Summary

Operation, Maintenance And Repairing Of Water Supply Scheme In All Respect I.e. All The Components Executed Under The Project Mainly Wtp / Pipelines / Civil Structures / Head Works / Sub Head Works Etc. Including Establishment Charges And All Equipments / Materials / Labour For Repairing Of Pipeline And Other Civil Works Including Water Analysis Charges, Cleaning Of All Water Storage Structure At Every Six Months, Colour Work To All Civil Structures Etc Comp. As Per Detailed Specification & Obli

BOQ Items

No BOQs Available

Annexure-1 Name of Project:.......................................................................................................... INTEGRITY PACT OUR COMITMENT We commit ourselves to trust, transparency and setting ethical standards in implementation of various works for ultimate long term benefits for society. We also reiterate our commitment to development to mutual respect and best practices for setting very high quality standards in works and attitude. OUR CONDUCT We abide to accomplish our work with • Integrity and trust • Ethics and courtesy • Transparency and quality. GWSSB Commitment Party's Commitment • To maintain high ethical standards • To ensure transparency in transactions • To ensure to abide by the terms of agreement of contract and to consider the views of parties objectively. • To try to ensure timely payments for work done. • To ensure that no improper demand is made by employees or by anyone on their behalf. • To provide maximum possible help to all contractors/ vendors/suppliers and any other party working with us so that the contracted assignment is completed in time. Executive Engineer, GWSSB, District - ........... • Not to bring pressure/recommendation from outside to influence decision. • To abide by general discipline to be maintained in our dealings. • To be prompt and reasonable in fulfilling the terms of agreement of contract and legal obligations. • To ensure high standards are set for quality of work or supplies at lowest possible cost. • Not to use any pressure, threat, intimidation or inducement of any kind of any of the employees. • To be true and honest in furnishing specification and information and make all efforts for completing the contracted assignment well in time. Signature of Contractor Building ethical Partnership and working Together Volume-IB, GCC Name of Scheme In Brief GWSSB, Gandhinagar 2 Annexure-2 Insurance The contractor shall without limiting his or the employer obligations and responsibilities insure: a) The works, together with materials and plants for incorporation therein, to the full replacement cost (Term “Cost” in this context shall include profit) b) The contractor equipments and other things brought onto the site by the contractor, for a sum sufficient to provide for their replacement at site. c) The insurance detailed above shall be in the joint names of the contractor and the employer at the contractor’s cost and shall cover the employer and the contractor against all loss or damage from whatsoever cause arising from the start of date of work to the completion of operation and maintenance period as per the scope of work. Any amount not insured or not recovered from the insurer shall be borne by the Employer or the contractor in accordance with their responsibilities under Clause-1. The contractor shall except if and so far as the contractor provides otherwise, indemnity the Employer against all losses and claims in respect of, a) Death or injury to any person, or b) Loss of or damage to any property (other than the works) which may arise out of in consequent of the Operation and maintenance of the facility and the remedying of any defects therein, and against all claims proceedings, costs, charges, and expenses whatsoever in respect thereof or in relation thereto. The “Expectations” referred to are: a) The permanent use or occupation of land by the works, or any part thereof, b) The right of then Employer to execute the works , or any part thereof on, under in or through any land c) Damage to property which is the unavoidable result of the execution and completion of the works or remedying of any defects therein, in accordance with the contract and d) Death of or injury to persons or loss of or damage to the property resulting from any act or neglect the Employer ,his agent, servant or other contractor not being employed by the Contractor or in respect of any claims pro

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.