Military Engineer Services Tender
Take tender evaluation notes for Goa MES Tender
Costs
EMD
₹ 2,53,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MES_701759_1Tender No
81073/C/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(n) Construction of RCC Tanks for various components of 40 KLD STP with permanent specifications Scope of STP covers all civil, electrical & mechanical components after end of sewage line till end of tertiary treatment and including treated storage water tank with minimum RCC M-30 design mix including excavation in any type of strata, foundation concrete, footings, raft, plinth beam, column, lintel, roof beam, roof slab, internal and external plastering, finishing, roof treatment, plinth protection, including refilling of earth and disposal of surplus earth within 500m lead etc. all as specified and as directed.
(o) Construction of RCC Machine room for 40 KLD STP with permanent specification of 10sqm plinth area with minimum RCC M-30 design mix including excavation in any type of strata, foundation concrete, footings, raft, plinth beam, column, lintel, roof beam, roof slab, solid block walling, internal and external plastering, finishing, roof treatment, Anti termite treatment, Aluminium doors and windows, plinth protection, including refilling of earth and disposal of surplus earth within 500m lead etc. all as specified and as directed. (p) The Effluent (Treatment) Sewage Parameter are as follows :- (i) pH - 6.5-8.3 (ii) COD 50mg/L (iii) BOD 10mg/L (iv) TSS 10mg/L (v) Total Nitrogen - 5mg/L (vi) Total phosphorus - 1mg/L (vii) Fecal coliform - Nil (viii) Odour -No foul odour
-
-
-
... More
Notes :- (a) Design of STP shall be got vetted by IIT/NIT and thereafter it shall be approved by Accepting Officer before execution on ground. The soil test report of adjacent site is enclosed and bore hole No. 01 is nearest to the site of STP. Hence the data of borehole No 01 shall be used for design of foundation of all structures/components.
(b) The description of item of STP in BOQ is in brief and all components required as per design to treat the influent to specified degree are included in the scope of item of STP even if the description of item above does not specify the same. (c) The scope of item of STP given in BOQ starts from end point of sewage line network. Hence necessary RCC sewage collection well/sump alongwith necessary sewage pumps of adequate capacity in 01 working + 01 standby configuration for each location are part of STP item and accordingly rate shall be quoted for the STP. (d) Wherever pumping is required in STP after end of sewer network till storage tank of treated effluent the same shall be provided by suitable pumps and for each stage two pumps (One working + one standby) shall be provided as per design requirement. Rate quoted for item of STP shall be inclusive of the provision. (e) The STP shall be based on SBR (Sequencing batch reactor) technology and design shall be accordingly carried out. (f) The treated water after tertiary treatment shall be fit for arboriculture activities etc.
(g) All civil, electrical and mechanical components required after end of sewer network till delivery of treated effluent including storage tank of treated effluent before its pumping are covered under the item of STP and shall be inclusive in rate quoted for item of STP.
(h) The quantities of various components if given in description of item are tentative and actual quantities as per design of STP for specified capacity shall be considered while quoting the rate for STP.
(j) The initial site preparation including removal of bushes/ grass/ vegetation, surface excavation and site clearence after completion of work shall also be included in the quoted rate and nothing extra shall be paid for the same.
-
-
-
... More
PHASE-II : (ITEM No. 2.00 and 3.00)
(A) COMPREHENSIVE MAINTENANCE: Material & labour for comprehensive maintenance of the above STP for the period of 120 months after completion of Phase-I. The scope of comprehensive maintenance includes maintenance of complete infrastucture under this work and replacing all defective components and restoring any defect/ deformity/ wear and tear during defect liability period of two years and comprehensive maintenance of all STP components under this job, (Sl. Item No 1.00 to 1.03) including all pumps and LT panels in the scope of entire tender for further period of eight years after completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling system, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manuafactures instructions and as specified and directed by Engr-in-charge.
