km and up to 100 Km

50

662

31431.3

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 63 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Lead beyond 100 Km and up to 150 Km

300

980

279366.64

... More
Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous 64 material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. Extra for every Km per MT beyond 150 Km over item no. 172047

50000

3

154768.5

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 65 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead up to 5 Km

600

56

32250.72

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 66 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 5 Km and up to 10 km

600

99

56770.61

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 67 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 10 Km and up to 20 km

1000

157

150002.01

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 68 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 20 Km and up to 30 km

200

228

43433.93

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 69 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 30 Km and up to 50 km

200

326

62011.85

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 70 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 50 Km and up to 100 Km

500

538

255766.82

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 71 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 100 Km and up to 150 Km

14000

857

11397816.99

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 72 vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Extra for every Km per MT beyond 150 Km over item no. 172057

21500

3

66550.46

... More
Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material 73 train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. From Truck / Trailer

11500

146

1598141.43

... More
Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material 74 train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. From Truck / Trailer

580

162

89639.07

... More
Spreading of New / SH , normal or wider base PSC sleepers from stack along track on either side for different leads with all lifts by any means. For a lead up to 500m

31600

74

2236813.11

... More
Spreading of New / SH , normal or wider base PSC sleepers from stack along track on either side for different leads with all lifts by any means. Extra to Item no. 172081 for additional lead of every 500m or part thereof beyond 500 m

64000

49

3031107.84

... More
Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length 77 with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres. From Truck / Trailer

110

234

24442.22

... More
Dismantling existing lifting barrier along with winch assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing 78 engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set.

3.5

23293

77408.63

... More
Fabrication including cutting, bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment 79 and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores.

84

1218

97163.59

... More
Manufacturing, supplying and laying factory made CC block pavers for road surface of 80 level crossings to RDSO Drg. No. M.00003, manufactured using 20mm size graded hard stone aggregates of approved quality over a well compacted sand bedding 50 thick with all contractor's cement, labour, tools/plant and curing with all lead & lift as per specifications and as directed by Engineer in-charge. 80mm thick blocks of M-35 grade for medium traffic.

505

1420

680948.78

... More
Fixing of wooden blocks of approximate size of 150mm x 300mm x 1200mm on end of check rails including sizing at level crossings with contractor's labour, tools & plants and as directed. With Contractor's hard wood block

14

1632

21696.17

... More
Erecting detonator rail posts at required locations as required including cutting the rail to required length varying from 1.00M to 1.50M , leading the rail pieces from nominated station / mid section from nearest depot to site of work, erecting the rail post by making the pit size as required and filling with CC 1:3:6 mix with 40mm aggregates and painting the rail post with two coats of synthetic enamel paint of approved colour and make, marking of detonator symbol as per site requirement, with contractor's materials, labour, paint, all lead and lifts, etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation and concrete work for foundation will be paid under relevant item.

14

580

7715.26

... More
Providing Rail Barricading with rails supplied by Railways with verticals provided at every 1.5m interval, height of barricade being up to 1.5m above ground / termination level and one or 83 more row of horizontal rail, duly cutting rails and drilling holes as required, assembling necessary accessories to required length, including earthwork excavation for foundation, fixing posts in cement concrete 1:3:6 base of size 0.45m x 0.45m x 0.60m and one coat of red oxide painting of steel work. Note: 1. Excavation and concrete work will be paid separately. 2. Rail shall be made available within 250 metres

180

1819

310960.49

... More
Erecting Emergency Chain Posts for level crossings , including cutting rail to required length varying from 1.00M to 1.50M , drilling holes, providing hooks & links / rings with necessary locking arrangements to fix emergency chain, leading the rail pieces from nominated station / mid 84 section from nearest depot to site of work, erecting the rail post by making the pit of size as required and filling with CC 1:3:6 mix with 40mm aggregates and painting the rail post with two coats of synthetic enamel paint of approved colour and make, with contractor's materials, labour, paint, all lead and lifts, etc., complete as per specifications and as directed by the Engineer-in-charge. Note: (1) Rails & chain will be supplied by Railways. (2) Excavation and concrete work for foundation will be paid under relevant item.

14

749

9962.7

... More
Fabrication, supplying and fixing 600mm x 450mm Bridge Board made from 16 SWG MS Sheet duly welded or riveted to back support of two 600mm long horizontal angles of size 25mm x 85 25mm x 3mm & two numbers 2.5 metre long vertical support of MS Angle of size 50mm x 50mm x 5mm, welded / rivetted to board. Vertical supports shall have split ends for proper fixing in ground. Vertical supports of board shall be embedded in ground in M 20 Cement Concrete blocks of size 300mm x 300mm x 300mm, complete job including painting & writing of subject matter on bridge board, as directed by Engineer - In charge Note: Excavation & concrete work will be paid separately.

6

3801

21657.43

... More
Manufacturing, fabricating and supplying retro-reflective Level Crossing Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted 86 on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x 25mm x 3mm provided all along the edges of board with theft resistant measures, back side of board shall be with non-peelable weather-proof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Bilingual Whistle Boards for level crossing of size 600mm x 600mm of each board with back support frame welded to vertical post of MS T section of size 75mm x 75mm x 6mm x 3950mm

14

8283

110108.58

... More
Manufacturing, fabricating and supplying retro-reflective Level Crossing Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure 87 conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x 25mm x 3mm provided all along the edges of board with theft resistant measures, back side of board shall be with non-peelable weather-proof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Speed Breaker / Rumble Strips Board of size 900 mm equilateral triangular shape and 600mmx200mm boards with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm

14

7646

101647.85

... More
Manufacturing, fabricating and supplying retro-reflective Level Crossing Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to 88 type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x 25mm x 3mm provided all along the edges of board with theft resistant measures, back side of board shall be with non-peelable weather-proof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Manned Level Crossing Indicator Board of size 900 mm equilateral triangular shape with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm

14

7030

93457.63

... More
Manufacturing, fabricating and supplying retro-reflective Level Crossing Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure 89 conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x 25mm x 3mm provided all along the edges of board with theft resistant measures, back side of board shall be with non-peelable weather-proof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Single Strip / Double Strip Level Crossing Road Warning Board of size 900 mm equilateral triangular shape and 900x300 board with back support frame welded to vertical post of MS T section of size 80mmx80mmx8mmx3650mm

14

8054

107063.02

... More
Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on 90 substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long

10

6908

65592.5

... More
Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on 91 substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long 202023 4.00 Each 6908.11 27632.44 (-) 5.05 26237.00

10

5917

56182.86

... More
Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Stop Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long

-

-

92

... More
Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on 93 substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed. Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long

20

8361

158786.59

... More
Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm 94 duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately)

39

1171

43395.67

... More
Erection or removal of temporary Engineering Indicator Board or any other board at specified locations without causing infringement to track etc. complete and as directed. For erection

60

272

15518.63

... More
Erection or removal of temporary Engineering Indicator Board or any other board at specified locations without causing infringement to track etc. complete and as directed. For removal

60

223

12721.4

... More
Supply and fixing in position pre-cast cement concrete Fouling Mark as per approved 97 drawing at station yard, duly painting the top surface and slopes with white enamel paint in two coats and inscribed letters with black of Fouling Mark, complete in all respects with all labour, materials including cement, tools and plants etc.

5

525

2493.1

... More
Providing and erecting water proof Gypsy Tent of size 3m x 3m for a specific period of time and removal of the same after completion of work or as directed by Engineer in-charge.

36

367

12558.47

... More
Providing furniture temporarily at site work in good condition at different locations as per direction of Engineer In-charge and removing the same after completion of work. Office Table of size 1.2m x 0.9m per day

36

70

2402.65

... More
Providing furniture temporarily at site work in good condition at different locations as per direction of Engineer In-charge and removing the same after completion of work. Office Chairs with cushioned seat, back and arms per day

72

45

3100.31

... More
Providing and fixing Trolley Refuge of size 3.0m x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting 101 inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in-charge. Note: Earth-work will to be paid separately under relevant item.

95

4788

431926.55

... More
Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity

200

846

160672.49

... More
Manufacture and supply of Precast Kilometer Posts of size 1.15 x 0.50 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly 103 making pits of size as required, painting the post, writing the letters on both sides of the post with 2 coats of enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items.

20

610

11595.1

... More
Arranging labour as and when required by the Engineer in charge, for various works 104 under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge.

700

753

500654.26

... More
Manufacture and supply of Precast gradient Posts of size 1.65 x 0.60 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly 105 making pits of size as required, painting the post, writing the letters on both sides of posts in 2 coats with enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items.

100

819

77797.28

... More
Manufacture and supply of Precast Hectometer/TP Repeater posts of size 0.90Mx0.30 mx0.30Mx0.30M Triangular size in RCC 1:2:4 mix, engraving letters, leading to work spot, and fixing in 106 position with CC 1:3:6 concrete, duly making pits of size as required, painting the post with two coats, letters on the both sides of posts with enamel paint of approved quality as per IRPWM/Railways drawings complete with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items. 107

200

273

51914.86

... More
Misc. USSOR Items required for successful completion of the work.

-

-

1044450

... More
Fabrication, assembly of in situ G3(L) type/latest as per RDSO guidelines, glued 1 insulated Rail joints for BG 60 Kg rails (Rails to be provided by Railway) with contrator's own materials, to and fro transportation of materials, octroi etc complete in all respect with 6 mm thick (latest as per RDSO guide lines) end post including rail cutting, cleaning of ends, drilling of rail end holes, chamfering during block complete rail joints (Revised updated 1998 manual with latest amendments).

56

20140

1127881.44

... More
Fabricating and erecting dead ends, rail fencings etc.including painting with at least two 2 coats of synthetic enamal paint and one coat of red oxide primer with contractor's own tools and plants, labour, lead and lift etc complete as per direction of Engineer in charge. Note: In case of erection o frails fencing, the payment of only cement concrete shall be made under respective USSOR items. Rate includes excavation for erecting and no payment for excavation shall be made.

10

5677

56779.8

... More
Providing temporary shed consisting of CGI sheets to facilitate the TWO working at stations between Sabarmati "D" cabin and Sarkhej yard for TWO size 3.00 m x 3.00 m and upto 2.50 m height, shed shall be covered with CGI sheet on roof and three sides walling with contractor's own 3 materials like CGI sheets, bamboos/Ballies, steel wire or string. The item also include supply of one PVC table of approximate size 3'x2' and 4 chairs in each gumti/hut/shed. After completion of TWO and NI, all the materials like CGI sheets, ballis/bamboos, tables, tools and plants shall be contractor's property. The rate is inclusive of all tools and plants, labour etc complete in all respect. Nothing extra shall be payable other than the accepted rates. Gumti shall be allowed for 30 days with plus/minus 3 days, for which neither extra payment shall be made nor recovery shall be made.

10

16739

167390

... More
Metal beam Crash Barrier -Double WSingle side : - Providing and erecting"W" metal beam 02 Nos barriercomprising of 2mm thick corrugatedsheet metal beam rail on 1.50m highchannel post (150x75x4mm) aboveground level and 1.20m belowground level, spaced at 2m centre tocentre, all steel parts, all fittings andfitments to be galvanized by hot dipprocess confirm to IS 4759, metalbeam rail to be fixed on the verticalpost complete. Work will be carriedout as per Railway 4 approved drawingand as per specification and specialcondition of contract attached herewith. The post should be placedbelow G.L. by Driven mechanism orauger mechanism as directedEngineer in- harge as per siteconditions. The concrete andshuttering as and when required willbe paid under the relevant items.Note :- The item rate includes withmaterials, labours, lead, lift, loading,unloading, Tools and plants, alltaxes, site cleaning, bush cutting,preparation of approach path,manual carting of materials due tounavoidable site requirement, etcwith contractors own materials andlabours necessary for doing all thework involved in constructing themetal beam railing barrier completein place in all respects as per theSpecifications. Work will be carriedout as per direction and instructionof Engineer in charge of work/Engineer representative. (No anyextra payment shall be paid byRailway).

6000

3321

19926000

... More
CARRIAGE OF MATERIALS // By Mechanical Transport including loading,unloading and stacking // Earth // 1km

-

-

1

... More
EARTH WORK // Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. 2.34.1 86.00 Litre 200.90 17277.40 25.00 (-)12958.05

-

-

6

... More
EARTH WORK // Supplying chemical emulsion in sealed containers including delivery as specified. // Chlorpyriphos emulsifiable concentrate of 20%

-

-

7

... More
EARTH WORK // Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : // Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc.: // With Chlorpyriphos E.C. 20% with 1% concentration

-

-

9

... More
REINFORCED CEMENT CONCRETE // FORM WORK // Weather shade, Chajjas, corbels etc., including edges

-

-

25

... More
REINFORCED CEMENT CONCRETE // DESIGN MIX CONCRETE // Add for using extra cement in the items of design mix over and above the specified cement content therein. 6.2.2 11.00 cum 5549.95 61049.45 25.00 (-)45787.09

-

-

31

... More
MASONRY WORK // Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: // Cement Mortar 1:6 (1 cement : 6 coarse sand).

-

-

32

... More
WOOD AND P.V.C. WORK // BRASS FITTINGS // Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : // 200x10 mm 9.78 24.00 Each 1004.80 24115.20 (-) 53

-

-

52

... More
WOOD AND P.V.C. WORK // BRASS FITTINGS // Providing and fixing bright finished brass handles with screws etc. complete: // 100 mm 9.82 8.00 Each 109.60 876.80 25.00 (-)657.60

-

-

54

... More
WOOD AND P.V.C. WORK // BRASS FITTINGS // Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete.

-

-

55

... More
STEEL WORK // Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

-

-

62

... More
FLOORING // STONE FLOORING // Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with : // Udaipur green marble

-

-

73

... More
ROOFING // Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. // Bend 87.5 degrees // 110 mm bend

-

-

82

... More
FINISHING // CEMENT PLASTER (IN FINE SAND) // 20 mm cement plaster of mix : // 1:4 (1 cement: 4 fine sand) 13.16.1 384.00 Sqm 253.05 97171.20 25.00 (-)72878.40

-

-

88

... More
FINISHING // 6MM CEMENT PLASTER // 6 mm cement plaster of mix : // 1:3 (1 cement : 3 fine sand)

-

-

89

... More
FINISHING // Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. // Two or more coats on new work 13.44.1 3998.50 Sqm 97.60 390253.60 25.00 (-)292690.20

-

-

91

... More
FINISHING // EXTERIOR FINISHING // Finishing walls with water proofing cement paint of required shade : // New work (Two or more coats applied @ 3.84 kg/10 sqm)

-

-

92

... More
FINISHING // Polishing on wood work with ready mixed wax polish of approved brand and manufacture : // New work

-

-

96

... More
WATER SUPPLY // C.P. BRASS FITTINGS // Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved make conforming to IS:8931. // 15 mm nominal bore 18.56.1 2.00 Each 180.80 361.60 25.00 (-)271.20

-

-

25

... More
DRAINAGE // Extra for depth for manholes : // Size 90x80 cm // With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

-

-

25

... More
Supply, transportation, installation, testing & commissioning of lighting MDB consisting Incoming 1x125A MCCB and outgoing 2x63A, 4-pole MCB , 2 x40 A DP MCB & 10 x 16 A DP MCB.

1

24749

24749

... More
Supply installation, Testing & commissioning of minimum capacity 200Amp rotary type phase selector switch, 3phase, 4wire, 415 volt AC, incoming 125 amp FP MCCB & single phase 240 V two wire outgoing with 1No 125A DP MCCB in a metal enclosure. 3

1

51291

51291

... More
Supply installation, Testing & commissioning of 250A feeder pillar. 4

2

15939

31878

... More
Supply installation, Testing & commissioning of 400 A feeder pillar.

