Military Engineer Services Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 32,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(q) All changes/ repair shall be valid only after satisfaction of Engr in Charge / GE. Contractor shall submit all related documents of expenditure of AMC time to time to avoid delay on payment(r) Checking the operation of all suction and discharge control valves etc If found faulty /leakage to be replaced by the contractor without any extra cost.(s) Filling of oil.(t) The contractor shall also arrange require tools for attend routine services/minor breakdown call like an adjustable spanner, clamp meter, pressure gauge with gorging line, digital temperature gun, fix spanner set, Allen key set, screw driver set, cotton waste software support if require.(u) The contractor shall also arrange require equipment's for attend major breakdown call like as a vacuum pump, Digital Vacuum gauge, Refrigerant recovery unit, Empty refrigerant cylinders, dehydration tank and require spanners.(v) clean the cooling tower and Drain the water and clean the sump of cooling tower, Clean pot strainer/y-strainer, check the condition of fills, if required, clean the fills with detergent, check for operation of shut off valves.(s) If AC Plant have occur any breakdown take immediate action arrange to provide all necessary material, T&P and labour, unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done on the base of Rs.3000/- per hourNote:- Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of Secondary pump, Servicing of primary & Secondary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be under items of BOQ

-

-

-

... More
M & L Descaling of 350X2=700 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

2

-

-

... More
M & L Descaling of 50X3=150 TR TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

2

-

-

... More
M & L Checking leakage and shortage of refrigerant in the machines of 350X2=700 TR/ 50X3=150 TR with soap solution and rectify the system defect causing leakage rectification including topping up of refrigerant. If leakage is not rectified by the soap solution, then nitrogen pressure testing will be carried out to identify the refrigerant leakage through the chiller machine and refilling/topping up of refrigerant. Amount quoted by the contractor should be inclusive of cost of nitrogen pressure testing including Nitrogen complete all as specified and directed by Engr-in Charge

4

-

-

... More
Supply & filling Gas R134A/ R407C of 350X2=700 TR/50X3=150 TR unit for AC Plant complete all as specified and directed by Engr-in Charge

160

-

-

... More
S&F Temperature chilled water sensor/Temperature cooling water sensor as per existing sample of AC Plant complete as in repairs all as specified and directed by Engr-in Charge

4

-

-

... More
S & F Bellows of size 250x200 mm as per existing complete as in repairs all as specified and directed by Engr-in Charge.

3

-

-

... More
S&F Differential pressure switch unit as per existing sample of 350X2=700 TR/ 50X3=150 TR Ac plant complete as in repairs all as specified and directed by Engr-in Charge.

3

-

-

... More
S & F Expansion Valve as per existing sample including all connected accessories of AC Plant complete as in repairsall as specified and directed by Engr-in Charge.

2

-

-

... More
Supply & filling Compressor Oil of AC Plant complete all as specified and directed by Engr-in Charge.

40

-

-

... More
M&L Servicing of back pull out primary chilled water pump with induction motor of Cap- 20 HP operated on 240V, 50 Hz with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete all as specified and directed by Engr-in-charge.

3

-

-

... More
M&L Servicing of back pull out Secondary chilled water pump with induction motor of Cap- 30 HP operated on 240V, 50 Hz with replacing of box set-04 Nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 Nos, Air filling in tank complete all as specified and directed by Engr-in-charge.

3

-

-

... More
M&L Servicing of back pull out condenser water pump with induction motor of Cap- 40 HP operated on 240V, 50 Hz with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete all as specified and directed by Engr-in-charge.

4

-

-

... More
M&L Servicing of back pull out chiller water pumps/condenser water pump with induction motor of Cap- 5 HP operated on 240V, 50 Hz with replacing of box set-04 Nos, mechanical seal -01 no, cut off switch 01 No, bearing 02 Nos, Air filling in tank complete all as specified and directed by Engr-in-charge.

6

-

-

... More
M&L Servicing of blowers for AHU's with induction motor of Cap- 10 HP operated on 240V, 50 Hz with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , Fan Belt complete all as specified and directed by Engr-in-Charge.

28

-

-

... More
Note for item No.12 to 16 (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps (g) Inspect shaft sleeves, shaft, bearings, bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced. (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling Fan belt etc. If found faulty to be replaced by the contractor without any extra cost.

-

-

-

... More
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity 5 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & DE moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.

2

-

-

... More
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity 10 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.

2

-

-

... More
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.

1

-

-

... More
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 30 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.

2

-

-

... More
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 40 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.

1

-

-

... More
M & L Spray oil painting of AC plant including motor, pipe Colling tower etc on existing colour complete all as specified and directed by Eng-in-Charge.

1

-

-

... More
S&F MCCB 3 pole 630 Amp, 50 KA, 415 volts 50 Hz including operating handle complete as in repairs all as specified and directed by Eng-in-Charge.

1

-

-

... More
Supply and laying PVC insulated unsheathed, multi stranded copper conductor flexible cable 1100 volt grade of size 2.5 Sqmm 3 core. laid in trenches / duct passing through pipe / duct or fixed on pole and connecting and testing complete all as specified and as directed.

180

-

-

... More
Supply and laying PVC insulated unsheathed, multi stranded copper conductor flexible cable 1100 volt grade of size 2.5 Sqmm 4 core. laid in trenches / duct passing through pipe / duct or fixed on pole and connecting and testing complete all as specified and as directed.

200

-

-

... More
S&F MCCB 3 pole 250 Amp, 36 KA, 415 volts 50 Hz including operating handle complete as in repairs all as specified and directed by Eng-in-Charge.

2

-

-

... More
S&F MCCB 3 pole 125 Amp, 16 KA, 415 volts 50 Hz including operating handle complete as in repairs all as specified and directed by Eng-in-Charge.

2

-

-

... More
Supply, laying and testing of cable XLPE insulated screened PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sqmm 3.5 core complete all as specified and directed.

120

-

-

... More
Supply, laying and testing of cable XLPE insulated screened PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 50 sqmm 3.5 core complete all as specified and directed.

155

-

-

... More
S&F Thermometer gauge with connected assembly as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

8

-

-

... More
S&F AHU Micro Fibber Primary HEPA filter as per existing sample including all connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

20

-

-

... More
M & L Motor starter of any type, carrying out repair and including replacement of defective minor spare parts such as connector, burn control copper cable, insulator, Terminal block, copper thimbles, NO NC aux block and ON/OFF push button etc or if any other required minor spare parts at site for including testing to ensure efficient and smooth functioning of starter complete as in repairs all as specified and directed by Engr-in-Charge.

10

-

-

... More
S&F Contactor of AC3, 10/20A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

12

-

-

... More
S&F Contactor of AC3, 32/40A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

8

-

-

... More
S&F Single phasing preventer as per existing sample, including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

12

-

-

... More
S&F Electronic timer as per existing sample, including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

8

-

-

... More
S&F Overload relay, 14-23A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

5

-

-

... More
S&F Overload relay, 24-40A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.

5

-

-

... More
Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is, unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done on the base of Rs. 3000/- per hour.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.