Military Engineer Services Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Costs
EMD
₹ 50,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_678859_3Tender No
8773/V/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Material & labour for 5 mm thick rendering for fair faces of concrete surfaces on ceiling in CM 1:3 for fair finished surfaces. complete all as specified and directed by Engineer-in-Charge
50
-
-
... More
Material & labour for preparation of new or previously untreated concrete or PCC block masonry external surfaces and applying two coats of exterior emulsion paint (in camouflage pattern as approved by the GE) over a coat of primer complete all as specified and directed by Engineer-in-Charge.
170
-
-
... More
Material & labour for preparation new untreated surfacsof wall and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge.
150
-
-
... More
Material & labour for preparation new untreated surfaces of ceiling/soffits of chajjas and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge.
50
-
-
... More
Supply & fix GI wire netting 0.90mm dia and 12mm mesh lathing to wood or metal studding, joists, etc. in walls, ceilings, stanchions, beams, etc. including all laps, cutting and waste complete all as specified and as directed by Engineer-in-Charge.
200
-
-
... More
Removing the pealed off postion from the RCC fins, parapet ceiling wall etc at any height including clipping cleaning with wire brush removing all loose particles making good the corroded rusted reinforcement and labour only for binding reinforcement by welding/tying with MS annealed wire not less than 0.90mm and gunnitting the area with minimum pressure of 5 Kg/Sq.cm to an average thickness of 25 to 30mm in CM 1:2 by using approved WPC @ 3% by weight of cement and finish the surface even and smooth without using extra cement complete all as specified and as directed by Engineer-in-Charge.
50
-
-
... More
Material & labour for applying one coat of anti- corrosive primer as per manufacturers instructions to exposed old and new reinforcement to the full circumference and l and length of barsa to form unbroken 40 micron thick film complete all as specified and as directed by Engineer-in-Charge.
100
-
-
... More
Taking out settled soil/broken stone aggregates size exc 40 mm to 65 mm at traverse walls area not exc 1.50 m depth and getting out in any type of soils complete all as specified and as directed by Engineer-in-Charge.
766.25
-
-
... More
Removal of excavated soil to a distance exc 1.5Km and n exc 5Km and depositing where directed complete all as specified and as directed by Engineer-in-Charge.
350
-
-
... More
Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and as directed by Engineer-in-Charge.
416.25
-
-
... More
Forming embankments including raising earth (solids), spreading in layers n exc. 30cm thick; watering ramming/ rolling and finishing to required size, shape, etc., n exc 1.5m high from base; including complete all as specified and as directed by Engineer-in-Charge. (Note – Preamble no 3.6 of SSR Pt-I shall be applied for deduction from filling to achieve final volume for payment).
100
-
-
... More
Forming embankments including raising earth (solids), spreading in layers n exc. 30cm thick; watering ramming/ rolling and finishing to required size, shape, etc., but exc 1.5m and n. exc 3m high from base; including complete all as specified and as directed by Engineer-in-Charge. (Note – Preamble no 3.6 of SSR Pt-I shall be applied for deduction from filling to achieve final volume for payment).
120
-
-
... More
Forming embankments including raising earth (solids), spreading in layers n exc. 30cm thick; watering ramming/ rolling and finishing to required size, shape, etc., but exc 3.0m and n. exc 4.50m high from base; including complete all as specified and as directed by Engineer-in-Charge. (Note – Preamble no 3.6 of SSR Pt-I shall be applied for deduction from filling to achieve final volume for payment).
150
-
-
... More
Forming embankments including raising earth (solids), spreading in layers n exc. 30cm thick; watering ramming/ rolling and finishing to required size, shape, etc., but exc 4.50m and n. exc 6.0m high from base; including complete all as specified and as directed by Engineer-in-Charge. (Note – Preamble no 3.6 of SSR Pt-I shall be applied for deduction from filling to achieve final volume for payment).