1

31327

31327

... More
Supply, transportation, installation, testing & Commissioning of SDB Switch board consisting- Incoming 2 x 63 A 4-pole MCB & Out going -10 x 16-20 A DP MCB .

5

6832

34160

... More
Supply, installation, testing & commissioning of Distribution board having incoming-32 A DP MCB and outgoing- 6 x16A SP MCB.

3

1790

5370

... More
Supply, installation, testing & commissioning of Auto control of street light Distribution board having Time switch , contactor and MCB . 8

2

5336

10672

... More
Digging of cable trench 450 x 1000 mm & refilling as per Specification. 9

2675

68

181900

... More
Digging of cable trench 450 x 1000 mm in RCC/PCC/hard soil.

535

340

181900

... More
Transportation, Laying,Installation , terminating, testing and commissioning of HT/LT cable of sizes 4x10 sqmm to 4x 300 sqmm in existing trench, pipe or on structure. 11

5350

25

133750

... More
Supply, installation, testing & Commissioning of LT /HTcable route marker. 12

61

144

8784

... More
Supply and laying of RCC half round pipe 100 mm ID & 1 mtr length. 13

1250

48

60000

... More
Supply and laying of RCC half round pipe 150 mm ID & 1 mtr length.

1425

53

75525

... More
Supply,installation, testing & commissioning of HDPE Pipe 110 mm Nominal Dia as per IS -4984-1995. 15

1080

462

498960

... More
Laying of HDPE/GI pipe by Push through Method under track/Road.

924

408

376992

... More
Supply,installation, testing & commissioning of 5mtr long hot dip galvanised octagonal poles with 130 mm bottom & 70 mm top made up of 3mm thick steel sheet along with base plate of size 200x200x12mm with foundation. 17

26

8534

221884

... More
Supply, installation, testing & commissioning of 45 system watt LEDstreet light fitting.

33

5518

182094

... More
Supply, installation, testing & commissioning of surface wiring of light, fan and call bell point with modular switch by 3 nos. 1.5 sq mm FRLS PVC insulated copper conductor multi-strand single core in PVC casing caping and accessories.

121

389

47069

... More
Supply, installation, testing & commissioning of surface wiring of plug point 6 Amps with modular switch on same board by 3 nos. 1.5 sq mm FRLS PVC insulated copper conductor multi-strand single core in PVC casing caping and accessories

20

115

2300

... More
Supply, installation, testing & commissioning of surface wiring of modular plug point 16/6 Amps with modular switch on separate board by 3 nos. 4.0 sq mm FRLS PVC insulated copper conductor multi-strand single core in PVC casing caping and accessories.

9

446

4014

... More
Supply, erection, testing & commissioning of surface wiring of sub-main from board to board and room to room with 3 nos. 2.5 sq mm FRLS PVC copper conductor, multi-strand single core in PVC casing caping and accessories.

560

63

35280

... More
Supply, erection, testing & commissioning of surface wiring of sub-main from board to board and room to room with 3 nos.4.0 sq mm FRLS PVC copper conductor, multi-strand single core in PVC casing caping and accessories.

360

91

32760

... More
Supply, erection, testing & commissioning of surface wiring of sub-main from board to board and room to room with 3 nos.6.0 sq mm FRLS PVC copper conductor, multi-strand single core in PVC casing caping and accessories.

145

144

20880

... More
Supply, erection, testing & commissioning of wiring of 2 way light point with modular switch by 4 nos. 1.5 sq mm FRLS PVC copper conductor, multi-strand single core in PVC conduit pipe/ casing caping.

30

615

18450

... More
Supply and providing musical call bell.

2

254

508

... More
Supply,installation, testing and commissioning of ceiling fans including hooks, clamps, nuts & bolts etc.

26

1683

43758

... More
Supply, fixing, testing & commissioning of serface type modular electronic fan regulator.

18

419

7542

... More
Supply, installation, testing & commissioning of 10/20 W LED bulk head fitting with 230 Volt AC operated.

9

1245

11205

... More
Supply, installation, testing and commissioning of Concealed wiring of light, fan and call bell point with Modular switch by 3 nos. 1.5 sq mm FRLS PVC insulated copper conductor multi-strand single core in PVC conduit pipe & Conduit pipe accessories.

30

473

14190

... More
Supply, installation, testing and commissioning of Concealed wiring of plug point 6 Amps3 pin with Modular switch on same board by 3 nos. 1.5 sq mm FRLS PVC insulated copper conductor multi-strand single core in PVC conduit pipe & Conduit pipe accessories .

6

264

1584

... More
Supply, erection, testing & commissioning of Concealed wiring of plug point 16 Amps 6 pin with Modular switch by 3 nos. 4.0 sq mm FRLS PVC insulated copper conductor multi-strand single core in PVC conduit pipe & Conduit pipe accessories.

3

548

1644

... More
Supply, erection, testing & commissioning of concealed wiring with 3 nos. 2.5 sq mm sub-main FRLS PVC copper conductor, multi-strand single core in PVC conduit pipe.

200

84

16800

... More
Supply, installation, testing and commissioning of concealed wiring of sub-main with 3 nos. 4.0 sq mm FRLS PVC copper conductor, multi-strand single core in PVC conduit pipe.

150

112

16800

... More
Supply, erection, testing & commissioning of concealed wiring of sub-main from board to board and room to room with 3 nos.6.0 sq mm FRLS PVC copper conductor, multi-strand single core in PVC casing caping and accessories.

30

128

3840

... More
Supply, erection, testing & commissioning of concealed wiring of sub-main from board to board and room to room with 5 nos.10.0 sq mm FRLS PVC copper conductor, multi-strand single core in PVC conduit pipe.

20

282

5640

... More
Supply, installation, testing and commissioning of concealed 100W modular fan regulator.

18

419

7542

... More
Supply, installation, testing and commissioning of exhaust fan complete with all accessories. 38

5

1573

7865

... More
Supply, installation, testing & commissioning of 1x (18-20) W LED tube fittings .

74

1233

91242

... More
Supply and providing recess mounted LED Fitting- (36@45&41@ W , 2x2 sq ft with flexible, 3-core, multistrand copper conductor, PVC insulated & sheathed wire of required size.

10

3835

38350

... More
Supply, installation, testing & commissioning of Corrosion proof LED fitting (Capsule type fitting) suspended, surface type-2 x (18 to 20)W LED tube fittings .

17

3811

64787

... More
Supply, installation, testing and commissioning of 3 nos.4.0 sq mm FRLS PVC copper conductor, multi-strand single core in PVC casing caping/ PVC conduit and accessories for Cover shed wiring. 42

280

112

31360

... More
Supply,installation, testing & commissioning of Pipe earthing. 43

50

2486

124300

... More
Supply,installation, testing & commissioning of 8 SWG G.I. earth Wire. 44

1640

17

27880

... More
Supply and providing 50 mm dia UPVC Pipe.

114

155

17670

... More
Supply, installation, testing and commissioning of LED glow sign board hanged/ fixed with the help of 25x3 mm M.S. angle.

-

-

45

... More
Excavation of all kind of soil (except Rock) and filling back the excavated earth as per Specification.

220

124

27280

... More
Excavation of Hard soil (Stone/Rock/RCC) and filling back the excavated earth as per Specification.

110

807

88770

... More
Supply, installation, testing and commissioning of new 2 KVA, ON Line, UPS suitable for 120-minute backup with battery as per RDSO specifications No. RDSO/PE/SPEC/PS/0023- (Rev.0) 2001 with Amendment No.1 or latest

1

77100

77100

... More
Supply, installation, testing & commissioning of Automatic Change Over Panel 40A with 3 incoming supply & one out going supply with enclosure.

1

37475

37475

... More
Supply installation testing & commissioning of 1.5 tonne Split type A.C, 5 star energy rating , invertor type as per technical specification enclosed.

3

44792

134376

... More
Supply, erection, testing & commissioning of surface wiring of plug point with 20 A DP MCB, plug socket & top in enclosure.

3

907

2721

... More
Supply installation testing & commissioning of three phase auto controller with time switch and smart logic features timer with temperature based load for 3 Nos Air conditioner as per Tech specification.

1

30073

30073

... More
Providing temporary lighting arrangment during night working and TWO by portable type 2 to 5 KVA DG Set on hiring basis comlete with fuel,oil, acessories . all Manmaterial and transportation.

240

366

87840

... More
Supply, installation, testing and commissioning of LED light name boards having Station Names in English, Hindi and Gujarati Languages for total 3 boards each station as per specifications.

1

87151

87151

... More
Supply and providing outdoor type cable termination box heat shrinkable for 3x 185sqmm HT cable. 56

20

12853

257060

... More
Dismantling & stacking of Rail /Tubular pole with removal of O/H lines

12

566

6792

... More
Supply, installation, testing and commissioning of 5 HP, three phase vertical submersible pump sets. 58

1

19943

19943

... More
Supply of 5 HP, three phase vertical submersible pump sets (Spare)

1

18741

18741

... More
Supply, installation, testing and commissioning of control panel for 5 HP, three phase submersible pump . 60

1

5447

5447

... More
Supply and providing 50 mm dia. UPVC Column pipe. 61

300

529

158700

... More
Supply and providing 3 core, 4 sqmm copper flat cable suitable for submersible pump.

300

92

27600

... More
Supply, installation, testing & commissioning of submersible Horizontal mono block pump to be installed in sump suitable for 415 V three phase supply & 5.0 HP.

1

19943

19943

... More
Supply of submersible Horizontal mono block pump to be installed in sump suitable for 415 V three phase supply & 5.0 HP (As spare).

1

18741

18741

... More
Supply, installation, testing and commissioning of control panel for 5.0 HP mono-block submersible pump.

1

5447

5447

... More
Supply and providing 50 mm dia.UPVC Column pipe. 66

5

529

2645

... More
Supply and providing 3 core, 4sqmm copper flat cable suitable for submersible pump.

10

92

920

... More
Supply, installation, testing & commissioning of submersible mono block pump with starter to be installed in sump suitable for 240V single phase supply & 2.0 HP.

1

12154

12154

... More
Supply, installation, testing & commissioning of Straight through Jointing Kit of size 4x 95-120 Sq mm

4

4968

19872

... More
Supply, installation, testing & commissioning of Straight through Jointing Kit of size 4x50-70 Sq mm 70

4

4640

18560

... More
Supply, installation, testing & commissioning of 32A DP switch with NEON indication. 71

1

152

152

... More
Preparation of Design, Drawing, line diagram etc.

1

5255

5255

... More
Concrete for foundation and plinth in all type of soil incl. hard/rocky soil (incl. excavation and supply of all materials viz., sand, cement, and ballast etc.) 2

3740

5948

22245520

... More
Reinforced Concrete for foundation and cable trench 3

36

8948

322128

... More
Reinforced Concrete for cable trench cover 4

40

2142

85680

... More
Construction of RCC brick baffle wall complete with Plastering 5

40

4875

195000

... More
Supply, spreading and levelling of 20mm down graded ballast, pedding 150mm

60

1444

86640

... More
Supply of rolled or fabricated and galvanized traction mast, TTC, Portal with boom and AT masts, Feeder mast etc.

455

108415

49328825

... More
Supply of fabricated and galvanized steel works other than traction mast, TTC, portals etc. (SPS)

37

109035

4034295

... More
Supply of single cantilever assembly complete with insulator for conventional OHE and inside the tunnel 9

688

20627

14191376

... More
Supply of pull-off arrangement for OHE 10

7

10590

74130

... More
Supply of guy rod assembly 11

115

8507

978305

... More
Supply of all types of GI bonds (40 X 6 mm) 12

1150

1058

1216700

... More
Supply of Earth electrode 13

41

4175

171175

... More
Supply of GI flat for earth (50 X 6 mm) 14

1300

188

244400

... More
Supply of Fencing upright 15

6

67725

406350

... More
Supply of fencing panel as per RDSO approved drawing

60

2738

164280

... More
Supply, instalation , testing and comissioning of material i.e ThreePulley, SS rope and Tie rods etc for modification inregulating equipment (ATD) for 2400kgf Tension as per RDSO specification no.TI/SPC/OHE/ 3PHTAD/0150with latest ACS

-

-

16

... More
Supply of regulatingequipment (3 pulley type) with counter weight assembly for conventionalOHE (regulated) 2400kgf tension 18

58

60946

3534868

... More
Supply of 20mm diagalvanized steel conductor asper RDSO drg. 19

25

26211

655275

... More
Supply of earth screen wires 20

220

280

61600

... More
Supply of 50 mm GI pipe N.B. 21

40

387

15504.4

... More
Supply of MS, C class column pipe 22

40

551

22046.4

... More
Supply of anti monkey climbing device arrangement 23

161

2996

482356

... More
Supply of 2 x 25 KV double pole isolator with interlocking mechanism. 24

31

131887

4088497

... More
Supply of 2 x 25KV single pole isolator without earth contact assembly 25

5

79206

396030

... More
Supply of PTFE short Neutral section

1

966045

966045

... More
Supply of materials for termination of double conductor (including supply of 9 t cut-in insulator) of overhead equipment. 27

92

11303

1039876

... More
Supply of materials for termination of single conductor with 9 t cut-in insulator 28

92

6718

618056

... More
Supply of section insulator assembly including core and cut-in insulator 29

3

50580

151740

... More
Supply of 25KV solid core cut-in insulator 30

50

8255

412750

... More
Supply of 25KV solid core suspension insulator 31

560

8726

4886560

... More
Supply of 25KV post insulator 32

40

8240

329600

... More
Supply of 10 KVA Change over panel as per RDSO spec. suitable for 10 KVA AT supply 33

3

31412

94236

... More
Supply of PT Type-I

4

75401

301604

... More
Supply of Auxiliary Transformer 25 kV/230 V, 10 KVA with DO fuse assembly, LV box & Anti climbing device

5

84904

424520

... More
Supply of Auxiliary Transformer 25 kV/230 V, 5 KVA with DO fuse assembly, LV box & Anti climbing device 36

5

23559

117795

... More
Supply of Lightning arrestor for 25 KV OHE. 37

7

42624

298368

... More
Supply of Station Equipments at SP/SSP as per RDSO Spec. No. TI/RCC/ SCADA/0133). 38

2

907563

1815126

... More
Supply of 50/39 mm aluminium bus bar.

155

621

96255

... More
Supply of all types of aluminium bus bar terminal assembly, splice and connectors for 50mm bus bar.

80

2296

183680

... More
"Supply of 25 KV Double pole outdoor Vacuum interrupters with spring-spring operating 40 mechanism for 2 x 25 kv AC at OHE feeding systems along with structure terminal connector all accessories etc. complete in all respect. As per RDSO Spec. No.TI/SPC/PSI/ LVCBIN/0121) (05/23) or latest. Note-Following to be supplied with each interrupter. (1) Integral lock-2 No. spare in each interrupter. (2) Terminal pad aluminium(10mm x 20mm) - 4 No. spare in each interrupter Total 8 Nos. (3) Butterfly connector in place of 50 mm busbar connector.Material to supply by RDSO approved source only."

