Indian Oil Corporation Limited Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Indian Oil Corporation Limited - IOCL Tender

Pipes and Pipe Related Activities
Eprocure
Opening Date14 Jul 2020
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Conducting AC interference survey, to detect presence of any AC voltage(induced owing to proximity of any HT transmission line (66 KV and above) crossing or running parallel within a distance of 20 M from the pipeline alignment as per approved procedure. The work shall be completed in all respects including survey recommending mitigation measures & post mitigation survey. The work includes all tools, tackles, consumables etc. all complete, required for survey / test as deemed necessary and as per the directions of the site engineer / Engineer-in-Charge. Note : AC interference survey shall be done at respective TLP by connecting data logger to maintain record for minimum 24 hours. The data to be submitted for each such TLP alongwith coloured graph and recommendations - AC interference survey.

12

-

12355.21

... More
Conducting Mutual Interference Survey among the new and existing pipelines / facilities(foreign) by taking PSP survey of all the pipelines as per approved procedure to determine level of interference at different places along the pipeline and at point of crossing in common ROW including identifying points and providing the data/ record in graphical form and carrying out all necessary work for mitigating the interference observed among the pipelines , including retesting the same to ensure efficacy of the remedial measures undertaken.The contractor shall submit a full final report with detailed PSP readings at all TLPs along with graphs in six sets.The item should be complete in all respect including survey, work for mitigating the interference and post mitigating survey as per specifications/directions of site engineer / Engineer-in-Charge.- Mutual Interference Survey

12

-

7713.17

... More
Conducting Current Attenuation Test (CAT) survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge.- Current Attenuation Test (CAT) survey Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.

12

-

4713.59



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.