150
-
-
... More
Forming embankments including raising earth (solids), spreading in layers n exc. 30cm thick; watering ramming/ rolling and finishing to required size, shape, etc., but exc 6.0m and n. exc 7.50m high from base; including complete all as specified and as directed by Engineer-in-Charge. (Note – Preamble no 3.6 of SSR Pt-I shall be applied for deduction from filling to achieve final volume for payment).
150
-
-
... More
Forming embankments including raising fine sand, spreading in layers n.exc 30 cm thick, watering, ramming/rolling and finishing to required size, shape, etc, exc 1.5 m but n.exc. 7.0m high from base of firing range and including mixing saw dust in given ratio complete all as specified and directed by Engineer-in-Charge.
Note:(i) Preamble No 3.6 of SSR Pt-I shall be applied for deduction from filling to achieve final volume of payment.
(ii) Supply only saw dust will be measured and paid separately.
96.25
-
-
... More
Supply only saw dust (wastage of wooden saw factory) (weight of saw dust bag is not less than 10.0 kg/bag) complete all as specified and directed by Engineer-in-Charge .
300
-
-
... More
Demolition of cement concrete unreinforced in ground floors/roof and pavings n.exc 15cm thick (below or above ground level) complete all as specified and directed by Engineer-in-Charge.
20
-
-
... More
Material & labour for 100mm thick PCC 1:2:4,type B1,using 20 mm graded stone aggregate as in hard standings/ pavings including use necessary formwork and finishing concrete topping even and fair without using extra cement and spike rolling to surface or making impressions of expanded metal whilst the concrete is green complete all as specified and directed by Engineer-in-Charge.
100
-
-
... More
Material & labour for 100mm thick PCC 1:4:8 type D2,using 40 mm graded stone aggregate as in hard standings/ pavings including use necessary formwork and finishing concrete topping even and fair without using extra cement and spike rolling to surface or making impressions of expanded metal whilst the concrete is green complete all as specified and directed by Engineer-in-Charge.
100
-
-
... More
Material & labour for forming contraction (Dummy) joints 65mm X 10mm wide, filled with sealing compound Gde 'B' for key scrubbing down with water etc. complete all as specified and directed by Engineer-in-Charge.
15
-
-
... More
Surface dressing n.exc 15cm deep in soft/ loose soil including cleaning away all grass vegetation, saplings, shrubs, brushwood, undergrowth, roots and trees n.exc 30cm grith and removing rubbish upto a distance of 50m outside the periphery of the area complete all as specified and as directed by Engineer-in-Charge.
300
-
-
... More
Taking out soil settled in bed of drain (moving target area) by means of excavation including removing glass, small bushes, shrubs etc and removing the excavated materals to distance exc 50 m but n.exc 100m and deposited were complete all as specified and as directed by Engineer-in-Charge.
120
-
-
... More
Supply & fix MS framed work by fabrication such as grills, gratings, etc, with ends of bars shouldered and/ or riveted, or forged into spike, framed guard bars, barred iron doors, ladders, framed balusters, walk ways railing framed of water tanks etc including portions framed and hung as gated including pintle hinges, stops, handmade sliding bolts etc conforming to Fe-290, Gde-E-165 complete all as specified and directed by Engineer-in-Charge.
670
-
-
... More
Supply & fix in repairs 4.0mm dia plain mild steel wire, galvanized class 3, in fencing including straining and fixing to wood, concrete or steel posts and/ or to straining bolts, including securing with and provision of galvanized iron tying wire, galvanized iron staples or steel pins, etc. as directed (each line of wire to be measured) complete all as specified and directed by Engineer-in-Charge.
15
-
-
... More
Material & labour for preparation of new or previously untreated steel surfaces of any description, not otherwise described, exc 10cm in width or girth and applying two coat of synthetic enamel paint (in camouflage pattern) over one coat of red oxide primer on new steel surfaces complete all as specified and directed by Engineer-in-Charge.
100
-
-
... More
Demolition of Block masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete block masonry complete all as specified and directed by Engineer-in-Charge.