5

1038400

5192000

... More
"Supply of 25 KV Double pole outdoor Vacuum Circuit Breaker as per RDSO Spec. NoTI/SPC/PSI/ LVCBIN/0121) (05/23) or latest with spring-spring operating mechanism terminal connector and supporting structure suitable for 2 x 25 KV, A/C OHE System." 42

2

1121236

2242472

... More
Supply of All Aluminiumspider conductor of size 234 Sq.mm. as per explanatorynote

30300

147

4454100

... More
Supply of 12.24 mm dia ACSR Raccoon with mastfitting as per RDSO Drg. No.TI/DRG/OHE/ERBOND/RDSO/ 00001/ 11/0

30

50325

1509750

... More
"Supply of 50 KV Double Pole SF6 Circuit Breaker/ Vacuum Circuit Breaker as per RDSO Spec. No.TI/SPC/PSI/ LVCBIN/0121) (05/23) or latest with spring-spring operating mechanism terminal connector and supporting structure suitable for 2 x 25 KV, A/C OHE System."

1

1400000

1400000

... More
Supply of overhead equipment excluding catenary & contact wire. Scope includes supply of number plates & various types of caution & other boards including shock treatment chart etc. 46

-

-

45

... More
Supply of Catenary wire splice Over & above as required for item D1 47

12

450

5400

... More
Supply of Contact wire splice over & above as required for item D1

12

1156

13872

... More
Supply of 10 x 2.5 Sq.mm PVC insulated stranded copper cable for control and indication of interruptors. 49

380

165

62700

... More
Supply of 2x2.5 Sq.mm PVC insulated stranded copper cable for catenary indication. 50

380

50

19000

... More
Supply of 2x4 Sq.mm PVC insulated stranded copper cable for heater supply. 51

380

57

21660

... More
Supply of copper strip for earthing (25mm x 3mm) 52

20

644

12880

... More
Supply of Solid copper busbar 18mm 53

25

1191

29775

... More
Supply of solid copper bus bar terminals 54

15

2729

40935

... More
Supply of solid copper bus bar connectors bus splice

15

41

615

... More
Preparation all drawing and design for overhead equipment including preparation of pre pegging, pegging and OHE layout plan 56

-

-

55

... More
Preparation of design and drawing of switching stations

2

48491

96982

... More
Erection of rolled or fabricated and galvanized traction mast and auxiliary transformer masts, TTC and portals 58

455

6786

3087630

... More
Erection of fabricated and galvanized steel works other than traction mast (SPS)

37

6669

246753

... More
Erection of single cantilever assembly complete with insulator for conventional OHE and inside the tunnel 60

688

1626

1118688

... More
Erection of pull-off arrangement for OHE

7

1237

8659

... More
Erection of guy rod assembly 62

-

-

61

... More
Erection of all types of bonds 63

1150

266

305900

... More
Erection of Earth electrode 64

41

1513

62033

... More
Erection of GI flat for earth (50mmx6mm) laid in ground/exposed 65

1300

64

83200

... More
Erection of Fencing upright 66

6

6835

41010

... More
Erection of fencing panel

60

167

10020

... More
Erection, testing and commissioning of 8/12.3 MVA, 54 kV/27 kV, 50 Hz Auto Transformer with bushing CT, Oil filtration and completein all respect as per latest RDSO specification suitable for 2x25 kV AT feeding system.

2

102960

205920

... More
Erection, testing and commissioning of 25 kV double pole out door vacume interrupter for 2x 25 kV AT feeding system.

5

42405

212025

... More
Erection, testing and commissioning of 25 kV double pole Spring spring mechanism out door VCB for 2x 25 kVAT feeding system.

2

42355

84710

... More
"Erection, testing and commissioning of 50 KV Double Pole SF6 Circuit Breaker/ Vacuum 70 Circuit Breaker as per RDSO Spec. No.TI/SPC/PSI/ LVCBIN/0121) (05/23) or latest with spring-spring operating mechanism terminal connector and supporting structure suitable for 2 x 25 KV, A/C OHE System."

1

79824

79824

... More
Erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE (regulated) 2400kgf tension 72

58

8553

496074

... More
Erection of 20mm dia galvanized steel conductor asper RDSO drg. 73

25

1311

32775

... More
Supply and erection of Tee connector for BEC end and lug for connection 74

30

1330

39900

... More
Erection of GI earth screen wires 75

220

14

3212

... More
E, T & C of 50 mm GI pipe N.B. 76

40

14

570.4

... More
E, T & C of RCC pipe NP-4 & 150 mm 77

40

65

2614

... More
Erection of 25 KV double pole isolator with interlocking mechanism 78

31

9181

284611

... More
Erection of 25KV single pole isolator without earth contact assembly 79

5

4568

22840

... More
Erection PTFE Short Neutral section

1

6702

6702

... More
Erection of materials for termination of Single/double conductor (including supply of cut-in insulator) of overhead equipment. 81

92

1435

132020

... More
Erection of anti-creep with 9T insulator over & above as incl. in E34 82

92

3886

357512

... More
Erection of section insulator assembly including core and cut-in insulator 83

3

5947

17841

... More
Erection 25KV solid core cut-in insulator

50

908

45400

... More
Erection of 25KV solid core suspension insulator 85

560

1063

595280

... More
Erection of 25KV Post/Support insulator 86

40

849

33960

... More
Erection of 10 KVA Change over panel as per RDSO spec. suitable for 10 KVA AT supply 87

3

3109

9327

... More
Erection of PT Type-I

4

2580

10320

... More
Erection & commissioning of auxiliary transformer 5 KVA & 10KVA including DO fuse assembly, LV box & anti climbing device 89

10

6186

61860

... More
Erection of Lightning arrestor 42 KV

7

1395

9765

... More
Erection, testing & commissioning of Station Equipments at SP/SSP as per RDSO Spec. No. TI/SPC/ RCC/ SCADA/ 0133.

2

57100

114200

... More
Erection of overhead equipment, including catenary, contact, jumper and dropper wires, fixing of number plates & various type of boards

-

-

91

... More
Transportation & laying of 10X2.5/2X2.5/2X4 Sq.mm PVC insulated stranded copper cable for control and indication

1140

15

17100

... More
Transportation & laying of 2x70-150 Sq.mm PVC insulated stranded aluminium cable from AT to DB 94

4600

48

220800

... More
Erection of copper strip for earthing. (25 x 3mm) 95

20

23

460

... More
Erection of 150 sqmm copper feeder wire. 96

500

33

16500

... More
Erection of 50/39mm aluminium bus bar.

155

206

31930

... More
Erection of all types of aluminium bus bar terminal assembly, splice and connectors for 50mm bus bar. 98

80

73

5840

... More
Erection of All Aluminium spider conductor of size 234Sq.mm. as per explanatorynote.

30300

15

454500

... More
Erection of 12.24 mm diaACSR Raccoon with mastfitting as per RDSO Drg. No.TI/DRG/OHE/ERBOND/RDSO/ 00001/ 11/0 100

30

2516

75480

... More
Erection of Solid copper busbar 18mm 101

25

92

2300

... More
Erection of solid copper bus bar terminals 102

15

41

615

... More
Erection of solid copper bus bar connectors bus splice 103

15

41

615

... More
Erection of anti monkey climbing device arrangement 104

161

558

89838

... More
Transfer of OHE from one support to another and adjustment of droppers 105

182

4763

866866

... More
Providing (Supply with erection) of anticlimbing device for SSP/SP

300

281

84300

... More
Dismantling & removal of OHE complete with cantelever, droppers, contact & catenary wire etc. 107

8

36873

294984

... More
Dismantling & removal of Auxiliary transformer with DO fuse

2

4112

8224

... More
Dismantling & removal of Isolator complete 109

10

3435

34350

... More
Dismantling & removal of Mast, portal, TTC & other small part steel 110

92

6937

638204

... More
Breaking of concrete foundation of Masts, portals & TTC 111

181

2654

480374

... More
Dismantling & removal of Guy rod assembly 112

20

1277

25540

... More
Providing (Supply & erection) of layout board for switching posts 113

2

3547

7094

... More
Providing (Supply & erection) of Sectioning diagram board at stations

5

10154

50770

... More
Provision of digging of trench 300mm deep and refilling inall soil and repair of PF areaas per explanatory note. 115

30

43537

1306110

... More
Supply & erection of fire fighting equipment 116

4

4804

19216

... More
Supply of First aid Box with Strecher etc.

2

989

1978

... More
Drilling of horizontal bore below track by pushing method for laying of HDDE pipe of various size upto 450 mm dia.

69

3513

242397

... More
Transportation of Railway supply materials from Railways depots to work site OR Transportation of Released material from work site to Railway depot.

114

5020

572280

... More
Work under Power Block:Any erection work as per schedule done under power and /or Traffic block is subject to have extra rate @ 30%. 120

1

3862702

3862702

... More
Technical Assistant (Unit of this item is "Per Man Month") 121

24

52786

1266864

... More
Pull lift machine 3 tonne pulling capacity and 3 tonne lifting capacity Make Tracel Tirfer India Pvt Ltd or similar

1

28011

28011

... More
Pull lift machine 5.2 tonne pulling capacity and 3.2 tonne lifting capacity Make Tracel Tirfer India Pvt Ltd or similar

1

27781

27781

... More
Pull lift machine 1.5 tonne pulling capacity and 2 tonne lifting capacity Make Tracel Tirfer India Pvt Ltd or similar 125

1

17127

17127

... More
Earthing discharge rod complete. 126

1

11503

11503

... More
Aluminium straight ladder (9.3 m) with hook on top. 127

1

15924

15924

... More
Aluminium folding ladder (11 m) with hook on top.

1

47709

47709

... More
Portable electric drill machine21mm, single phase 230 Volt ( for drilling rails for bonding). 129

1

7792

7792

... More
Contact wire cutter 36". 130

1

6042

6042

... More
Dropper wire cutter 12". 131

1

5275

5275

... More
Single sleeve pully block 3 1/2" x 1/2" groove steel. 132

1

8272

8272

... More
Contact wire twist cum bender 6"

1

1993

1993

... More
Steel sling 2m long, eye at each end 19 mm dia. 135

1

1177

1177

... More
Steel sling 3m long, eye at each end 19 mm dia. 136

1

1384

1384

... More
Steel sling 4m long, eye at each end 19 mm dia. 137

1

1738

1738

... More
Steel sling 5m long, eye at each end 19 mm dia. 138

1

5145

5145

... More
Fabric metric tape 30 mtr long 15 mm wide each. 139

1

927

927

... More
Engineering ratchet with socket set 140

1

5393

5393

... More
Earth Megger/tester 141

1

7757

7757

... More
Screw driver set consisting of 6", 8", !2", 16" & 18" 142

1

1879

1879

... More
Insulated cutting plier (12") & (8") 143

1

648

648

... More
Sprit level (12") & (6") 144

1

7301

7301

... More
Tensometer IDT-10 Ton capacity. 145

1

23973

23973

... More
Hydraulic criming tool. 146

1

20379

20379

... More
Bench grinder (Double end pedeswtal) Motor driven. 147

1

42666

42666

... More
50W LED flood light IP65 rating 148

1

2183

2183

... More
Syren covering distance one kilometer (Electric). 149

1

9104

9104

... More
High Beam (Range 1 km) rechargeable 15W LED torch 150

1

4376

4376

... More
D' Spanner double ended 24 sizes in a set of 12 pieces Gedore make or equivalent

1

2217

2217

... More
Ring spanner double ended 24 sizes in a set of 12 pieces Gedore make or any other substantially equipment make. 152

1

5086

5086

... More
Portable fire extinguisher capacity 4.5 Kg DCP type.

1

4796

4796

... More
Digital Multi Meter, 6000 count backlit digital display,True RMS reading on AC mode, 1000 V DC / 750 V AC ranges,10 A AC / DC ranges,Resistance, frequency and capacitance ranges,CAT IV 600 V as per specification.Megger- AVO410

1

41685

41685

... More
Earth Leackage Clamp meter, DC and AC current and voltage,600 A and 600V 154 Resistance and continuity, 312 digit, 4000 count display with backlight,High resolution digital bargraph,Peak, min/max and data-hold functions,SafetyOvervoltage safety category: IEC 61010-1 600V CAT III,Weight 225 g including batteries,having drop-tested to 1.2 m onto a hard floor as per specification. Megger -DCM305E Chouvin Arnoux

1

76957

76957

... More
"Digital Tong tester, AC/DC,DC and AC current up to 1500 A, True RMS measurement for 155 greater accuracy,Large jaw size safely assists with uninsulated conductor measurements,750 VAC and 1000 VDC,Resistance, continuity and frequency,Peak, min/max and data-hold functions,EN61326-1 & IEC61010-1 CAT IV 600 V For use on uninsulated conductors Megger-DCM1500 & Chouvin Arnoux"

1

86176

86176

... More
"CT & PT Analyser, testing ability PT and CT& CT Kneepoints up to 30kV,CT grouped testing includes Demagnetization,Knee Points, Ratios, Saturation Curves, Winding Resistances, 156 Polarities and Phase Deviation (on all taps of multi-ratio CTs),VT testing including Demagnetization, Ratio, Winding Resistance, Polarity and Phase Deviation,Integrated 1 kV DC insulation test system,Automatic testing according to ANSI C57.13; IEC 60044-1; IEC 60044-6; or IEC 61869-2 on Relaying/Protection Class CTs., andIEC 61869-3 on Inductive Voltage Transformers should Excellent noise immunity from energized power lines in substations, Test Current on Load: 1mA at min. pass values of insulation (as specified in BS7671, HD 384 and IEC 364) as per specification.along with Laptop Megger -MVCT "

1

5809300

5809300

... More
THERMAL IMAGER HAND HELD 250 Deg suitable for substation & OHE aplications measurment up to 15 meter distance.Chouvin Arnoux CA1954, Fluke

1

1500000

1500000

... More
"Circuit Breaker Analyser, along with Linear & Rotary Transducer,Suitable for testing 158 timing and travel on all circuit breakers with single interrupter per phase,Two separate timing channels for measurement of auxiliary contacts,Analog measurement channels for travel transducers or general voltage/current measurements,EMC 2004/108/EC, LVD 2006/95/EC Megger- EGIL"

1

2964840

2964840

... More
Insulation Tester 2.5 KV with PI Measurment,selectable Voltage 50V to 2,500V, Resistance Range- 200G ohm,Equipment should Weatherproof IP54,Tough housing along with rechargable Battery,CAT IV 600 V applications,IEC61010 and EN61557 Megger- MIT 2500

1

248986

248986

... More
Phase sequence Indicator,LED clockwise and counter clockwise phase rotation indication,Audible indication of direction,Volatge Range up to 500V for Frequency of 50 HZ,The instrument complies with IEC61010 CAT IV 600 V,As per specification.

1

30015

30015

... More
Cable Fault locator Portable Identification & Route tracer,DC testing up to 40 kV, 161 surging/thumping up to 32 kV, burning up to 40 kV,Prelocation methods: Inductive ARM with Multishot, ICE and DECAY,urge/Thump energy 2,000 Joule,Full TDR control of all HV functions,With IP 54,along with Shock wave receiver for acoustic and electromagnetic fault location & Cable route tracer to detect up to 6 meter depth as per specification.Make -Megger

1

9770370

9770370

... More
"Helmets Class E - Electrical Hard Hat - White should comfort in mind and features multiple adjustment points for a personalized comfortable fit. Compliance withANSI Z89.1-2014 Type 1, Class E CSA Z 94.12015 Type 1, Class E"

10

4950

49500

... More
Insulating Rubber Mats - 33 KV , Type "C",• Bicolor Mat: The two colors and two layers of the mat serve the purpose of mechanical damage indication and give hint to replace the mat when 163 color change is visible on the surface, should Certified by IS 15652:2006: Ensures the minimum regulatory requirements .Quality assurance: Tested by the any reputed laboratory.Thickness: 3.0 mm, Working Voltage: 33 KV AC Proof Voltage: 36 KV, Dielectric Strength: 65 KV per squre meter as per specification Make Raychem 164

10

6450

64500

... More
Tools Box Universal for substation as per specification Stanlly

2

95127

190254

... More
Miniature, Plug-in Type, DC Neutral Line AC Immunized Relay, Style QNA1, 24 V DC, 8F- 8B/12F-4BContact, Code ABDGH/ABDFH Spec: BRS: 931A; IRS S 34; IRS S 23; IRS S@10<45@78

75

6444

483300

... More
Key Lock Relay working on 24V DC, AC immunize with different ward combinations (Three ward plates to be supplied with each relay). Key ward shall be specified by engineer incharge as per requirement

38

9733

369854

... More
Relay racks assembly complete with scaffolding bus bars, fuse strips, fuses, resistors, 3 capacitors, insulators, grouting bolts, tripods etc. as per Drg. No. CSTE /6028 .[Scaffolding should include 20% extra (with minimum of 2 relay rack positions) as spare for future expansion]. Relay rack shall be Powder Coated. (Quantity of Resistance, capacitor & Other items as Annexure.

