Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Western Railway - WR Tender

Works
Civil And Construction
Bridge Construction
Ireps
Opening Date17 Feb 2025
Closing Date11 Mar 2025
Tender Amount₹ 36,09,58,187.46 
Notes
Download

Costs

Summary

Elimination Of 04 Nos. Level Crossings Level Crossings By Providing Road Under Bridges Between Chitrod- Samakhiali Stations

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Loading, transportation, unloading and stacking relieving girder (b) For each additional one km. Or part thereof

39680

5

244302.5

... More
Launching of Railway's relieving girder of overall length up to 26.80 metre after removing track, ballast, excavation earth on properly prepared wooden /CC cribs supports as per the approved scheme of 3 launching, Railway drawing and specifications, by contractor's tools & plants, machineries, labour, equipments etc. The work includes fixing of track i.e. wooden sleepers and rails to Railway's specification and standards on the relieving girder and necessary adustments in the longitudinal and cross levels after insertion of the relieving girder in the track to maintain safety of trains on the relieving girder and its approaches. Note : This item also includes transportion of releiving girder from within 2Kms to site of work. (a) 14 m to 20.40m long girder

6

201348

1298452.98

... More
Launching of Railway's relieving girder of overall length up to 26.80 metre after removing track, ballast, excavation earth on properly prepared wooden /CC cribs supports as per the approved scheme of 4 launching, Railway drawing and specifications, by contractor's tools & plants, machineries, labour, equipments etc. The work includes fixing of track i.e. wooden sleepers and rails to Railway's specification and standards on the relieving girder and necessary adustments in the longitudinal and cross levels after insertion of the relieving girder in the track to maintain safety of trains on the relieving girder and its approaches. Note : This item also includes transportion of releiving girder from within 2Kms to site of work. (a) 26.80 long girder

2

545563

1036897.46

... More
Delaunching of Railway's relieving girder from bridges and stacking at bridge approache with 5 contractor';s labour,traiker, cranes, derrick, tools and plants equipments,consumables etcv. Complete as per specifications, specialconditions and detailed scope of work furnished in thetender and as directed by the Engineer in charge. Note:- 1. Dismantling of the overlaying track shall be paid throughother relevant item. 2. Each girder consists of two cross braced leaves. Note : This item also includes transportion ofreleiving girder from site of work to within 2Kms. (a) 14 m to 20.40m long girder

6

54763

353157.76

... More
Delaunching of Railway's relieving girder from bridges and stacking at bridge approache with contractor';s labour,traiker, cranes, derrick, tools and plants equipments, consumables etcv. Complete as per 6 specifications, special conditions and detailed scope of work furnished in thetender and as directed by the Engineer in charge. Note:- 1. Dismantling of the overlaying track shall be paid throughother relevant item. 2. Each girder consists of two cross braced leaves. Note : This item also includes transportion ofreleiving girder from site of work to within 2Kms. (a) 26.80 long girder

2

148383

282017.09

... More
Assembly of Railway's RH girder near RUB site brought by the contractor under relevant USSOR/NS item. This item includes preparation of base by earth work (filling/cutting), Cement Concrete base (As required), shifting of segments of RH girder to line and level by using road crane of suitable capacity and required numbers of Jacks etc. The rates shall be inclusive of all labour, tools and plants, machinery and equipment, lifting tackles, 7 tripod with chain and pully, ramps cribs, operator for crane, fuel, consumable etc. complete. as per the direction of Engineer in Charge. The rates shall be inclusive of all transportation of crane to site with all contractor's fuel, operator, consumables, all taxes with all the operational expenses, manpower etc. as per the direction of Engineer in charge or his authorised representative. Note:- (i) Earth Work cutting/filling shall be payable under relevant USSOR/NS item as applicable. (ii) Cement concrete base, its shuttering and cement used shall be payable under relevant USSOR Item. (iii) For assembling the RH girders, HSFG bolts and turn bolts, if required shall be paid by Railway under suitable USSOR/NS item.

396.8

1618

692823.52

... More
De-assembling of Railway's RH girder near RUB site. This item includes lifting of RH girder with 8 required numbers of Jacks etc. & opening of nuts and bolts, HSFG bolts etc. and taking out different plates and accessories. The rates shall be inclusive of all labour, tools and plants, machinery and equipment, lifting tackles, tripod with chain and pully, ramps cribs, operator for crane, fuel, consumable etc. complete. as per the direction of Engineer in Charge or his authorised representative.

396.8

1018

432245.9

... More
Supply of machine crushed 50mm gauge stone ballast in stacks as per special conditions at location with all lead, lift, loading/unloading etc. complete as directed by Engineer in charge.

2028

385

974413.44

... More
Loading/Unloading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, block kankar, 10 pitching stones , rubble stones, laterite, coal, surkhi, dry mortar, sand , moorum, earth, manure or sludge, ashes, lime etc., including lead up to 50m and stacking into/from trucks, trailors or wagons (USSOR-2010 item no. 021070)

2028

37

84342.85

... More
Providing Fabricating & laying of colour coated Galvalume ( Proflex system roofing ) material for self supported roofing system ( Technology similar to Proflex system provided b y M & B engineering Pvt. Ltd., Ahmedabad), Material shall be of following specification, BMT 0.90mm to 1.00mm, APT 0.95mm Tolerance +/- 0.02mm thick, width 605 m m o r a s dicided b y Railway (Tolerance +/- 2mm), including supplying, loading, transporting, unlopading and staking at site, fabricating and laying with all contractors tools plants, machineries, materials and fixtures labours including all lead and lift and laps/ wastage if any etc. complete. The colour of sheet will be decided by Railway. The rate is also inclusive of designing of roofing system, proof checking and providing 1 execution drawing. Fabrication and installation o f self supported roofing technology similar t o Profles System provided by M&B engineering Pvt. Ltd., Ahmedabad decided by enineer. Note: The roofing system should be self supported roofing system (i.e. without purtings trusses, any ancillary o r supports_ shall b e designed b y the Contractor through the consultant and got duly proof checked from VITI / Indian Insitute of Technology, Mumbai, any other Govt. agencies. Design and drawing will be approved by Railways. For design of roofing system relevant load parameters o f IS code o f practice to be adopted. The cost of designing and proof checking of design and drawings wll not be pald separately and these charges are deemed to be included in rates of this item. The rates shall also inclusive of preparatlon of necessary auto cad drawing required for execution of roofing system should be 100% leak proof, resistant to corrosion and maintenance free

3080

1884

5174411.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.