Western Railway Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Western Railway - WR Tender

Goods
Civil And Construction
Bridge Construction
Ireps
Opening Date23 Apr 2024
Closing Date28 May 2024
Tender Amount₹ 28,58,35,334.64 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Loading, transportation, unloading and stacking relieving girder (b) For each additional one km. Or part thereof NS3 11.00 Each 201348.00 2214828.00 4.25 2308958.19 3

68080

5

402354.57

... More
Launching of Railway's relieving girder of overall length up to 26.80 metre after removing track, ballast, excavation earth on properly prepared wooden /CC cribs supports as per the approved scheme of launching, Railway drawing and specifications, by contractor's tools & plants, machineries, labour, equipments 4 etc. The work includes fixing of track i.e. wooden sleepers and rails to Railway's specification and standards on the relieving girder and necessary adustments in the longitudinal and cross levels after insertion of the relieving girder in the track to maintain safety of trains on the relieving girder and its approaches. Note : This item also includes transportation of releiving girder from within 2Kms to site of work. (b) 26.80 long girder (Note:- Unit read as Per Girder)

3

545563

1523921.74

... More
Delaunching of Railway's relieving girder from bridges and stacking at bridge approache with contractor';s labour,traiker, cranes, derrick, tools and plants equipments,consumables etcv. Complete as per 5 specifications, specialconditions and detailed scope of work furnished in thetender and as directed by the Engineer in charge. Note:- 1. Dismantling of the overlaying track shall be paid throughother relevant item. 2. Each girder consists of two cross braced leaves. Note : This item also includes transportation of releiving girder from site of work to within 2Kms. (a)14 m to 20.40m long girder (Note:- Unit read as Per Girder)

11

54763

627998.49

... More
Delaunching of Railway's relieving girder from bridges and stacking at bridge approache with contractor';s labour,traiker, cranes, derrick, tools and plants equipments,consumables etcv. Complete as per 6 specifications, specialconditions and detailed scope of work furnished in thetender and as directed by the Engineer in charge. Note:- 1. Dismantling of the overlaying track shall be paid throughother relevant item. 2. Each girder consists of two cross braced leaves. Note : This item also includes transportation of releiving girder from site of work to within 2Kms. (b)26.80 long girder (Note:- Unit read as Per Girder)

3

148383

414478.76

... More
Assembly of Railway's RH girder near RUB site brought by the contractor under relevant USSOR/NS item. This item includes preparation of base by earth work (filling/cutting), Cement Concrete base (As required), shifting of segments of RH girder to line and level by using road crane of suitable capacity and required numbers of Jacks etc. The rates shall be inclusive of all labour, tools and plants, machinery and equipment, lifting 7 tackles, tripod with chain and pully, ramps cribs, operator for crane, fuel, consumable etc. complete. as per the direction of Engineer in Charge. The rates shall be inclusive of all transportation of crane to site with all contractor's fuel, operator, consumables, all taxes with all the operational expenses, manpower etc. as per the direction of Engineer in charge or his authorised representative. Note:- (i) Earth Work cutting/filling shall be payable under relevant USSOR/NS item as applicable. (ii) Cement concrete base, its shuttering and cement used shall be payable under relevant USSOR Item. (iii) For assembling the RH girders, HSFG bolts and turn bolts, if required shall be paid by Railway under suitable USSOR/NS item.

680.8

1618

1139776.79

... More
De-assembling of Railway's RH girder near RUB site. This item includes lifting of RH girder with 8 required numbers of Jacks etc. & opening of nuts and bolts, HSFG bolts etc. and taking out different plates and accessories. The rates shall be inclusive of all labour, tools and plants, machinery and equipment, lifting tackles, tripod with chain and pully, ramps cribs, operator for crane, fuel, consumable etc. complete. as per the direction of Engineer in Charge or his authorised representative.

680.8

1018

709452.67

... More
Placement of precast RCC segmental Box/slab with the help of road crane at desired location, 9 carefully by lifting and packing method, during traffic and power block with all contactor labour tools and material, crane, machinery, preparation of surface as directed by Engineer, including filling of joints by epoxy mortar and laying of required sand including cost of epoxy and sand, including all material and labour, tools, plants, machinery etc. with all lead and lift.

356.4

3520

1104611.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.