18

27067

487206

... More
Cable termination racks as per Drg. no. CSTE 5004, 5005, 5006 complete along with fitting arrangements and also with arrangement for fixing four 8-way terminal strips/ Screw less terminals on each row having 16 such rows. Supply of 8 way terminal strips/ Screw less terminals not covered under this item. Cable termination rack shall be Powder Coated.

-

-

4

... More
PVC insulated Railway Signalling multi-core Indoor Cable 60core x 0.6mm Dia conforming to IRS:76/89 (Amd3) or latest

1

152409

152409

... More
PVC insulated Railway Signaling multi-core Indoor Cable 1 mm x 40 mm x 0.6mm Dia conforming toIRS:76/89(Amd3) or latest.

1

100669

100669

... More
PVC insulated Railway Signaling multi-core Indoor Cable 1mm x 24 mm x 1 mm Dia conforming to IRS:76/89(Amd3) or latest.

2

167295

334590

... More
Single core multi-strand wire 0.5 sq.mm. (16 conductor each dia. 0.2mm), as per IRS 76/89 (Amd3) or latest.

1

5569

5569

... More
Flexible cable (Power wire), multi-strand copper conductors cross section 1x6 Sq.mm.( 85 conductor each diameter 0.30 +/- 0.01) as per IS 694/1990 with insulation thickness of 0.80 mm nominal conductor resistance 3.30 ohms/km and test parameters are as per IRS(S)76/89 or latest.

1

40222

40222

... More
Flexible cable (Power wire), multi-strand copper conductors cross section 10 (1x16Sq.mm).101 Conductors each diameter 0.45 +/- 0.01 as per IS 694/2010 with insulation thickness of 1.2mm nominal conductor resistance 1.127 Ohms/Km and test parameters as per IRS(S) 76/89 or latest.

1

118721

118721

... More
Disconnect Terminal Block, Screw less type, as per RDSO Spec. No. RDSO/SPN/189/2004. With the latest amendments

-

-

252100

... More
Earth Leakage Detector as per RDSO/SPN/256/2002 or latest with latest amendments. 12 The basic detector unit shall comprise of 12 channels, for use on signaling circuits of 110V AC/DC and/or 60V/24V/12V DC as ordered by purchaser. If the detector is required for less number of channels, dummy plates shall be provided. For additional requirement add on /expendable cabinet may be used. The voltage specified shall be provided with + 25% and - 10% tolerance.

10

155843

1558430

... More
Fuse auto changeover system for use in Railway Signaling System as per RDSO/SPN/209/2012 rev.1 with latest amendments. One Automatic changeover Unit comprises 32 nos. of external Non-Deteriorating Type or 'G' type fuses from 0.6 Amp to 4 Amp capacities which are in signaling circuits. The system shall have 8 cards with a monitoring arrangement of 4 fuses in one card

4

119380

119380

... More
Fuse auto changeover system for use in Railway Signaling System as per RDSO/SPN/209/2012 rev.1 with latest amendments. One Automatic changeover Unit comprises 24 nos. of external Non-Deteriorating Type or 'G' type fuses from 4 Amp to 10 Amp capacities which are in signaling circuits. The system shall have 6 cards with a monitoring arrangement of 4 fuses in one card

2

101792

101792

... More
Cartridge fuse block made of PBT as per RDSO Drg No SA- 23748 Alt 4 & Spec No IRS S 15 75/2006 with the latest amendment. The fuse block shall be suitable for round-head type voltage fuses. This also includes the supply of equivalent no of ND type Fuses of 2A capacity as per specification IRS S-78/92. 16

200

143

28600

... More
PPTC fuse 12V GP 16-400 (2A) for TF/TR circuit, make Raychem, Epcos, Siemens. 17

200

11

2200

... More
PPTC fuse 24V GP 30-110 (1.4A) for Q series Relay (TPR) 18

200

11

2200

... More
PPTC fuse 110V AC for Track Charger GP 250-185 (1.4A)

200

11

2200

... More
ARA Terminal blocks with links made of PBT Spec No.s/75/2006 (Rev - 2) with latest amendments and RDSO Drg.No.SA-23741A Alt.4.

2600

89

231400

... More
Colour Light Signal Complete. This includes: - (1). Post Tubular 140 mm Dia, as per IRS: 20 S-6/81 or Latest & RDSO Drg. No. SA-24625 (Advance). (2). CI Base (As per IRS S-10 & RDSO Drg. No. 2011/M with latest assembly). (3). Pinnacle. (4). Ladder Assembly, as per RDSO Drg. No. SA-23156, with Base, Ladder Guards, Platform, Front Maintenance Platform, MS Supporting bracket to Support Ladder. (5). Signal Front Staging Complete Assembly for CLS Unit. (6). Signal back staging as per extent WR Practice Note: Height of the Post shall be 4.6 m Long.

50

10863

543150

... More
Non Metallic (FRP) color light signal housing multi-unit type for railway signaling 21 suitable for RE area TWO Aspects. Complete without lenses, lamps and signal transformer as per RDSO DRG. No. SA 23001/A/M Adv. Alt- S and as per SPEC. No. RDSO/SPN/194/2006 (Vol. 1.0) or latest and FRP material as per RDSO SPEC. No. RDSO/SPN/151/1997 or latest.

20

26540

530800

... More
Non Metallic (FRP) color light signal housing multi-unit type for railway signaling 22 suitable for RE area THREE Aspects. Complete without lenses, lamps and signal transformer as per RDSO DRG. No. SA 23001/A/M Adv. Alt- S and as per SPEC. No. RDSO/SPN/194/2006 (Vol.1.0) or latest and FRP material as per RDSO SPEC. No. RDSO/SPN/151/1997 or latest.

30

30287

908610

... More
Junction route indicator unit 1way as per Drg. No. RDSO SA 23401 suitable for LED Signal Lighting Unit & as IRS: S-66/84 amndt-1or latest. (Supply of LED Unit is not covered in this item).

3

19449

58347

... More
Junction route indicator unit 2 way as per Drg. No. RDSO SA 23402 is suitable for LED Signal Lighting Units & as IRS: S- 66/84 amndt-1 or latest.

2

19535

39070

... More
Position Light Shunt Signal Unit Complete with Post (made of GI Pipe of 80 mm 25 Diameter Medium Class IS Spec. No. IS: 1239 Pt. 1/1990) Base, Hood, and Cover, etc. as per Drg. No. SA-23840, Signal Number Plate, suitable for LED Signal Lighting Unit. (Supply of LED Unit is not covered in this item).

10

4541

45410

... More
Position Light Shunt Signal Unit Complete, with offset bracket, hood, Cover etc. as per Drg. No. SA-23840 suitable for LED Signal Lighting Unit. (Supply of LED Unit is not covered in this item).

2

3273

6546

... More
Calling ON Signal Unit with Brackets & Fixing accessories. Calling On Signal Unit shall conform to RDSO Drg no 24351(Adv.) Alt1 suitable to LED Signal Lighting Unit

5

2670

13350

... More
Offset brackets for Main Signal, made of tubular steel, outer diameter 140 mm, thickness of pipe 4.5 mm. horizontal length of pipe 545 mm & vertical length of pipe 324 mm with fixing arrangement on Main Signal post as per Drawing No SW/554/G/R

5

4422

22110

... More
Miniature, Plug in Type, M to C,DC Neutral ,Track relay, ACI, Style QTA2, 9 Ohm, 2F-1B contact, Code - FGHKX Spec : BRS :939-A & 966 (Appx-F2) & IRS : S-23, S-23,S-34 & 60.

24

4770

114480

... More
Miniature, Plug in type, M to C, AC immunized, DC biased Track Relay, 2F-2B contacts, style QBAT-9 ohms. Code ABEJX Spec:- RDSO/SPN/84 Ver. 2 : IRS -S@ 45"44@IRS-S-23, IRSS@ 45<45@ 78.

6

6318

37908

... More
Track feed battery chargers, 110V AC input, 2 to 6/10 V DC Output; as per Specn. No. IRS.S 89/ 2013 with latest amendments. Charger shall be suitable for charging 80 AH battery.

24

3985

95640

... More
Adjustable Track Feed Resistance disc type 30 ohms as per RDSO Drg. No. SA 20166/M (Adv.) with latest amendments (with Phenolic molded base)

24

1392

33408

... More
Track Lead Junction Boxes as per C.Rly Drg. No.RST 11509 made from fiber glass/SMC/FRP along with terminal blocks

120

1699

203880

... More
Low maintenance Lead acid secondary cell 2V/80 AH (Track feed Battery), shelf mounting type conforming to IRS:S- 88/2004 or latest (uncharged). 35

75

2255

169125

... More
GI wire 8 SWG (4mm Dia) suitable for track circuit rail bonding.

5

67

335

... More
Channel Pins MS (Galvanized) single groove, 7 mm suitable for 4mm Dia bonding wire as per spec No IRS S 17 & RDSO Drg No. S-69/M.

200

6

1200

... More
Choke Coil for Single Rail Track Circuit on 25 KV 50 Hz AC Electrified Section as per Spec No IRS S 65/1983 with latest amendments.

48

3813

183024

... More
Hydrometer, Exide make or similar for measuring the specific gravity of Battery Graded acid with mounting stand in location Boxes.

2

271

542

... More
Double Walled Corrugated (DWC) HDPE Pipe with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and non-flame propagating type in 6 meters straight length and of size 120 mm outer die,& 103.5 mm inner dia. . One of the 39 following coupling arrangements should also be supplied with each pipe as per the site requirement. 1) Suitable snap fit coupler with rubber 'O-Ring 2) Spacers 3) Tees 4) Bend, 5) End-cap (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vender name and year of manufacture can be easily identified. Color -Bright Orange; Min Weight = 4kg. Test Check by Consignee & Sample check by JAG officer

150

1889

283350

... More
Medium Class G.I. Pipes to IS: 1239 (Pt.)-2004 or latest; 100mm dia. (int. Dia) 3.65 mm thick or above with coupling. G.I. pipes shall have ISI mark on it and contractor should submit manufacturer's test certificate of G.I. pipes.

400

759

303600

... More
Maintenance Free Earth Electrode of length 3m, including supply of 3 bags of Earth enhancement material for earthling (10KGs /bag) for each electrode & other accessories as per Drg. No. SDO / RDSO/ E&B/001 and RDSO Spec No. RDSO / SPN/197/2008 42

190

15225

2892750

... More
Earth Electrode as per Drg. No. CSTE / 6091

90

3452

310680

... More
SS Location box made of Spl Grade SS 304 of size as per Drg. No. DRM/SG/948 dt. 26.04.2011 (Single app. Case) or latest. Manufacturer's certificate in regard to grade of stainless steel and its protection level shall be submitted at the time of supply

25

74764

1869100

... More
SS Location box made of Spl Grade SS 304 of size as per Drg. No. DRM/SG/945 dtd 03.03.2011 (Half app. Case) or latest. Manufacturer's certificate in regard to grade of stainless steel and its protection level shall be submitted at the time of supply

70

60921

4264470

... More
Pad locks Godrej make, Hardened NavTal 7 lever, 65mm Dia with common key or similar product having same feature & technical data.

60

145

8700

... More
Point insulation Complete set as per RDSO Specification IRS: S- 40/84 for Switch bracket, Split-Stretcher bar & Gauge tie plates (52 Kg/60Kg as per site requirement).

6

1376

8256

... More
Standard Tool kits, Test and Measuring instruments required for Installation, testing, commissioning & maintenance of HASSDAC. Kit will includes all tools & measuring instruments as per ANNEXURE (Annexure shall be attached with CA). (Annexure shall be attached with CA) 48

1

115640

115640

... More
Rubber Mat for Power Equipment room. (5mm thick)

30

121

3648.9

... More
Indicative type Fuse base/ holder with cap, suitable to G type fuse of capacity 0.63A - 3.0A. 50

90

56

5040

... More
Indicative type Fuse suitable to G type fuse link of capacity 0.63 A - 3.0 A

90

19

1710

... More
Universal AC ECR of Q series, type "QECX61" suitable for AC LED all signal aspect, Front & back contact Metal to Carbon type complete with plug board retaining clip & connectors conforming to Spec STS/E/Relays/AC Lit LED Signal/09/2002, BRS: 941A, IRS: S34 and IRS: S23 (as applicable). 52

160

5674

907840

... More
Time Element Relay (Clockwork type) AG timer Siemens Make (No RSSK 30/0052)

16

6395

102320

... More
Miniature, Plug-in Type, DC Neutral Line, Non AC Immunized Relay, Style QN1, 24 V DC, 8F-8B/12F- 4BContact, Code ABCDF/ABCDE Spec: BRS: 930; IRS S 34; IRS S 23.

120

4159

499080

... More
Supply Polyolefin cable channel of size width 240/340 mm, height 155/230 internal/external, length 1meter produced of polyolefin with fire protection class K-1 in accordance with DIN 53438 Part-II for laying signaling/telecom cables, channel attachable to each other with male female swallow tail connectors and having a suitable detachable cover, as per RDSO STS/E/cable laying Precise Vol-IV and as per technical specifications.

10000

1936

19360000

... More
Electrically Operated Lifting Barrier complete set suitable for 110VDC/24V DC supply 55 with hand generator back up & motorized boom locking arrangements as per RDSO Spec. SPN/208/2012 with the latest amendment. One set consisting of 02 No.s of Barriers of length 09.76 Mtr. along with Spares & tool kit mentioned in RDSO Spec. SPN/208/2012 clause 10.1 & 10.2. 56

4

488187

1952748

... More
Road warning Flasher kit for LC gate as per circuit design

16

1759

28144

... More
Dual tone bell/buzzer with flasher arrangement 25W horn, ( Make of any ISI approved firm) working voltage as per circuit design.

16

7206

115296

... More
Supply of Battery Charger self-regulating floor mounting type with 230V AC single phase input and output 24 V DC, 20A to specn. IRS-S- 86/2000 with latest amendment for Axle counter application. (Amdt. 4).

16

33312

532992

... More
Supply of Remote Terminal Unit (RTU) with 128 digital input &16 analog input as per 59 technical specification IRS: S-99 2006(Amdt-3) or latest. In addition RTU should have dual leased line modem. It should possible to connect RTU up to 12 Kms from main data logger. This includes rack for installation &Battery backup for 06 hrs.(Inspection by RDSO)

8

199706

1597650.64

... More
Program switches, snap action, base mounting type along with acrylic cover and mounting bracket, 63A, 9 poles, and 3 positions make Siemens / Thakur or Similar.

16

12996

207936

... More
MS Sliding type mechanical Boom barrier assembly 11 to 12 Meter Long, movement drive mechanism, resetting & supporting stand suitable for Mechanical/ Electrical level crossing gate as an emergency arrangement as per Drg.