NOTE: (a) Comprehensive maintenance includes replacement of all defective/ worn out/damaged parts with new parts and nothing eatra shall be paid on this account except the payment specified in this item.
(b) The contractor shall be responsible for periodic maintenance, as per maintenance schedule and specified including renewal / replacement of parts, lubricants, fittings/ fixtures, filling of bacteria, etc required for smooth functioning of the plant as per manufactures instructions. (c) The rate quoted shall be deemed to be inclusive of safety gear & required tools for maintenance. (d) The cosumable chemicals like sodium hypoclorite and chlorine shall only be supplied by AGE for treatment of sewage and all other spares/ consumable are to be provided by the contractor without any extra cost. (e) Electricity for running of plant will be provided by AGE.
-
-
-
... More
(f) The quoted rate is deemed to be inclusive of tools & testing instruments required for operation & maintenance of STP plant.
(g) The sludge cakes procured after treatment shall become contractors property and shall be removed from premises of STP as early as possible. The rate shall be quoted accordingly.
(h) In case of non function of STP plant penal recovery @ Rs. 3000/day shall be effected 24 Hrs after the defect is noticed or notified.
(j) Any defect in the motors, pumps, plant or any other part of STP shall be considered as outstanding defect and panel charge shall be applicable as above note.
-
-
-
... More
Comprehensive maintenance as per description given above for 1st year of defect liability period after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 2nd year of defect liability period after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 3rd year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 4th year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 5th year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 6th year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 7th year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 8th year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 9th year after completion of Phase-I
12
-
-
... More
Comprehensive maintenance as per description given above for 10th year after completion of Phase-I
12
-
-
... More
OPERATION OF THE PLANT: Operating and keeping the STP of 40 KLD capacity in running/ operational condition by deploying FGM/ technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling system, daily checking, leakage, checking noise, cleaning of plant and its sorrounding area etc for a period of 120 months on yearwise basis including all holidays all as specified and directed by Engr-in-charge.
NOTE: (i) Contractor shall deploy Two skilled operator (FGM) per shift in two shift/ day for Operation of STP for period of 10 (ten) years after completion of Phase-I. Shift timing shall be as under:-
Shift-I: 0600 Hrs to 1400Hrs Shift-II: 1400Hrs to 2200 Hrs
(ii) The contractor shall employ FGMs having minimum qualification of ITI from recognised institute having sufficient knowledge and experience of minimum 02 years in maintenance/ operation of similar work. The operators must be competent to carry out the repairs/ maintenance of plant as required
(iii) The operaters shall maintain the desired quality treated water including tracing out and rectification of minor leakages in pipe line/ valves during the period
(iv) The operators shall operate electrical equipement, pumps and maintain the STP in workable condition by checking daily leakages, noise, cleaning the plant and its surrounding areas of plant as directed.
(v) The contractor shall maintain all registers under various rules, and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department.
(vi) The unit rate quoted shall be deemed to be included for cost of labour for daily routine maintenance for trouble free functioning of installation.
(vii) The quoted rate shall be deemed to be inclusive all consumables required for operation of STP except sodium hypochlorite and chlorine.
(viii) The payment to the staff employed shall be made within first week of every month through online mode in employees respective Bank Account. No payments to contractors/ firms will be made unless proof of payment of wages/EPF/ESI etc through bank account is submitted by the contractor to all employees. Contractor shall produce details of payment made to the employees along with supporting documents for the verification of Engineer-in-charge for processing the monthly/ final bills. In case of revision in pay slab by Government during the currency of contract, same shall be paid to the employee by the contractor and accordingly rates shall be quoted.
-
-
-
... More
Opration of plant as per terms & condition above for 1st year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 2nd year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 3rd year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 4th year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 5th year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 6th year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 7th year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 8th year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 9th year after completion of Phase-I
12
-
-
... More
Opration of plant as per terms & condition above for 10th year after completion of Phase-I
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%