34
-
-
... More
Material & labour for precast cement concrete type C1, (1:5:8) (using 20mm graded stone aggregate) solid block masonry witrh solid blocks, exc. 10 cm in width and setting in mortor (1:4) complete all as specified and as directed.
34
-
-
... More
Material & labour for providing, cement concrete type C-1 (1:3:6) (using 20mm graded stoneaggregate) in roof kerbs or mud stops, rounded or chamfered on edges, Copings etc complete all as specified and directed by Engineer-in-Charge.
1
-
-
... More
Material & labour for rendering in cement mortar (1:6), 10 mm thick on concrete surfaces or surface other than fair face of brick-work or on one side of lathing surfaces finished even and smooth complete all as specified and directed by Engineer-in-Charge.
200
-
-
... More
Material & labour for 1.25mm thick mild steel, plain, black sheet in wall cladding, steel gates and similar work, cut to size, holes punched; including round headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted or welded seams, including bending or turning up, mitred angles, etc. as required complete all as specified and directed by Engineer-in-Charge.
35
-
-
... More
Material & labour for cement Concrete 1:2:4 (12.50mm graded aggregate) in Channels, etc. in Manhole including necessary Formwork (if required) complete all as specified and directed by Engineer-in-Charge.
0.9
-
-
... More
Material & labour for extra for forming fair finished drain or channel 30 cm inner girth in cement concrete using extra cement including forms, moulds mitered/stopped ends, etc complete all as specified and directed by Engineer-in-Charge.
15
-
-
... More
Material & labour for plain Cement concrete, type D2, (1:4:8), (using 40mm graded stone aggregate) in foundation and filling mass concrete complete all as specified and as directed by Engineer-in-Charge.
2.19
-
-
... More
Material & labour for PCC 1:3:6 type C-1 (using 20mm graded stone aggregate) as in coping etc including necessary form work, weathering slightly rounded or chamfered angles and throating complete all as specified and as directed by Engineer-in-Charge.
0.6
-
-
... More
Demolition of reinforced cement concrete in any position complete all as specified and directed by Engineer-in-Charge.
2.25
-
-
... More
Material & labour for precast cement concrete 1:2:4 type B-I using 20 mm graded crushed stone aggregate as in manhole and water tank covers, drain covers complete all as specified and directed by Engineer-in-Charge.
2.25
-
-
... More
Material & labour for TMT bars 10mm dia and over, cut to length, bent to shape required, including crancking, bending spiraly for column & hooping ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia complete all as specified and directed by Engineer-in-Charge.
150
-
-
... More
Material & labour for TMT Mild steel bars 6mm to 8mm dia , cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips board. complete all as specified and directed by Engineer-in-Charge.
30
-
-
... More
Taking out soil settled in bed of drain by means of excavation including removing glass, small bushes, shrubs etc and removing the excavated materals to distance exc 50 m but n.exc 100m and deposited were complete all as specified and directed by Engr-in-Charge. .
225
-
-
... More
Material & labour for manually cleaning tha all surface removing of loose particles dust, cement etc prefebly cleaning by using mechanical equipment's like wire/Tar bruch, also use water pressure machinewash the terrace surface area open joints area then use choksey SBR-800 & Cement to grout the existing concrete roof slab then use Epoxy grout to fill up this all roof area and including existing roof treatment membrane complete all as specified and directed by Engr-in-Charge. .
225
-
-
... More
Material & labour for clean the all surface and start the water proofing chemicals application choksey colour membrane Ezee as Prime coat use 1 ltr Chemical +1 Litre water then aplications of 45 GSM gio testiles clothswoth two coats of Choksey colour membrane Ezee complete all as specified and directed by Engr-in-Charge.
225
-
-
... More
Material & labour for application of interior & exterior walls cracks cut cracks with the help of grinder then use choksey paintex -4 CNS-50 & techseal RDL PU1 etc materials to fill up this cracks complete all as specified and directed by Engineer-in-Charge
25
-
-
... More
Running welding in repairs exc 6mm not exc 9mm in any description and any position complete all as specified and directed by Engineer-in-Charge
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%