4

164636

658544

... More
Supply of in-built GNSS based cable route tracer with 10W, 500mA, 85V transmitter suitable for detecting & mapping underground cables with accuracy which can up to 3-5 cm or better, 62 with current direction up/down arrows, Remote calibration check feature. Supply shall include inbuilt RTK enabled receiver, transmitter, compatible dual Bluetooth android phone with RTK mobile application pre- installed in android device along with minimum 5 years subscription, compatible with NTRIP andRTCMv3.X messaging standards and holder & standard accessories. Make/Model: Radio detection RD8200GS or similar.

1

1387100

1387100

... More
Phenolic laminated Sheet, grade P3 in standard size of 1220 X 1220 x 10 mm as per spec. No IS 2036 of 1995 or latest. Test report of manufacture to be supplied.

50

5056

252800

... More
Phenolic laminated Sheet, grade P3 in standard size of 1220 X 1220 x 20 mm as per spec. No IS 2036 of 1995 or latest. Test report of manufacture to be supplied.

60

9320

559200

... More
Half Round RCC pipes & collars of 150 mm internal dia (1+1 meter long) along with collars as per IS No. 458/2003 of NP type

6000

319

1914000

... More
Supply of BIS listed semi automatic stainless steel fire extinguisher with UL approved 4 clean gas with auto manual reverse stainless steel valve 'NASA 200 MAR' having capacity of 02 Kgs and made of stainless steel 304 grade with Indian railways logo on each unit for camping coaches. Detailed specification attached in the annexure.ACCEPTED MAKE BRAND :NASA 200 MAR

3

27815

83445

... More
Automatic Media changeover of Modems working on redundant channels for data transmission on OFC / Quad / Microwave Radio.

4

32202

128808

... More
Modem for UFSBI (for use with secondary media OFC/Quad

4

57610

230440

... More
Supply of Modem (E1-RS232) compatible with existing UFSBI system to work on backup 7 media OFC (via unframed E1-2 mbps from STM interface).working voltage: 24 VDC(+/-20%),& operating temperature:-10 deg. C to +70 deg. C. the modem shall be compatible withUFSBI/existing block system as per RDSO Spec IRS S:105/2012 or latest.

2

23538

47076

... More
Silane siloxine Alithatic Urethane resin Blend solvent Based high technology Membrane 8 Radiant Heat reflecting insulating thermal barrier coating with a Genuine product sticker when removed display "VOID" on each container as per attached technical Specifications. Firms Offer : Same as above. make / Brand : CYPRUSS

10

5144

51440

... More
Supply of CAT-6 cable. 1 Box= 305 mtr DAX, Nortal,Amp,Molexor Lucent make with identification mark /ferrules ect..

300

19

5700

... More
Supply of one Quad VF 2T Transformer joint assembly of VF transformers 1120:470. IRS:TC 22/2021 ver1.1

8

1171

9368

... More
25 mm PVC conduit pipe with minimum 2 mm Thickness AS PER IS:9537(PART-3) OR LATESTWITH ISI making, each of length 3 meters. The material should be supplied from OEM/ Authorized dealer only

300

25

7500

... More
Low Maintenance Lead acid Stationary Secondary Cells for S&T installations 2 Volt 200 AH 13

112

36649

4104688

... More
Class 'C' type device 110V AC 14

50

2016

100800

... More
Class 'D' type device 110 V DC 15

50

4253

212650

... More
Supply of Axle counter cable conductor's Earth resistance Sensing unit.

2

34856

69712

... More
Half Round RCC pipes & collars of 300 mm internal dia (1+1 meter long) along with collars as per IS No. 458/2003 of NP type

2000

608

1216000

... More
Design and supply of cable courage plan, location particulars, Cable termination rack particulars, cable meggering report, earth resistance particulars, Traction bonding diagram, 1/2 wire count sheet and any other drawing in AutoCAD in A3/A4 size. The contractor shall initially supply 3 sets 1 of circuits complete for approval of Railways. Railways will return one set to the contractor duly approved with alterations/corrections, if any. The contractor shall incorporate Railway's alterations/corrections in the tracings without any deviation and submit all tracings complete in all respects to the Railways along with PENDRIVE & 4 sets of final approved drawings. This includes designing of cable coreage plan based upon I.P in consultation with engineer-in-charge For small/medium yards. (station) 2

3

63698

191094

... More
Design of Cable Route Plan submission of Three paper copies for approval.

3

9873

29619

... More
Installation of Relay Rack Assembly including IDF pillars if any complete with wall 3 supports, scaffolding, ladders, runway for cables, fixing of Relay / Relay group base plates, fixing of Tag blocks etc. The work shall be done as per approved plan, extant practice on WR & the instructions of Rly engineer at site.

18

10011

180198

... More
Installation of Cable Termination Racks Assembly complete including wall supports, 4 scaffolding, 8 way/ARA terminals /Screw less connectors, Tag blocks & other necessary accessories etc. The work shall be done as per approved plan, extant practice on WR & the instruction of Rly engineer at site

18

9184

165319.2

... More
Installation wiring testing and commissioning of Fuse changeover system (FACS). This includes the provision of a common Buzzer & indication at the ASM Room & ESM Duty Room and the painting of fuse details. This also includes the fabrication of a frame for the installation of FACS at the Station/ LC gate where the installation of relay racks is not feasible

-

-

5

... More
Excavation of cable trench as per cable route plan, 1 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr wide advised by Engineer-in-charge alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc., 6 covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on Western Railway and instructions of Railway Engineer at site. In case 1m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1m

5000

276

1380000

... More
Digging of trench 1.2 M deep from rail flange/ road level and, 0.3 Mtr to 0.6 Mtr wide 7 and back filling after placing of DWC/ RCC/GI pipe. (Placing of DWC/RCC/GI pipe covered separately).The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. For track crossing, Drg. No. CSTE/3644 Pg.7 of 11 and for Road Crossing, Drg. No. CSTE/3644 Pg. 5 of 11 are to be followed.

530

292

154760

... More
Horizontal direction drilling/boring without damage of surface road using Auger Machine. The bore shall be 150 mm Dia & shall be done at the depth of minimum 1200 mm from the 8 ground level. The ground level shall be considered ignoring the bank height of the bank of the road. The length of the bore shall be minimum 4 Mtr long. The HDD with or without HDPE pipe as per direction of Engineer In charge. Note: HDPE pipe supply is taken as separate item. This item also includes cable laying (HDD boring).

1000

1217

1217000

... More
Cutting of Hard rock in trenches /Preparation of cable way/Chase 150mm wide at the bottom and 300 mm deep in hard rock (Drg prepared by contactor & approved by Engineer In charge) 9 for laying of S&T cables where minimum required depth not possible & which is verified and agreed by Engineer In charge of the work or his representative shall be made as per Drg. No RE/S&T/ALD/SK/301/85. Refilling of the same with concrete mixture of 1:3:6 from top of the cable way/ chase. Payment of concrete will be made separately through a separate item in the schedule of work

150

463

69450

... More
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trucking. This also includes laying of cables in track crossings & road crossings. Item 10 includes provision of labels of colored plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each G.P.(Cables will be daggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes

200

9407

1881400

... More
Placing of DWC/RCC pipes along with collars in trenches at places of track and road crossings, platform cuttings etc. also for straight cable laying. (Cable laying is covered separately.)

-

-

11

... More
Laying and fixing of Medium class GI pipes 100 mm Dia (4.5 mm thickness) as per IS 1239 ( Part 1) 2004 or latest with coupling on culverts/bridges, perforated at a distance of 20 cm or 12 less with 10 mm Dia hole, or at any other locations as decided by Site Engineer. The GI pipe is to be filled with chattered compound. It includes supply of all material required for fi Xing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. The e laying and fi Xing to be done as per RDSO drawings No. SDO/cable laying/011 and SDO/cable laying/012, issued vide RDSO document No. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014, or latest.

600

195

117000

... More
Digging of cable pit (min2x2x1m) as per instruction of Site Engineer, supplying and filling of sand before and after coiling the cables, covering top of the cable pit with stones and providing brick masonry on all four sides of the cable pit and plastering thereafter.

2

11495

22990

... More
Supply and installation of RCC cable route marker engraved and painted on both side along the route every 50mm and route diversion as per Drg. No 4014/00/CC4 or latest/ Stone marker.

300

426

127800

... More
Termination of outdoor cables, main cables laid in location boxes, Cable termination rack etc at both ends on ARA terminal or on 8 way terminals or on screw less connectors. Both ends of a cable core terminated shall be counted as one terminal. This includes all associated works of pulling out the cable from underground, peeling off insulation, dressing of cable core supported on sting rod with contractor's own material. The work shall be done as per instructions of Rly engineer at site.

-

-

15

... More
Excavation and Casting of foundation for main signal post as per CSTE/3122 (WR) with 16 contractor's own materials including cement and anchor bolts of standard size. The required scaffolding Ferma etc. for Casting of foundation will have to be brought by the contractor at his own cost

50

8229

411450

... More
Excavation and Casting of foundation for Shunt Signal as per Drg. No. CSTE/6090 with 17 Contractor's own materials including Cement and Anchor Bolts of Standard Size. The required scaffolding, Ferma etc. for Casting of foundation will have to be brought by the Contractor at his own cost.

10

6412

64120

... More
Excavation and Casting of Apparatus Case foundation with contractor's own materials including cement and anchor bolts of standard size. The required scaffolding Ferma etc. for Casting of foundation will have to be brought by the contractor at his own cost.

-

-

551770

... More
Installation of Apparatus Cases with miniature 'E' type lock on CC foundation. This includes filling of location foundations with river bed sand and plastering on top of the sand. 'E' Type lock will be provided by Railway.

-

-

71540

... More
Fabrication and fixing of SMC sheet in location box by providing all fixtures as per 20 Railway Drawing including fixing of PVC coated string rods at the back side for cable support with contractor's own materials. The work shall be done as per Drg and arrangement similar to SK 783-1/2. With latest alterations & as per instructions of Rly engineer at site. Note: SMC sheet will be taken in place of phenolic laminated sheet.

-

-

115578.6

... More
Cement concrete work for miscellaneous items in the ratio 1: 3: 6. Item includes excavation, ramming, curing and plastering with cement & sand mixture (aggregate not exceeding 3.8 cm.) (Aggregate cement & sand to be supplied by the contractor).

31

4251

131781

... More
Providing brick masonry in ratio 1:6 cement and mortar including plastering with 1:4 22 cement and sand mixture both sides, 20 mm thick each with contractor's owned class II bricks, including excavation, curing, grouting, bolting etc. wherever required. Bricks sand and cement to be supplied by the contractor.

15

2139

32085

... More
Erection of CLS Post with base and signal unit on top or on OFF set Bracket, fixing of front and back staging, ladder and guards with contractor's own brackets and fixing materials. This also includes erection of auxiliary signals like calling on, shunt signal if any... The work shall be done as 23 per instructions of Rly engineer at site. It also includes provision & fixing of maintenance platform as per design given by Engineer -InCharge at site. It also includes supply of padlock for signal units and cable termination box. X' arms to be provided by the contractor till the signals are introduced. The Item includes cutting of Signal post if required by Site In charge. 2/3/4 aspect signal unit mounted directly on signal post.

5

3108

15540

... More
Erection of CLS Post with base and signal unit on top or on OFF set Bracket, fixing of front and back staging, ladder and guards, signal name plates / boards if any with contractor's own brackets and fixing materials. This also includes erection of auxiliary signals like calling on, shunt 24 signal if any. The work shall be done as per instructions of Rly engineer at site. It also includes provision & fixing of maintenance platform as per design given by Engineer -In-Charge at site. It also includes supply of padlock for signal units and cable termination box. X' arms to be provided by the contractor till the signals are introduced. The Item includes cutting of Signal post if required by Site In charge. 2/3/4 aspect signal unit mounted on offset bracket with junction type route indicator 1/2/3 or multilamp lamp route indicators mounted on signal post.

45

2140

96300

... More
Fixing of Calling-on Signal/A-Sign/AG-Sign unit on signal post. The item includes fixing of 25 Co- On signal /'A' sign/ 'AG' sign unit on signal post with bracket, hood etc. Item includes supply bracket & fixing materials etc. by the contactor. The item also includes termination of cables & wiring inside Co- On signal /'A' sign/'AG' sign unit as per standard practice. Note: This Item must be operated individually, Not to be operated in Installation/Erection of CLS.

5

2145

10725

... More
Erection of Position Light Shunt signal with Base, Post, and Signal unit. Wiring & Fixing of Number Plate .The work shall be done as per instructions of Rly engineer at site. 27

-

-

26

... More
Erection of Position Light shunt signal on Offset bracket on main signal

2

1882

3764

... More
Installation of DC track circuits covering points zones also. The item includes provision of continuity bonds of seven strand PVC jacketed wire/ GI wire 8 SWG on rail joints after drilling bondhole of 7.0/7.1/7.2mm Dia (double bond with sleeves and rail clips are to be provided at each rail joint), insertion of insulated block joint, fixing of Track lead Junction box on MS angle two numbers of size 40X40X5 mm 1200 mm length for track feed/ jumper / track relay ends of track CCTs (as per 28 double TLJB arrangements) and also for fixing jumper cables as per insulation diagram WR Drg No. CSTE/6055 and standard practice, making rail connections through suitable insulated sleeves from Track lead Junction box at TF, jumper & TR end with seven strand PVC jacketed wire /GI wire 8 SWG, rail clips for fixing bond wire on the TLJB as per standard practice, termination of tail cables on bootleg terminals etc. TF/TR wiring shall be fixed on the suitable arrangement on PRC sleepers with the help of hooks. Hooks shall be provided on PRC sleepers with the help of suitable steel bracket. This item also includes fixing & supply of channel pins etc. The item also includes supply of MS angles/ trestles, GI wire 8 SWG / seven strand PVC jacketed wire, hooks, rail clips etc.

24

7684

184416

... More
Fixing and wiring of DC track circuit equipments i.e. track feed charger, resistance, track relay, battery, PPTC fuses etc., in the Apparatus Case and battery box as per standard practice. Termination of tail cable on M 6 / Screw less terminals WAGO or FINOLEX or similar approved make 29 terminals/ fuse blocks / HRC fuse. Item includes testing /commissioning of track circuit. Complete wiring material (including PPTC fuses) which are not covered in Schedule will be supplied by contractor. (Supply of Track feed battery charger, track feed battery, resistances & 'B' type choke & Track relays will be supplied by Railways / covered in Schedule separately).Unit read as per track Circuit

24

6529

156696

... More
Erection, Fitting and Rail connection of Track Lead Junction Box on two supports 30 (M.S.angle) with contractor's fixing material and PVC jacketed wire for track lead connection including angles of size 40 x 40 x 5 mm 1200 mm length This will include drilling of holes for track lead/side connections on rail. The work shall be done as per Drg. No. S&T/Const./JHS/T 115 &instructions of Rly engineer at site

10

1351

13510

... More
Fixing of ARA Terminals /Screw less connectors and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry.

1000

13

13000

... More
Installation of Maintenance Free Earth Electrode for Maintenance Free Earth spec of RDSO/SPN/197/2008.

