Gujarat Water Supply And Sewerage Board Tender

View complete overview of Gujarat GWSSB Tender

Costs

Summary

Faliya Connectivity Package 8 (gangaradi Jesawada) Regional Water Supply Scheme Taluka : Dahod, Garbada & Dhanpur Dist.: Dahod

Description

Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    Unregistered TenderId
  • BidAward Id

    Unregistered BidAwardId
  • Tender No

    Data for unregistered User Data for unregistered User Data for unregistered User Data for unregistered User
  • Tender Authority

    Data for unregistered User Data for unregistered User Data for unregistered User Data for unregistered User
  • Purchaser Address

    Authority for unregistered User
  • Email

    Data for unregistered User
  • Website

    wwww.unregistereduser.com
https://bit.ly/3esBbI5

Volume-III, PRICE BID Package 8 (Gangaradi Jesawada) Faliya Connectivity GWSSB, Dahod 1 SCHEDULE - D PREAMBLE 1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey Contract on EPC basis, the provision of measurement will be applicable only for the assessment of value of work done for inclusion in any interim certificate for part payment to the Contractor. 2. The Schedule specifies the procedure for all such assessment of the items specified in Schedule B. 3. Each item of Schedule-B has been divided into broad components. The Employer's Representative shall assess the value of each component as indicated in paragraph 6 herein below. 4. Percentages are indicated against each component of each items specified in Schedule B, based on the Employer's best appreciation of the value of the component as related to the total costs of the concerned item as whole. A head titled (any other item(s)) is included in each breakdown of schedule and the tenderer shall at the time of tendering indicate any additional items which he considers necessary but cannot be covered by any of the heads indicated in the breakup. 5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the tenderer’s scheme and design and he should take this into account while quoting his lump sum prices for the items specified in Schedule-B. 6. The contractor shall, after approval of his detailed designs and drawings furnish to the Employer's Representative an initial bill of quantities to all major items, to be reviewed and updated periodically with the Employer's Representative. This bill of quantities will be used for assessment of percentage progress of the component at any stage. By measurement jointly taken by the Employer's Representative and the Contractor, mutually agreed and entered in the measurement books in the form and by the method approved by the Employer's Representative, and signed jointly by both the parties. Volume-III, PRICE BID Package 8 (Gangaradi Jesawada) Faliya Connectivity GWSSB, Dahod 2 BREAK UP FOR INTERIM PAYMENTS (CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS) Item Description of Items Percentage Payment to be released 1 PIPELINE a. On receipt of materials at project site 65 % of Quoted rate b. On Excavation, Lowering, laying and Jointing 20 % of Quoted rate c. On Hydraulic testing 5 % of Quoted rate d. On refilling and disposal of surplus stuff 5 % of Quoted rate e. After commissioning 5 % of Quoted rate 2 VALVES a. On receipt of materials on site 70 % of Quoted rate b. On erection 20 % of Quoted rate c. On Hydraulic testing 5 % of Quoted rate d. After commissioning 5 % of Quoted rate 3 GROUND (UNDERGROUND) LEVEL SERVICE RESERVOIRS/SUMPS a. On approval of designs 2 % of Quoted rate b. On completion of excavation and base slab 18 % of Quoted rate c. On completion of vertical wall and braces 20 % of Quoted rate d. Full supporting structure including column, ring beam and completion of top slab / dome 15 % of Quoted rate e. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate f. Procurement and fixing of inlet, outlet, washout, overflow pipes, valves, specials, chambers, lighting arrester conductor and specials at site 15 % of Quoted rate g. Water level indictor, painting of letters, M.S ladder, pipes, railing and all miscellaneous items such as exterior whether proof emulsion paint in three coats etc (Completed with all respect) including water tightness test 10 % of Quoted rate h. On hydraulic testing 10 % of Quoted rate 4 All Electro-mechanical works and Instrumentation Mini Scheme, Micro Scheme, Solar Machinery, Pumping Machinery a. On supply of material at work site in good condition 65% of Quoted rate b. On erection of Equipment 25% of Quoted rate c. On comp

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.