190

1475

280250

... More
Installation of Earth Electrode including MS flat for clamp etc. and connection to signalling equipments, lever frames, apparatus cases, signal, relay rack, block instrument, etc. as per technical specification given. This item includes digging of pit in earth 3 M deep & fixing earth 33 electrode pipe, casting of cement concrete enclosure & cover as per RDSO/SPN/ 197/2016.Soiltreatment to be done as per std. practice. This item includes provision of MS Flat, Earth lead wires and Soldering of lead wires. The other end of the wire is to be connected to block equipment, power equipment, cable sheath, and signals etc. as per site requirements. 7strand GI wire shall be used as earth lead wire. Supply of earth electrode is covered in other Item')

90

5579

502179.3

... More
Fabrication and fixing of 'A' Marker (Drg No. CSTE/6180), 'AG' Marker (Drg No. 34 CSTE/6181), 'P' Marker (Drg No. CSTE/6182), Arrow Marker (Drg No. CSTE/6183), 'G' Marker (Drg No. CSTE/6184), 'C' Marker (Drg No. CSTE/6185). Marker disk on signals as per standard practice All material required for this work shall be supplied by Contractor.

130

1214

157820

... More
Supply & Fixing of Stop Board, Block section limit Board, goods warning board and all other boards with contractors own material. The work shall be done as per instruction of Rly. Engineer incharge as per IRSEM.

4

5245

20980

... More
Fixing & wiring of QNA1 / QNA1K relays for GPR Circuit in apparatus case as per Standard practice. Fixing and wiring material shall be supplied by the contactor.

75

358

26850

... More
Wiring, installing of Magneto / DTMF telephone in ASM office, at locations, Relay Room, Point locations on both directions and siding Point Control locations as per instructions of Engineer lnCharge for traffic purpose.(unit read as per Tele)

-

-

37

... More
Charging of Lead Acid Batteries with contractors' own battery grade sulphuric acid and 38 distilled water with a minimum of two charge-discharge cycles, installation of charged batteries in groups & their connection & wiring. The work shall be done as per the extant practice of W.Rly & instruction of the Engineerin-charge. Detailed measurements of initial charging shall be recorded jointly by the contractor & Rly's site-in-charge. (2V 80AH)

75

378

28350

... More
Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, rain bunds if provided, platforms etc. with earth excavated from outside railway boundary entirely arranged by the contractor at his own cost as per RDSO's latest guidelines and 39 specifications and special condition of contract including all leads, royalty, lifts, ascents, descents, crossing of nallahs or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile, site clearance, removing of shrubs, roots of vegetation growth, heavy grass, benching of existing slope of old bank, all handling/re-handling. Taxes, Octroi and royalty etc. as a complete job. Cut trees shall be property of railways and to be deposited in the railway godown unless specified otherwise in the Special conditions of contract.

10

146

1460

... More
Hiring of JCB Machine (in good working condition) for leveling and dressing 40 ground/dismantling structures including disposal of debris through dumpers etc. with contractor's labour, JCB machine, machine operator, fuel, etc. The contractor shall arrange road permit for vehicle for all the states of operation, as per instructions of engineer incharge and vehicle shall not be more than three years old.

100

1109

110900

... More
Providing assistance to ESMs/TCM during monitoring Inspection & supervision of signal gears throughout the period as per of instructions of SSE (Sig) In-charge during day/night upto eight hours per day.

540

489

264060

... More
Dismantling / Releasing of existing Signaling Gears. One Signalling gear will be all parts of one signal (consisting of CLS unit, Signal post along with base) or lever frame (5 levers set), or one 42 point (consisting of all parts of a mechanical point, point machine, ground connections etc.) or one track circuits (consisting of battery box & other parts of DC Track circuit / AFTC /DAC) or one Block instruments or One Lifting Barrier or One Location Box etc. .This includes the cost of transportation of release materials to store depot or as decided by consignee in charge. This work to be done by contactors with his own vehicle and labour. (Per unit means Per Gear).

40

946

37840

... More
Dismantling of Concrete foundation/ Demolishing RCC/CC/Stone work /Cutting Tar/ 43 carpentering/ CC Flooring / Precast concrete slab/ Brick work including leading the debris inside Railway limit or outside Railway limit as directed by site in charge. This work to be done by contactors with his own vehicle and labour.

100

594

59400

... More
Shifting of existing full location boxes coming in the alignment of new line. The work includes losing & removal of soil around location boxes by excavating soil around foundation, making 44 of pit for shifting of location box horizontally opposite to railway track up to 0.5 to 1.0 mtr. This includes loosing of existing cable coils without any damage. The excavated soil shall be back filled after shifting of Location Boxes. Location box shall be shifted by push method with the help of jacks or by crane by contractors own expenditure under instructions of engineer in-charge at site. The work may affect train working hence the work shall be done as per margin only or during traffic block only.

30

3218

96540

... More
Shifting of existing half location boxes coming in the alignment of new line. The work includes losing & removal of soil around location boxes by excavating soil around foundation, making 45 of pit for shifting of location box horizontally opposite to railway This includes loosing of existing cable coils without any damage. The excavated soil shall be back filled after shifting of Location Boxes. Location box shall be shifted by push method with the help of jacks or by crane by contractors own expenditure under instructions of engineer in-charge at site. The work may affect train working hence the work shall be done as per margin only or during traffic block only.

15

2357

35355

... More
Preparation and fixing of location box board on 03 mm ACP sheet with size 12 x 18 size A3 for location box including pasting of printed/ painted vinyl sheet and lamination (printing/painting of location detail on vinyl sheet covered in schedule item separately).

150

227

34050

... More
Lettering & Numbering of detail and description writing of on relay rack, relays, cable 47 termination rack, battery &power equipments, IPS, operating panel, axle counter etc. constituting entire system with contractor's own paint and writing material. The work shall be done as per extant practice on W.R Rly & instruction of Rly engineer at site.

2

3554

7108

... More
As and when required by the Engineer in charge arranging /providing of labors for various safety related works such as protection of track etc. with contractor's T&P, equipment, hand signal flags, spanners, hammers, etc. as per specification special conditions and detailed scope of work as furnished in the tender and directed by the engineer incharge

540

613

331020

... More
Fixing of Electrical Point Machine on the extended sleepers at points as per std. practice and as per RDSO Drg No. SA 91 51- 52 or 9710 or 9161 as per section of rails used. Item includes fixing switch extension bracket, providing insulation for switch extension bracket, fixing ground connection, adjusting opening of the switches and adjusting the point machine with crank handle. The item also includes : (i) Complete material for installation like ground-connections, switch extension brackets, point insulation material, I pipes, wiring materials, various fixing nuts & bolts including castle nuts, 49 spring washers (ii) All smithy & fitting works required at site for complete installation. (iii) Installation of gauge tie plate & providing insulation for gauge tie plate (Insulation in William Stretcher Bar will be Provide by Railways). (iv) Wiring inside the point machine, insertion and termination of tail cable in point machine and junction boxes / location box /cable hut as per extent practice on WR and the instruction of Railway Engineer at site. (v) Supply and fixing of suitable size GI pipes with flange for taking cable into point machine. Note ; The ground connections shall be suitable to the Point Machines as specified by Engineer-in-charge and shall be suitable to the point lay out i.e. 60 Kg. / 52 Kg / 90R as per yard layout. Electrical Point Machine and M-6 / Screw less terminals will be supplied by Railways / covered in Schedule separately

6

24970

149820

... More
Refixing of electrical point machine, ground connection during phase working (No 50 interlocked working) after removing the existing fitting if any, adjustment if necessary, cable termination, wiring ,testing and commissioning of electrically operated point, fixing and connecting point indicator on derail switch if necessary. The work shall be done as per extant practice on WR & the instruction of Railway Engineer at site.

6

2037

12222

... More
Supply & Fixing of Protective screen of expanded metal 12 SWG of Size 1200 X 1500 mm on Signaling as per standard practice for protecting against voltage in AC Traction area as per instruction of Engineer In Charge.

3

4556

13668

... More
UL/EN/FM/VDS/LPCB approved Microprocessor based Networkable Analog addressable and modular type of Fire Alarm Control panel with display, in built changing facility and provision of GSM module suitable to send SMS to configured mobile numbers.

8

67358

538864

... More
Supply, Installation, Testing & Commissioning of Analogue Addressable Multisensor 53 Detector with multiple sensitivity (adjustable at site) levels e.g. smoke, heat, rate of rise heat etc, programmable for timed automatic sensitivity selection with base, and other accessories required.as per RDSO specification no. RDSO/SPN/217 /2021 ver 3.0 or latest.

8

3073

24584

... More
Analogue Addressable, resettable Manual Call point with inbuilt integral short circuit isolator having status LED for alarming & standby mode, Electronically addressed

8

3787

30296

... More
Supply, Installation, Testing and Commissioning of Analogue Type Linear Heat Sensing cable (LHS) / Linear Heat Detection (LHD) tube compying to RDSO/SPN/217/2021 (Ver. 3.0 or latest) As it is the latest UL or FM or VDS or LPCB approved / listed. 56

800

680

544000

... More
Liner heat sensing (LHS) interface module.

8

54194

433552

... More
Supply, Installation, Testing and Commissioning of aspirating (Air Sampling) Type smoke detector with four zone interface module and isolator with power supply unit, back box and all other accessories as per the RDSO Specification RDSO/SPN/217/2021 ver 3.0 or latest) 58

8

149203

1193624

... More
UV/IR Flame detector with required modules 59

8

72222

577776

... More
Hooter cum Strobe.

8

5845

46760

... More
Fire survival circuit integrity cable i.e. armored cable & power cable with all accessories for connection of all fire alarm devices 2 core 1.5 Sq.mm.

800

77

61600

... More
Supply, Installation, Testing & Commissioning of relay module with back box and all other accessories as per the RDSO specification No. RDSO/SPN/217/2021 ver 3.0 or latest.

8

3912

31296

... More
Supply and fixing of PVC pipe of 25 mm size of IS standards on wall/floor etc All necessary items like screws/nails required to be supplied by contractor. Inspection by representative

-

-

62

... More
Laying / drawing of various type of cables on PVC pipe /capping casing, or cable trays, ladder,shelter etc as instructed by Railway engineer at site. (Indoor cables to be drawn through pipe,outddor cables if required o be clamped onwall/Fl 64

800

5

4000

... More
Addressable loop powdered sounder cum Strobe with inbuilt fault isolator

8

7641

61128

... More
Auto telephone dialer (GSM) to send the pre-recorded message to multiple mobile Nos. programmed.

8

6376

51008

... More
Installation of track device (double rail contact) including digging of trench, track crossing, laying of anti-rodent, antioxidant & non-flame propagating type Double Walled Corrugated (DWC) pipe as per IS- 14930 part- I or II or latest and all other accessories as per site requirement to 66 be for laying of transmitter and receiver cable. The item also includes installation of EJB / Track side Electronics including foundation & earthing as per OEM's guidelines and Technical requirement & specification with their own material. NOTE: Installation / programming / configuration / commissioning of Axle counter equipment to be carried out in accordance with latest guidelines issued by Railways/RDSO preferably by Authorized representative of OEM.(Unit read as Per DP)

48

15409

739632

... More
Installation of Central Evaluator of axle Counter, wiring from CT rack to Central Evaluator, installation and wiring of the reset box, LV box (if required) and associated power supply wiring. This includes supply of shielded cable of required conductor size for wiring between CT rack to 67 evaluator rack, all other wires, power supply cable and wiring materials. The power supply cable from power room to Central Evaluator should not be less than 10 sq.mm PVC wire. Earthing as per OEM's guidelines & specification with their own material. This also includes painting and writing work on evaluator as per site requirement. NOTE: Installation /programming / configuration / commissioning of Axle counter equipment to be carried out in accordance with latest guidelines issued by Railways/ RDSO preferably by Authorised representative of OEM.

2

13116

26232

... More
Transportation of S&T material leading up to 1 Km including Loading from Starting point, unloading & Stacking at destination. 69

100

505

50500

... More
Extra for each additional 1 Km or part thereof

10

5

50

... More
Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This includes supply of paints of Asian Paints/ Nerolac / Dulux / Berger make. Full Case

25

128

3200

... More
Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This includes supply of paints of Asian Paints/ Nerolac / Dulux / Berger make. Half Case.

70

86

6020

... More
Preparation of Cable Route Plan of buried S & T Cables using Radio Detector 8200 GS or Similar model GPS Model and DGPS for Per Trench per Km. For existing cables as per the instruction of Engineer in-charge. Submission of report in KMZ file format, Soft Copy Only.

10

53987

539870

... More
Tripod Earthing of HADAC to be done along with the supply of all requisite materials. 73 Earthing shall be in the form of Tripod Earth conforming to RDSO specification No. RDSO/SPN/197/2008 (with 3 no.s maintenance free earth electrodes), with earth resistance less than 1 ohm. The earthing shall be maintenance free & earth enhancement compound should be used. The earths shall be interconnected by copper strip of size 25x3 mm

8

37526

300212.8

... More
Supplying & fixing of key box made of MS sheet/ wood with a glass front and padlocking 74 and sealing arrangements per std practice. Pad lock to be supplied by the contractor. All material i.e. wood, handle, hinges, glass sheet of 3 mm thick to be supplied by the contractor. Box to be powder coated/polished and description/size to be as per instructions of Engineer in - charge.

6

1392

8356.8

... More
Correspondence Test of Signalling Gears (Points, Signals, Track Circuits, ICC, BPAC etc.) during Rolling Block /Disconnections/ NI Note: Contactor/Firm should provide sufficient Manpower with Workable tools & Equipments.(Unit read as Per Gear)

150

1269

190350

... More
Installation, Wiring and testing of Integrated Power Supply System. This includes power distribution connection to bus bars and relay racks in the room with contractor's own wiring materials and fabrication and fixing of AC/DC power distribution board made on 8mm thick SMC sheets or any 76 standard make with connections suitable for 32 A. Wiring to be done considering site requirement, depending upon the load with suitable wires, lugs & glands as per instructions of Engineer-in-charge. The work includes installation of ELD's, fixing & wiring of change over switch(program switch) for selection of DG set supply (DG1 & DG2) and wiring of change over switch (program switch) for selection of mains or DG supply. This item also includes supply & fixing of ladder along the wall for carrying power supply wires/cables from IPS room to Relay room/power room etc. Any masonry work required will be carried out by contactors own material. 77

1

98791

98791

... More
Installation testing and commissioning of SMPS based IPS at LC gate.

8

35843

286744

... More
Releasing of Existing Panel, Power Equipments,relays and relay racks,CT racks, 78 Batteries, Block Instruments, Ground frames, Location Boxes, TLJBs, Signal Posts, Signal Units, Equipment inside the location boxes, Lifting Barrier, rodding runs etc as applicable including the breaking of foundation etc. as per the instructions of Rly Engineer at site & their transportation to nominated depot. This work to be done by contactors with his own vehicle and labour.

150

14035

2105250

... More
Fixing of Junction type Route Indication 1-Way/2-Way/3- Wayon the top of the signal post.

3

739

2217

... More
Fixing of KLCR and its with this includes supply of MS sheet box for fixing of KLCR relay along with push button etc. (KLCR in other shedule)

4

5388

21552

... More
"Installations, wiring, testing and commissioning of Remote Terminal Unit complete 81 along with accessories using Contractor's own wiring &fixing materials. (It includes loading of NETWORKING software and networking with data logger. The requisite communication cable/channel for networking will be arranged by Railway.

8

6720

53760

... More
Installation & commissioning of Sliding booms with E type lock and KLCR. This includes wiring of KLCR, running of cables, necessary, painting & transportation of materials from store to site. All material required to commissioning of slide booms on gate will be supplied by the contactor

8

15612

124896

... More
Design & Supply of circuits and plans to suit layout given in the signalling plan of IBS/ABS/LCGATE. All plans and wiring diagram shall be prepared on Auto cad Drawing and supplied with CD/ USB Pen Drive. This will include supply of: 1. Control cum Indication panel diagram, 2.Route section plan, 3.squaresheet, 4.wiring diagrams 5. Relay rack/ Relay arrangements 6.Bus bar details, 7.Fuse analysis 8.contact analysis 9.Relay room tag block analysis 10. Panel tag block analysis, 11.Power panel diagram 12. IPS wiring diagram 13.Auto change over diagram 14.Power equipment arrangement with program switch 15. Block circuit wiring diagram 16 Digital Axle counter wiring 85 diagram and all other relevant drawings NOTE: The contactor shall initially supply 2 sets of documents (Paper Prints) for approval of Railways. Railway will return one set to the contactor duly approved with alterations/corrections, if any. The contactor shall incorporate Railways' alterations/corrections/ comments, if any, in the tracing & CD/USB Pen Drive without any deviation and submit all the tracings and Final CD/ USB Pen Drive complete with all respect for Approval of Railways. After Approval of Railways on the tracings, the contractor shall submit 3 sets of final approved diagrams tithe Railways within 15 days. He shall ensure the each sheaths a block for signature of railway official as well as a block for signature of firm, duly signed by the authorized signatory of the firm. The name of the work as given by Railways shall be written on every sheet under the work column. All the drawing shall be supplied in a good quality folder for each IBS/ABS/LC gate.(Unit read as Lot) 86

8

12900

103200

... More
Supply of ferrules of different colour, printing termination details/ functions in different colours as per Railway specification and installation in location box CTR and power board etc. All the materials required for the work shall be supplied by the contractor.(Unit read as per ferrule).

25000

8

200000

... More
Supply,Instllation,Testing and Commissining of CPVC Pipe for Aspiration Detecton system as per RDSO/SPN/217/2019 Ver.3 or later shall be as listed / approved by UL or VDs or LPCB with appropriate equivalent standard.

100

825

82500

... More
Translation of Station Working Rulesfrom english to hindi and framing outin DIGLOT form (or similar software)as per extant Rly practice. Therequired SWR in english will beprovided by the contractor and hasbeen covered separately in item.

2

5239

10478

... More
Design,supply, testing and commissioning of Remote Diagnostic and Predictive 4 Maintenance System (RDPMs) as per Draft RDSO document No. RDSO/RDPM/FRS/2021; as per Signalling Plan Enclosed. (The Detailed break up of various modules/components are enclosed separtly for annexure.The detailed of Design/schematic drawing, make and model of various product being proposed to be provided for RDPMS system.)

2

3319284

6638568

... More
Manual Horizontal Auger boring for crossing of Road at depth of 1.0m/1.02m from ground level including insertion of 100mm dia (with thickness 3.65mmm) GI pipes/couping etc. all complete as per direction of engineer in charge. supply of GI pipes is covered separately in schedule 'A'

300

1007

302100

... More
Laying of half round RCC pipe after laying the cables in the trenches. (Cable laying is covered separately)

-

-

6

... More
Laying of UTP CAT-6 cable through steel pipes/casing caping etc. as per technical specification

300

8

2400

... More
Preparing of SIP of each station prepared of yard diagrams in CAD and submit check 8 print. After making correction/modification or alteration return us corrected copy of each diagram in turn and correct all this correction in soft copy & PDF copy of diagram and make diagram completely. All diagram take out color print venyle print with lamination and frame with hanging arrangement. 9

-

-

37492

... More
Supply and fixing of cable truff of 4 inch x 4 inch

200

328

65600

... More
Shifting of existing Signal along with foundation as per site requirement. This inclusive of required labour, machinery like hydra, JCB etc. 11

3

7730

23190

... More
Fabrication & Installation of Emergency Key Box of Alumunium Frame in ASM Room. 12

2

6143

12286

... More
Complete painting and varnishing work of all S&T Gears at a station 13

2

44197

88394

... More
Complete painting and varnishing work of all S&T Gears at a LC 14

8

7092

56736

... More
Preparation of CRP,CCC,TCP, Location drawings, Track crossing plans

3

20355

61065

... More
Fabrication and supply of equipment rack of 18' gauge of M.S. sheet for housing of 15 signaling and telecommunication equipments installed in station master office (a) Panel -I of size 190cm x 104cm x 40cm having 5 sheives & side shelf of size 190cm x 40cm x9cm and front door provided with glass.

3

27639

82917

... More
Transferring of Signaling/Telecom cables from existing Location box to New Location box.

500

354

177000

... More
Installation of Axle counter cable conductor's Earth resistance Sensing unit. Microcontraoller based for 12 nos counductors without cable

2

3815

7630

... More
Installation, Testing & commissioning of Block proving by Axle Counter (BPAC) including UFSBI equipment 19

2

21986

43972

... More
Installation testing & commissioning of Single Section digital axle counter single section

4

19467

77868

... More
Shifting of Exposed cables. The itemincludes Removal of exposed cablefrom existing trench & laying the samein new trenches. Digging, Placing ofcapping/Half round RCC pipe coveredseparately. Inspection: ConsigneeInspection 21

2

6030

12060

... More
Charging of 2V 200AH

112

1030

115360

... More
SMPS based Integrated Power Supply System for Electronic Interlocking as per RDSO/SPN/165/2012 version -3 or latest and Drg No. CSTE/6155/ 8 of 8. This includes transportation, installation and Commissioning of Integrated Power Supply System.

1

1109950

1109950

... More
SMPS based Integrated Power Supply System for IBS & LC Gate in RE-Section as per RDSO Spec. No RDSO/SPN/165/2012 version -3 or latest and Drg. No. CSTE/6155/ 2 of 7.This includes transportation, installation and Commissioning of Integrated Power Supply System.

8

902951

7223608

... More
Electric Point Machine ,Non Trailable, Internal Locking, 220Mm Throw With IP 67 Motor, 1 Minimum AC Immunity 400Vac With Tools And Complete Accessories Including Complete Ground Connection And All Insulation, Crank Handle And Along With Clamp Point Lock 60Kg, TWS As Per Drg.No. RDSO/S/11000 As Per Rdso Spn. Irs:S- 24/2002 With Amd.01 Or Latest. IRS Type.

6

132689

796134

... More
Main LED Signal lighting unit working on 110v ac as per RDSO specn. No. RDSO/SPN /199/2010rev.1.1 retrofit table in existing CLS housing (sa23002, s23024/m) Red Aspect.

48

7345

352560

... More
Main LED Signal lighting unit working on 110v ac as per RDSO Specn. No. RDSO/SPN/199/2010 rev.1.1 retrofit table in existing CLS housing (sa23002, s23024/m) GREEN Aspect.

56

7454

417424

... More
Main LED signal lighting unit working on 110v ac as per RDSO Specn. No. RDSO/SPN/199/2010rev.1.1 retrofit table in existing CLS housing (sa23002, s23024/m) Yellow Aspect.

112

8040

900480

... More
Main LED Signal lighting unit110v ac for calling on signal in Railway signaling as per RDSO/SPN/153/2011 (rev. 4.1)or latest

5

5663

28315

... More
ROUTE aspect LED signal lighting Unit, 110V Ac, retrofitable in existing CLS housing and compatible with AC LED ECR as per Specification No. RDSO/SPN/153/2011, Revision 4.1. Make /Brand: PTC

20

4719

94380

... More
Main LED Signal lighting unit110v ac for Shunt Signal in railway signaling as per RDSO/SPN/153/2011 (Rev. 4.1) or latest.

30

5418

162540

... More
Supply of Multi Section Digital Axle Counter (MSDAC) for mentioned detection Point by the purchased & track Section as per SIP, complete with all accessories, cable required with each track device & card viz. Axle detectors, Track Side Electronics/DAC field units, Central Evaluator (Central Evaluator unit should be housed in a pre-fabricated rack to be supplied along with the system), reset 1 unit, Relay unit, Event Logger & Diagnostic terminals, etc. Required for different Detection Points & Track Sections as per RDSO Specifications No. RDSO/SPN/176/2013, Ver.3 or latest and OEM/ manufacturer's specification and as per Annexures. (Quantity 01 No. = 01 DP) Inspection Authority: RDSO. Note:- As per WR's Policy No 03/2024 Para No. 3.4.2 .e .iv "VDU/Reset box can be used for resetting. At Stations having more than 10 Track sections, the Railway propose to use a separate VDU- based resetting system. Such a VDU-based system if using a PC, it must be industrial grade" (Unit read as Per DP).

60

341113

20466780

... More
Supply, Installation, Testing and Commissioning of Block proving with digital Axle counter using UFSBI complete set for Double line operation.as per IRS: S-105/2012Ver.0with latest amendment &Manufacturing specification. NOTE: One set will include equipments required for one complete double line Block Section except DAC. Each Set consisting of following: 1-Universal fail safe block interface for double line as per RDSO Spec.no. IRS: S.105/2012 with latest version and amdt. It shall have auto changeover facility for quad and E1 Channel, necessary interface for quad and E1channel to be supplied along with auto changeover arrangement. Quantity of this item -02 no in one set. 2-Block panel complete with all accessories as per RDSO/S/3/2017 with latest amdt QTY-02 no. 3- 1 Relay rack with double locking and sealing arrangement as per RDSO Drg.No. RDSO/S/3/2018 including relays for each Relay rack (QN1-19 no., QNA1-07no, QL1-02 and Timers1 no).Quantity of this item - 02no intone set. 4-Block telephone with accessories as per RDSOspec.no. RDSO/SPN /191/2000(the block phone should work without any interruption after auto changeover). Quantity- 2no. 5- Supply of reliability improvement kit suitable to work with UFSBI as per RDSO/SPN/147/2005 or latest. It comprises (a) automatic media changeover of modem working on redundant channel for data transmission on OFC/quad/ micro wave radio (any two media)-1pair (b) secondary modem for UFSBI for use with secondary media OFC/quad/voice channel=1pair(c) power & data SPD: type c &d: power line VF 24 AC/DC-2no, V20C/3PH 150v-2no) & dataline SPD (MDP 4D/5T- 2no). (d)Power monitor and soft startunit PMSS - 1 Pair. Make/Brand: Self

1

1223660

1223660

... More
Supply, Installation, Testing and Commissioning of High Availability Single section digital axle counters with Dual sensor system as per RDSO/SPN/177/2012 version 3or latest. This includes The supply of High frequency web mounting type Tx coil/Rx coil, VR/PR Box duly wired, Vital 1 relays, PR Relays, Clamp with deflector plates & hardware, Dual display reset box with auto resetting facility, Surge voltage protection devices and filter card to be mounted on din rail etc. as per OEM for complete installation & testing& commissioning of(HASSDAC) system NOTE: One set of HASSDAC system will include equipment required to monitor One Up line or One Den line of a full Block Section between two stations. Note: - "Supply of HASSDAC as per RDSO specification along with outdoor industrial grade enclosure (Approved by Railways) similar to Rattle/Pyrotech make.

4

758153

3032612

... More
Supply of HDPE duct 40/33 mm as per TEC GR No. G/CDS 08/02 NOV-2004 with latest 1 amendments as available. For each Km of HDPE duct following items are to be supplied:- (a) End Plugs- 2 Nos. (b) Cable sealing plugs -2 Nos. (c) Plastic couplers slip fit/push fit type - 2 Nos. (d) End plugs to be provided along with drum -2 Nos. RDSO/SPN/45/2013 Rev 2.0 and Amd.2 or latest.

90

51130

4601700

... More
Supply of Double Walled Corrugated (DWC) HDPE Pipe with associated collars etc. as per RDSO Specification No. RDSO/ SPN /204/2011 or latest anti-rodent & anti-oxidant and non flame propagating type in 6 meters straight length and of size 120 mm outer dia, & 103.5 mm inner dia. (The 2 manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One of the following coupling arrangements should also be supplied with each pipe as per the site requirement. 1) Suitable snap fit coupler with rubber 'O-Ring 2)Spacers 3)Tees 4)Bend, 5)End-cap (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vender name and year of manufacture can be easily identified.

100

1779

177900

... More
Supply of 2 x 48 Fiber 2x 48 SC Type Rack Mountable FDMS loaded with SC '0' DB & Adaptor SC SM pigtail 1.5 meters with all the accessories required for installation.

16

43997

703952

... More
Supply of Straight Joint Enclosures (SJC) complete with all accessories as per GR/ OJC 4 /02/02 Sept 2003 for 48 fiber, Raychem make model FOSC 400 B4 48F or RSICS make model 1500-L 183-XX or Birla VXL make model VT-200 or 3 M make model 2179 CS or TYCO make or better as per instruction and approval of Engineer In charge

30

4088

122640

... More
Supply of Thermo shrinkable joint kit as per RDSO spec no. IRS TC 77/2012 Rev-3 or latest suitable for 2T joint RTSF3 suitable to 6-quad cable of spec no. IRS TC30/2005, Ver-1, Amd-4 or latest.

40

3058

122320

... More
Supply of Thermo shrinkable joint kit as per RDSO spec no.IRS TC 57/2006 Rev-0 Amd-1 suitable to 10/20/50 pair PIJF U/G telecom cable of spec no. IRS TC-41/97, Amd-2 with latest Amd. Size of the cable will be advised by consignee in charge.

10

2515

25150

... More
Supply of one Quad VF 2T Transformer joint assemble of VF transformer 1120:470. As per IRS:TC 76/2021 ver 1.0 or latest.

40

1297

51880

... More
Supply of G.I. Pipes 100 mm dia medium grade engraved on pipe as per spec. no. IS 1239 of 1990 or 1992 or latest with sockets and fittings. (Surya, Jindal, Tata, or Asian make.)

-

-

8

... More
Supply of Maintenance Free Earth Electrode of length 3m, including supply of 3 bags of Earth enhancement material for earthling (20KGs /bag) for each electrode & other accessories as per Drg. No. SDO/RDSO/E&B /001 and RDSO Spec No. RDSO/SPN /197/2008 or latest.

3

12352

37056

... More
Supply of Emergency Socket Box in FRP material as per RDSO Spec RDSO/SPN/TC/44/2002 Amd 3.0 or latest.

25

1808

45200

... More
Supply of 6-pin emergency plug & socket flat type as per RDSO spec no. IRS: TC-42-87 Amd. 3 or latest.

-

-

11

... More
Suppy of 12 pairs CT box for termination cables as per the details approved by the engineer. All the required materials shall be supplied by the contractor. As per RDSO Specification No.TC 18-75 or latest.

6

1478

8868

... More
Supply of 20 Pair CT Box Wago Type made up of atleast 18 SWG galvanised MS sheet, 13 spray painted Gray Colour, locking arrangenment, Termination of 0.9mm U/G Quad cable, it includes supply of Hylum Sheet 12mm 52 thick, Nuts, Bolts, suitable size of GI Pipe for Fixing on the wall for U/G Quad Cable, with disconnection facility.

6

2596

15576

... More
Supply of RFID Marker locator, 8000 Marker records, built in GPS Module, 1.5m depth range 4 X 20 Digits LCD display

1

345471

345471

... More
Supply of Optical Time Domain Reflectometer (Type-I) (1310 nm & 1550 nm wavelength) for Long Haul Applications with FDD adoptor FC-PC and SC-PC as per TEC/GR/ TX/ OTD- 01/04/APR-2010 or latest. With report generation tool and software

1

314468

314468

... More
Supply of Single Fiber Fusion Splicer Similar to Fujikura 80C with Standard Accessories : AC ADAPTER /BATTERY Charger ADC-18 1PC, AC Power Cord ACCXX: 1PC spare electrode Elect2-20:1 16 pair carrying case CC-30:1PC USB cable USB-01: 1PC Sleeve loader SL01:1 PC dispenser AP- 01: 1 PC screwdriver SC-01 1PC, Instruction manual: 1 PC Quick reference Guide 1PC warning& cautions: 1 PC ; BATTERY RACK BRT-09, Battery charger cord DCC-18: 1 PC High precision Fiber cleaner CT-06: 1 PC, 3 in- 1 Stripper : 1PC & Protection sleeves: 25 nos. (A demo shall be arranged along with supply.)

1

437578

437578

... More
Supply of Tool & Testing for OFC Cable (OFC power meter 1310/1550 nm & OFC power source/generator 650/1310/ 1550 nm) with tool box as per technical specification

1

140692

140692

... More
Supply of OFC Maintenance tool kit as per TEC Spec NoG/OMS/01/01 April 94 or latest. One set consisting of following 1) Digital Multimeter 4-1/2 digit with LCD display 1 No. Philips/Flike/Motwani. 2) Rotary duct cutter for cutting ducts(with replaceble blade) 2Nos. 3) Utility 18 Knife 1No. 4) Cable slitter 1No. 5) Tubing cutter for cable armour 1 no 6) Bare fibre adaptor 1no. 7) Miller high precision stripper for fibre buffer-2no 8) Pocket cleaver 1nos 9) Mechanical splice joint set (1 set consisting of 6 nos.) 10) Ceramic scissor CSI 1No. 11) FC/PC adopter with ODB loss- 10Nos 12) Optical fibre terminal V groove- 2Nos 13) Earth resistance measuring instruments with all accessories range 0.1 to 10 Ohm. 14) Megger 500V-1No, 100V-1 No. 15) Loose tube stripper-1No. 16) Cord stripping plier-1No. 17) Krone Tool - 1 No

1

148426

148426

... More
Supply of Digital transmission measurement set as per SPN - IRS TC: 43/87. with latest Amnd. APLAB make - Model 2031 /2031A/or similar

1

30557

30557

... More
Supply of Optical power meter Power measurement range(decibel milliwatts) -40 to +25 Standard wavelength (Upstream) 1310 nanometer Spectral passband/Pass zone (nm) 1260 to 1500 Standard wavelength (Downstream) 1550 nanometer.

1

44197

44197

... More
Supply of maintenance free VRLA secondary cells duly charged of 48V 200AH and each 21 2.0V when fully charged 200AH capacity along with accessories i.e. inter sell connectivity links/float, 4 Nos. Insulators for each cell 24 Nos. of cell per set as per RDSO Spcn. IRS/S /93/96A with latest amendments with cuticle steel/hylam tray battery rack to install /house batteries.

1

61198

61198

... More
Supply of 48 V, 50 amps battery charger for telecom use as per No. RDSO/SPN./TL/23 22 /1999 (ver. 4) or latest in N+1 configuration i.e. using (2+1) modules of 25 amps with automatic switching between the modules for two sets of 200 AH battery for charging with SMF VRLA. It shall be equipped with surge and lightening protection of class 'B' and' C' the configuration shall be decided as per site requirement.

1

67647

67647

... More
Supply of Control IP telephones without hands free and gooseneck operation for way side stations as per clause 11 of RDSO specification No.RDSO/SPN/TC/99/2012 Rev.2 or latest. 24 300.00 Running

6

24617

147702

... More
Supply of 40mm PVC casing capping

-

14400

14400

... More
Supply of 20mm PVC casing capping

-

-

25

... More
Cable route survey & Preparation of as built proposed and later final cable route and other plans (for OFC as well as other telecom cables whose laying is covered in this schedule) taking into account the points mentioned in chapter II & other chapters of technical require ment on Auto CAD for entire sections. The cable route & other plans shall be prepared by contractor after joint survey, got 1 approved from engineer in charge, changes during course of execution shall be incorporated in the same. After completion of the work all comple tion documents of tracing papers along with six prints of cable route plan, jointing & splicing schedule, cable hut wiring diagram etc. in six sets for each station and section in folders shall be supplied by the contractor. Contractor shall also supply the Auto CAD documents on CD. All the required materials, accessories including tracings, papers etc, shall be contractor's own.

42

1451

60942

... More
Installation of fiber distribution management system rack mountable LIU (Supply 2 covered Above) with all installation materials, restoration wall etc. to original condition , splicing and termination of 2 x 48 fiber cable (With all contractor's materials), routing /dressing fibers as per directions of Engineer in-charge.

16

3914

62624

... More
Transportation and Laying of HDPE pipe as per approved cable route plan in the 3 excavated trench, taking due care while transporting and laying the same in the trenches or other protective works. Both the end of duct should be sealed with end plugs before laying and should remain sealed till blowing is done.

90

6391

575190

... More
Blowing of OFC through HDPE duct & protective work (elicited in above item) already 4 provided. Where it is not feasible to blow OFC due to curves, road/track crossings, bridges or for any other reason, OFC shall be drawn /laid manually as per standard procedure. All the equipments and machinery required shall be arranged by the contractor at his own cost

90

12032

1082880

... More
Transportation and Laying of Quad Cable, PIJF cable of different size in the excavated 5 trench. This includes loading/unloading & transportation of cables from the stores of SSE/T/C/SBI to the site/ Wherever several cables of provision of separation of various cables should be as advised by the site incharge of the Railway. Empty cable drums to be retained by the contractor the cable drums with unused cable at site to be returned by the contractor from site to Stores of SSE/T/SBI

25

5804

145100

... More
Excavation of trench 300mm wide at the bottom and 1.2 mtr deep, in all type of soils including clearing of trees, bushes, etc. and refilling of cable trench by excavated soil and ramming after laying of HDPE DUCT (laying of HDPE/DWC & 6 Quad. cables , PDF cables etc., will be paid under 6 different items of the schedule). Where desired dimensions of trenches could not be achieved proportionate payment will be made as decided by Engineer-in-charge of the Railway at site.The trenching outside the station limits I.e.) between the home signal of station 'A' to home signal of station 'B' may be done manually or by machine, as per the directions of site in charge. In no case the payment will be made for the trench of higher dimensions, than the dimensions as mentioned above

18000

280

5040000

... More
Excavation of cable trench in rocky area, 450 mm wide at the top, 300 mm at the bottom and minimum 0.5 meter deep in rocky area (hard rocky soil mixed with boulders/hard murrum) including cleaning of trees, bushes. The trenching will be done manually only and limited to the stretch between the home signal to home signal of each station and other locations as per the directives of the site in charge. Where desired dimensions of trenches could not be not achieved proportionate payment will be made as decided by Engineer-in-charge of the Railway at site. In no case the payment will be 7 made for trench of higher dimensions than the dimensions as mentioned above. 1. If, in case, depth of 1.2 M could not be achieved and Engineer-in-charge approves the same and then only after his instructions, the following protection work will be done - a) Depth of trench more than 1 Mtr. does not require any protection work and the payment will be made on pro-rate bases (Volumetric) under this item, after laying of HDPE /DWC Pipes, 6 quad. cable, PDF cables in the trenches (Laying of HPDE/DWC, 6 Quad cable & PDF cable, will be paid under different items of the schedule) and refilling of cable trench by excavated soft, soil, murmur, boulders etc. and ramming over the refilled trench. Care should be taken while refilling the cable trench such that the murrum/boulders etc do not damage the cable.

100

436

43600

... More
Splicing of laid under above items OFC cable and making the splice joint in dust free environment with contractor's own equipments and labour. Straight joint enclosure (SJC) is covered 8 under schedule 'A' remaining all required materials, tools , plants shall be arranged by the contractor. splicing shall be started from one end and each splicing shall be monitored after splicing and after closing the enclosure for all the fibers from one central location by contractor's engineer with his own OTDR and optic Talk set with railway engineer , trace for the fibers shall be taken and signed jointly, if any fibred splice shows high loss/lossy event, the same shall be redone before completion of splicing work. The splice loss shall be as per the policy/technical circulars issued by the railways from time to time.

30

7482

224460

... More
Supply & Installation of Plastocrate pre-fabricated (RCC) OFC jointing pits size 0.6mx0.8mx1m. The material shall be supplied as per engineer in charge instructions.

30

5299

158970

... More
Construction of brick chamber behind of OFC room 2x2x1m. Item includes arranging of all material required for the same such as bricks, sand, cement etc. Cement and sand should be in ratio of 1:5. Chamber should have RCC cover, which should be openable.

3

5368

16104

... More
Execution of quad cable jointing using thermo shrinkable joint kit straight though/ Derivation / 2T / 3T transformer joints with VF transformer between 6 quad & PIJF cable this i/c transformers on 6 quad / jelly field cable.

50

1223

61150

... More
End to end testing of all fiber of the optical fibred cable laid under above items between 12 station/cable huts. All required equipments, tools and plants shall be arranged by the contractor. Five nos. of print out of traces in folders of OFC parameters/ results, The per kilometer link loss shall be as per the policy /technical circulars issued by the railways from time to time.(Unit read as per block section).

8

14387

115096

... More
Installation of maintenance free earth electrode for maintenance free earth spec of RDSO/SPN/197/2008 or latest.

3

5540

16620

... More
Fixing of 10/12/20 pairs CT box for termination cables as per the details approved by the engineer. All the required materials shall be supplied by the contractor.

12

381

4572

... More
Supply and installation of RFID based Electronic Cable/ pipe marker 22.5 Cms dia 1.5m Depth range , 10 Digits Hexa decimal ID code, 101.4 Khz frequency.

100

2818

281800

... More
Manual horizontal auger boring/drilling of 100mm dia Horizontal Bore across the Railway Track/ Across Road at LC gates by Boring method at a depth of 1.65mm from the ground level/ ground level to be considered ignoring the bank height of the bank/road and insertion of HDPE/DWC/GI pipes etc., as per the instructions of Engineer in charge at site.

500

782

391000

... More
Horizontal direction drilling/boring without damage of surface road using Auger Machine. The bore shall be 150 mm dia & shall be done at the depth of minimum 1200 mm from the 17 ground level. The ground level shall be considered ignoring the bank height of the bank of the road. The length of the bore shall be minimum 4 Mtrs long. This include insertion of different dia DWC pipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable

2000

1342

2684000

... More
Fixing & laying of 100 mm dia GI pipes and parapet wall/roof of culverts, including masonry work at both ends with contractors own material and bending of the pipe at the both ends etc. as per directive of Engineer in-charge, Perforation should be done before laying of GI pipes.

100

190

19000

... More
Fabrication of EC socket box, assembly and erection of fabricated assembly at the location indicated in the route chart and as per direction of Engineer in charge. This includes cutting of rails to required size, supply and welding of GI Pipe and base plate, fixing of EC Socket box, transportation of material to site, digging of pit and erection of whole assembly at site. The work also includes the termination of 6 Quad/PIJF derivation cable on the strips of 6 pin EC socket inside emergency socket box. The fabrication of EC Socket box shall be done as per Drg. No. SK/CSTE/C/97/16 & SK/CSTE /C/97/20. Rail post will be supplied free of cost at the SSE (Tele) C/SBI depot in full lengths. Note - In addition to above, the centre pins of EC sockets shall be terminated with a dedicated pair of 6 Quad cable (Derivate through the tail PIJF cable) in the entire block section so as to provide magneto/auto telephone communication from each EC socket. (All materials supply by contractor except rails).

-

-

19

... More
Painting of emergency socket assembly and rail post by applying one coat of red oxide as base color, and then painting the assembly as per zebra painting in white and black colors. The width of each of the black and white colors shall be 100mm. All paints used shall be with ISI mark.

25

731

18275

... More
Supply of paint & painting of telephone mark with indicating arrow, indicating the 21 direction of the nearest emergency socket on the RCC route/joint markers & EC socket box with kmtrs. All paints used shall be of Asian/Shalimar/Acolyte make with ISI mark. The indicating Arrow and all other writing work shall be done using black enameled paint with background painted Yellow. The work shall be carried out as per directive of site engineer

525

104

54600

... More
Cement concrete work for miscellaneous items in the ratio 1 : 3 : 6 . Item includes excavation, ramming, curing and plastering with cement & sand mixture (aggregate not exceeding 3.8 cm.) (Aggregate cement & sand to be supplied by the contractor).

20

3462

69240

... More
Placing of DWC/RCC pipes along with collars in trenches at places of track and road crossing platform cutting etc.

-

-

23

... More
Supply, Transportation & Installation of RCC cable route marker engraved and painted on both sides along the route every 50 mt. & route diversions as per site incharge instruction.

1000

386

386000

... More
Preparation of cable Route Plan of buried S & T Cables using Radio Detection 8200 GS or 25 similar model GPS Model and DGSP for per Trench per Km. For existing cables as per the instruction of Engineer in-charge. Submission of Report KMZ File format. In Open Line Section (Unit read as Per Trench Km)

45

40752

1833840

... More
Supply and installation of Electronic LC gate Telephone system with voice logger facility 26 as per RDSO Spec No RDSO/SPN/TC /51/2021 (Rev 1.0) or latest consist of one master Telephone, 06 slave Telephones with modified surge protection & Line connecting unit and 24 Volt DC power supply unit with MF battery compatible with existing electronic LC Gate Telephone system. FIRM's OFFER: MAKE/BRAND- Bentron Power Systems 27

11

55981

615791

... More
Earthing of armour of under-ground OFC, Quad & extending it to the telecom earth.

3

1357

4071

... More
Providing brick masonry in ratio 1:6 cement and mortar including plastering with 1:4 28 cement and sand mixture on both sides, 20 mm thick each with contractor's owned class II bricks, including excavation, curing, grouting, bolting, etc. wherever required. Bricks sand and cement are to be supplied by the contractor.

20

2507

50140

... More
Supply and installation of Class -B type lightening arrester for 100 KA 10/350 29 microsecond for single phase supply along with Class -C type surge arrester for 40 KA 8/20 microsecond for single phase supply as per RDSO Specs. RDSO/SPN/TC/98/2011 Rev.0 or latest amendmen

3

18685

56055

... More
Installation,wiring, commissioning of 48 volt / 50 Amp SMPS based charger along with the power supply wiring from Power room to equipment room in ladder, wire, SPD, MCB, ladder and any other material required for installation will be arranged by the contractor.

1

2120

2120

... More
Installation, wiring and commissioning of maintenance free VRLA cells at each station. Note:- The rate quoted shall be including the cost of DC bus bar of 48V DC /Power wire suitable stand etc., connection of power supply to the equipments. All the wiring shall be done with the suitable gauge of power wires through suitable casing / capping as per the instructions of railway engineer's. All the 31 materials required for this item shall be supplied by the contractor.

1

2862

2862

... More
Metallizing of steel work of girders with sprayed aluminium after surface preparation by Sand/grit blasting, followed by one coat of etch primer (IS:5666) & one coat of Zinc Chrome primer (IS:104) and two coats of aluminium paint (IS:2339) with all labour, T&P and material as a complete job duly conforming to all relevant specifications and process given under Clause 39 of IRS-B1-2001. Note: Nominal Thickness of sprayed Aluminium coating shall be 150 microns. DFT of Zinc chrome primer shall be 25-30 microns and DFT of each coat of Aluminium paint shall be 12-14 microns. On new girder during fabrication

-

-

26

... More
Providing cast in-situ plaques for bridge foundations details of size 45cmx45cmx5cm in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm deep notch over abutment & piers, engraving the letters & figures with CM 1:3 and finished smooth including painting letters and figures with 2 coats of black enamel and plaque with white enamel with all labour, tools, cement, paint, curing etc. as a complete job. 35

-

-

34

... More
Supply and using Cement at Worksite Ordinary Portland Cement 53 grade of approved brands/makes

-

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.